Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1 41st St Ne, Washington, Dc 20019 We will perform two geotechnical borings on the proposed site. One boring will be advanced to a depth of feet, and one boring will be advanced to a depth of feet below existing grades. The borings will be located within the bounds of the project site. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings will be performed utilizing a truck mounted drill rig and will generate an approximately 6-inch annulus. After geotechnical exploration is finished, the backfill of the borings will be with bentonite slurry that has a minimum mix design of two pounds bentonite powder to one gallon water. Date: March 12, 2013 Client: Wendy Scott Dc Preparatory Academy | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300153 |