Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 825 Pacific Ave Alameda Ca 94501 San Diego Ca Upgrade main service to 2 amp. Rewire house except kitchen, dining, garage. (24) outlets, (10) switches, (3) fan lights, (3) lights, (1) fan light heater, (4) smoke alarms. Permit status: Permit issued | Expiration date: October 3, 2020 | Permit id: E17-0293 | |||||
SCORE 79 14 Justin Cir Alameda Ca 94502 San Diego Ca Replace (e) subpanel in garage with 30 40, same location, no new feeder. (elec) Permit status: Permit finaled | Completion date: October 9, 2017 | Expiration date: September 6, 2020 | Permit id: E17-0263 | |||||
SCORE 79 1303 Caroline St Alameda Ca 94501 San Diego Ca Add new 1 amp subpanel at interior wall at detached garage; add new car charger outlet at garage interior wall ; if no main at subpanel provide disconnect switch at exterior wall per code. (elec.) submitted revised drawing of (e) main panel, revised rigid pipe depth. (07-26-17 j. C.) submitted additional plan and added three (n) outlets in backyard. Em fixed to concrete. 9-7-17. Pj fh Permit status: Permit finaled | Completion date: September 14, 2017 | Expiration date: July 24, 2020 | Permit id: E17-0200 | |||||
SCORE 79 1303 Caroline St Alameda Ca 94501 San Diego Ca Add 3 outside outlets and 1 motion sensor light (elec) Permit status: Permit finaled | Completion date: October 26, 2017 | Expiration date: October 15, 2020 | Permit id: E17-0309 | |||||
SCORE 79 937 Lincoln Ave Alameda Ca 94501 San Diego Ca Upgrade electric panel to 2 amp. Rewire 46 outlets and 18 lights. (elec) Permit status: Permit finaled | Completion date: June 13, 2017 | Expiration date: April 25, 2020 | Permit id: E17-0102 | |||||
SCORE 79 3008 Fairview Ave Alameda Ca 94501 San Diego Ca Upgrade main service panel to 2 amp; install 16 outlets; 25 lights; 2 fans: elec. Work is in living, dining, entry, stairs and bedroom 1 on first floor; bedrooms 2 and 3, hallway on 2nd floor. (elec.) Permit status: Permit finaled | Completion date: June 8, 2017 | Expiration date: May 3, 2020 | Permit id: E17-0109 | |||||
SCORE 79 3225 Fairview Ave Alameda Ca 94501 San Diego Ca Upgrade main service to 2 amp. Rewire garage; (4) outlets, (1) light, (2) switches. Add (1) light & switch at living room. Permit status: Permit finaled | Completion date: November 8, 2017 | Expiration date: October 3, 2020 | Permit id: E17-0291 | |||||
SCORE 79 Permit status: Permit issued | Expiration date: November 12, 2020 | Permit id: E17-0363 | |||||
SCORE 79 308 Lina Ave Alameda Ca 94501 San Diego Ca Add (1) receptacle at kids bathroom, (1) receptacle at guest closet, (2) receptacles at upstairs hallway. Permit status: Permit finaled | Completion date: November 20, 2017 | Expiration date: November 12, 2020 | Permit id: E17-0364 | |||||
SCORE 79 4 Cola Ballena D Alameda Ca 94501 San Diego Ca Unit d - kitchen electrical upgrade and relocate subpanel from closet to hallway. (elec) Permit status: Permit finaled | Completion date: November 29, 2017 | Expiration date: September 10, 2020 | Permit id: E17-0264 | |||||
SCORE 79 1804 Walnut St Alameda Ca 94501 San Diego Ca Rewire 2 outlets in living room; replace 1 fan in main bathroom; rewire 1 light and switch in laundry room; rewire 1 light and switch in 1 2 bathroom per 2016 code. ( elec.) Permit status: Permit finaled | Completion date: October 4, 2017 | Expiration date: September 27, 2020 | Permit id: E17-0287 |