SCORE 100 Date: April 11, 2006 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Permisud | Permit id: 0604110034 | |||||
SCORE 100 Date: July 12, 2007 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Permisud | Permit id: 0707120023 | |||||
SCORE 100 Date: May 15, 2008 Contractor: Vigil Air Applicant: Vigil Susanna | Permit status: Permisud | Permit id: 0805150030 | |||||
SCORE 100 Date: June 20, 2008 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 0806200022 | |||||
SCORE 100 Date: April 28, 2009 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Finaled | Completion date: June 10, 2009 | Permit id: 0904280016 | |||||
SCORE 100 Date: June 1, 2009 Contractor: Vigil Air Applicant: Robert Vigil | Permit status: Finaled | Completion date: June 18, 2009 | Permit id: 0906010003 | |||||
SCORE 100 Date: August 20, 2009 Contractor: Vigil Air Applicant: Vigil | Permit status: Permisud | Permit id: 0908200033 | |||||
SCORE 100 Date: September 10, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 17, 2009 | Permit id: 0909100025 | |||||
SCORE 100 Date: September 15, 2011 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: November 28, 2011 | Permit id: 1109150035 | |||||
SCORE 100 Date: April 9, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Permit id: 1204090029 | |||||
SCORE 100 Date: September 19, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1209190061 | |||||
SCORE 100 Date: January 2, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: April 19, 2013 | Permit id: 1301020024 | |||||
SCORE 100 Date: September 10, 2013 Contractor: Vigil Air Applicant: Vigil S. | Permit status: Permisud | Permit id: 1309100035 | |||||
SCORE 100 Date: December 17, 2013 Contractor: Vigil Air Applicant: Susy Vigil Andres | Permit status: Finaled | Completion date: February 2, 2014 | Permit id: 1312170034 | |||||
SCORE 100 Date: February 26, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1402260013 | |||||
SCORE 100 Date: July 12, 2007 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Permisud | Permit id: 0707120014 | |||||
SCORE 100 Date: April 24, 2009 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Permisud | Permit id: 0904240003 | |||||
SCORE 100 Date: June 1, 2009 Contractor: Vigil Air Applicant: Robert Vigil | Permit status: Finaled | Completion date: June 18, 2009 | Permit id: 0906010001 | |||||
SCORE 100 Date: July 13, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 0907130010 | |||||
SCORE 100 Date: August 20, 2009 Contractor: Vigil Air Applicant: Vigil | Permit status: Permisud | Permit id: 0908200009 | |||||
SCORE 100 Date: September 1, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 8, 2009 | Permit id: 0909010009 | |||||
SCORE 100 Date: September 10, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 5, 2009 | Permit id: 0909100007 | |||||
SCORE 100 Date: September 10, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 17, 2009 | Permit id: 0909100008 | |||||
SCORE 100 Date: October 15, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 17, 2009 | Permit id: 0910150010 | |||||
SCORE 100 Date: October 15, 2009 Contractor: Vigil Air Applicant: Russell Maricela | Permit status: Permisud | Permit id: 0910150011 | |||||
SCORE 100 Date: July 28, 2010 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Finaled | Completion date: January 27, 2011 | Permit id: 1007280009 | |||||
SCORE 100 Date: August 26, 2011 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 26, 2011 | Permit id: 1108260012 | |||||
SCORE 100 Date: September 15, 2011 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: November 28, 2011 | Permit id: 1109150026 | |||||
SCORE 100 Date: December 20, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1112200014 | |||||
SCORE 100 Date: April 9, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Permit id: 1204090007 | |||||
SCORE 100 Date: August 15, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Permit id: 1208150017 | |||||
SCORE 100 Date: September 19, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1209190033 | |||||
SCORE 100 Date: October 29, 2012 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Permisud | Permit id: 1210290004 | |||||
SCORE 100 Date: January 2, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: April 19, 2013 | Permit id: 1301020010 | |||||
SCORE 100 Date: February 6, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1302060024 | |||||
SCORE 100 Date: May 10, 2013 Contractor: Vigil Air Applicant: Suzy | Permit status: Finaled | Completion date: June 14, 2013 | Permit id: 1305100013 | |||||
SCORE 100 17982 Calle Los Arboles Rowland Heights Ca 91748 Condenser furnace and coil replacement. Replace 6 ducts Date: May 22, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1305220014 | |||||
SCORE 100 Date: July 29, 2013 Contractor: Vigil Air Applicant: Susy | Permit status: Permisud | Permit id: 1307290002 | |||||
SCORE 100 Date: September 10, 2013 Contractor: Vigil Air Applicant: Vigil S. | Permit status: Permisud | Permit id: 1309100020 | |||||
SCORE 100 Date: February 26, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1402260009 | |||||
SCORE 100 Date: September 25, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1409250013 | |||||
SCORE 100 Date: August 20, 2009 Contractor: Vigil Air Applicant: Vigil | Permit status: Permisud | Permit id: 0908200011 | |||||
SCORE 100 Date: January 2, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: April 19, 2013 | Permit id: 1301020016 | |||||
SCORE 100 Date: September 10, 2013 Contractor: Vigil Air Applicant: Vigil S. | Permit status: Permisud | Permit id: 1309100015 | |||||
SCORE 100 Date: January 17, 2008 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2008 | Permit id: 0801170021 | |||||
SCORE 100 Date: August 5, 2010 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 8, 2010 | Permit id: 1008050025 | |||||
SCORE 100 Date: October 22, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 22, 2012 | Permit id: 1210220047 | |||||
SCORE 100 Date: August 8, 2013 Contractor: Vigil Air Applicant: Maricela | Permit status: Permisud | Permit id: 1308080005 | |||||
SCORE 100 Date: September 1, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: September 12, 2006 | Permit id: 0609010012 | |||||
SCORE 100 Date: September 25, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: October 4, 2006 | Permit id: 0609250025 | |||||
SCORE 100 Date: October 10, 2006 Contractor: Vigil Air Applicant: Vigil; Susana | Permit status: Finaled | Completion date: March 7, 2007 | Permit id: 0610100014 | |||||
SCORE 100 Date: December 11, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: October 9, 2007 | Permit id: 0612110012 | |||||
SCORE 100 Date: December 20, 2006 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Finaled | Completion date: April 6, 2007 | Permit id: 0612200004 | |||||
SCORE 100 Date: August 10, 2007 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: August 21, 2007 | Permit id: 0708100008 | |||||
SCORE 100 Date: August 28, 2007 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2008 | Permit id: 0708280010 | |||||
SCORE 100 Date: March 19, 2009 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Permisud | Permit id: 0903190012 | |||||
SCORE 100 Date: August 5, 2010 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 8, 2010 | Permit id: 1008050012 | |||||
SCORE 100 Date: August 26, 2010 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 23, 2011 | Permit id: 1008260018 | |||||
SCORE 100 Date: January 3, 2011 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: January 20, 2011 | Permit id: 1101030007 | |||||
SCORE 100 10863 Kane Av Whittier Ca 90601 Replace furnace & a/c (to complete work on expired permit me0903190012) Date: July 12, 2011 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Permisud | Completion date: August 5, 2011 | Permit id: 1107120021 | |||||
SCORE 100 Date: October 22, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 22, 2012 | Permit id: 1210220014 | |||||
SCORE 100 Date: July 15, 2013 Contractor: Vigil Air Applicant: Vigil Suzy | Permit status: Finaled | Completion date: November 7, 2014 | Permit id: 1307150016 | |||||
SCORE 100 Date: May 14, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1405140008 | |||||
SCORE 100 Date: October 6, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 9, 2015 | Permit id: 1410060019 | |||||
SCORE 100 Date: August 5, 2010 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 8, 2010 | Permit id: 1008050015 | |||||
SCORE 100 Date: August 26, 2010 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 23, 2011 | Permit id: 1008260019 | |||||
SCORE 100 Date: August 15, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0608150040 | |||||
SCORE 100 Date: May 7, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0905070003 | |||||
SCORE 100 Date: December 2, 2010 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: January 24, 2011 | Permit id: 1012020024 | |||||
SCORE 100 Date: July 13, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 2, 2011 | Permit id: 1107130033 | |||||
SCORE 100 Date: October 12, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 8, 2011 | Permit id: 1110120054 | |||||
SCORE 100 2504 Mary St La Crescenta Montrose Ca 91020 Replace circuit for ac and upgrade main service panel to 2 amps. Date: February 11, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 21, 2013 | Permit id: 1302110035 | |||||
SCORE 100 Date: July 29, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1307290034 | |||||
SCORE 100 Date: August 15, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0608150012 | |||||
SCORE 100 Date: August 22, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: September 14, 2006 | Permit id: 0608220011 | |||||
SCORE 100 Date: July 11, 2008 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: July 28, 2008 | Permit id: 0807110016 | |||||
SCORE 100 Date: July 13, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 0907130008 | |||||
SCORE 100 Date: December 2, 2010 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: January 24, 2011 | Permit id: 1012020015 | |||||
SCORE 100 Date: July 13, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 2, 2011 | Permit id: 1107130020 | |||||
SCORE 100 Date: October 12, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 8, 2011 | Permit id: 1110120016 | |||||
SCORE 100 Date: July 11, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1207110007 | |||||
SCORE 100 Date: July 18, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1207180021 | |||||
SCORE 100 Date: December 4, 2012 Contractor: Vigil Air Applicant: Vigil Suzy | Permit status: Finaled | Completion date: December 14, 2012 | Permit id: 1212040013 | |||||
SCORE 100 Date: January 4, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 11, 2013 | Permit id: 1301040006 | |||||
SCORE 100 Date: February 11, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 21, 2013 | Permit id: 1302110017 | |||||
SCORE 100 Date: July 29, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1307290009 | |||||
SCORE 100 Date: December 2, 2010 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: January 24, 2011 | Permit id: 1012020008 | |||||
SCORE 100 Date: October 12, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 8, 2011 | Permit id: 1110120024 | |||||
SCORE 100 Date: September 27, 2006 Contractor: Vigil Air Applicant: Roberto Vigil | Permit status: Permisud | Permit id: 0609270018 | |||||
SCORE 100 Date: July 9, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0907090019 | |||||
SCORE 100 Date: October 20, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0910200031 | |||||
SCORE 100 Date: January 19, 2011 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: April 20, 2011 | Permit id: 1101190043 | |||||
SCORE 100 Date: January 19, 2011 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: March 24, 2011 | Permit id: 1101190044 | |||||
SCORE 100 Date: January 15, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: March 20, 2013 | Permit id: 1301150056 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Vigil Air Applicant: Suzy Vigil | Permit status: Permisud | Permit id: 1301240041 | |||||
SCORE 100 Date: June 19, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 1, 2013 | Permit id: 1306190033 | |||||
SCORE 100 Date: July 16, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: September 24, 2013 | Permit id: 1307160037 | |||||
SCORE 100 Date: November 18, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2014 | Permit id: 1311180007 | |||||
SCORE 100 Date: April 24, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 14, 2014 | Permit id: 1404240051 | |||||
SCORE 100 Date: September 15, 2014 Contractor: Vigil Air Applicant: Vigil,Susy | Permit status: Permisud | Permit id: 1409150025 | |||||
SCORE 100 Date: February 8, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: April 14, 2006 | Permit id: 0602080015 | |||||
SCORE 100 Date: March 22, 2006 Contractor: Vigil Air Applicant: Roberto Vigil | Permit status: Permisud | Permit id: 0603220027 | |||||
SCORE 100 Date: July 10, 2006 Contractor: Vigil Air Applicant: Suana Vigil | Permit status: Permisud | Permit id: 0607100014 | |||||
SCORE 100 Date: October 24, 2006 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 0610240011 | |||||
SCORE 100 Date: March 28, 2008 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 0803280010 | |||||
SCORE 100 Date: November 25, 2008 Contractor: Vigil Air Applicant: Vigil,Roberto | Permit status: Permisud | Permit id: 0811250009 | |||||
SCORE 100 Date: July 9, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0907090008 | |||||
SCORE 100 Date: July 29, 2009 Contractor: Vigil Air Applicant: Vigil,Susy | Permit status: Finaled | Completion date: September 22, 2009 | Permit id: 0907290010 | |||||
SCORE 100 Date: October 20, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0910200015 | |||||
SCORE 100 Date: December 16, 2009 Contractor: Vigil Air Applicant: Maricela Russell | Permit status: Finaled | Completion date: March 9, 2010 | Permit id: 0912160010 | |||||
SCORE 100 Date: June 25, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: June 27, 2012 | Permit id: 1206250026 | |||||
SCORE 100 Date: January 15, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: March 20, 2013 | Permit id: 1301150032 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Vigil Air Applicant: Suzy Vigil | Permit status: Permisud | Permit id: 1301240014 | |||||
SCORE 100 Date: June 19, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 1, 2013 | Permit id: 1306190012 | |||||
SCORE 100 Date: October 29, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: December 19, 2013 | Permit id: 1310290008 | |||||
SCORE 100 Date: October 31, 2013 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Permisud | Permit id: 1310310008 | |||||
SCORE 100 Date: November 5, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: November 14, 2013 | Permit id: 1311050011 | |||||
SCORE 100 Date: November 13, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1311130007 | |||||
SCORE 100 Date: November 18, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2014 | Permit id: 1311180003 | |||||
SCORE 100 Date: January 8, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Permit id: 1401080022 | |||||
SCORE 100 Date: July 31, 2014 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 1407310016 | |||||
SCORE 100 Date: September 15, 2014 Contractor: Vigil Air Applicant: Vigil,Susy | Permit status: Permisud | Permit id: 1409150019 | |||||
SCORE 100 Date: October 16, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Permit id: 1410160024 | |||||
SCORE 100 Date: December 18, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: April 1, 2015 | Permit id: 1412180015 | |||||
SCORE 100 Date: October 20, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0910200024 | |||||
SCORE 100 Date: January 15, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: March 20, 2013 | Permit id: 1301150024 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Vigil Air Applicant: Suzy Vigil | Permit status: Permisud | Permit id: 1301240021 | |||||
SCORE 100 Date: April 24, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 14, 2014 | Permit id: 1404240022 | |||||
SCORE 100 Date: July 31, 2014 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 1407310021 | |||||
SCORE 100 Date: September 15, 2014 Contractor: Vigil Air Applicant: Vigil,Susy | Permit status: Permisud | Permit id: 1409150020 | |||||
SCORE 100 Date: December 18, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: April 1, 2015 | Permit id: 1412180014 | |||||
SCORE 100 Date: December 12, 2005 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: March 2, 2007 | Permit id: 0512120024 | |||||
SCORE 100 Date: February 22, 2006 Contractor: Vigil Air Applicant: Vigil Air* | Permit status: Finaled | Completion date: February 23, 2006 | Permit id: 0602220001 | |||||
SCORE 100 Date: January 22, 2008 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Permit id: 0801220025 | |||||
SCORE 100 Date: May 1, 2008 Contractor: Vigil Air Applicant: Vigil Air* | Permit status: Permisud | Permit id: 0805010019 | |||||
SCORE 100 Date: December 12, 2005 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: March 2, 2007 | Permit id: 0512120044 | |||||
SCORE 100 Date: January 8, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: January 8, 2015 | Permit id: 1401080022 | |||||
SCORE 100 Date: September 15, 2014 Contractor: Vigil Air Applicant: Vigil, Susy | Permit status: Permisud | Expiration date: September 15, 2015 | Permit id: 1409150019 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Vigil Air Applicant: Suzy Vigil | Permit status: Permisud | Expiration date: January 24, 2014 | Permit id: 1301240041 | |||||
SCORE 100 Date: December 31, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: December 31, 2013 | Permit id: 1212310012 | |||||
SCORE 100 Date: January 8, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: January 22, 2014 | Expiration date: January 8, 2015 | Permit id: 1401080063 | |||||
SCORE 100 Date: October 16, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: October 16, 2015 | Permit id: 1410160024 | |||||
SCORE 100 Date: February 26, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: February 26, 2015 | Permit id: 1402260013 | |||||
SCORE 100 Date: October 31, 2013 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Permisud | Expiration date: October 31, 2014 | Permit id: 1310310008 | |||||
SCORE 100 Date: November 5, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: November 14, 2013 | Expiration date: November 5, 2014 | Permit id: 1311050011 | |||||
SCORE 100 Date: August 20, 2009 Contractor: Vigil Air Applicant: Vigil | Permit status: Permisud | Expiration date: August 20, 2010 | Permit id: 908200033 | |||||
SCORE 100 Date: September 10, 2013 Contractor: Vigil Air Applicant: Vigil S. | Permit status: Permisud | Expiration date: September 10, 2014 | Permit id: 1309100015 | |||||
SCORE 100 Date: January 2, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: April 19, 2013 | Expiration date: January 2, 2014 | Permit id: 1301020016 | |||||
SCORE 100 Date: September 10, 2013 Contractor: Vigil Air Applicant: Vigil S. | Permit status: Permisud | Expiration date: September 10, 2014 | Permit id: 1309100020 | |||||
SCORE 100 Date: October 15, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 17, 2009 | Expiration date: October 15, 2010 | Permit id: 910150010 | |||||
SCORE 100 Date: July 12, 2007 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Permisud | Expiration date: January 8, 2008 | Permit id: 707120014 | |||||
SCORE 100 Date: September 10, 2013 Contractor: Vigil Air Applicant: Vigil S. | Permit status: Permisud | Expiration date: September 10, 2014 | Permit id: 1309100035 | |||||
SCORE 100 Date: July 12, 2007 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Permisud | Expiration date: January 8, 2008 | Permit id: 707120023 | |||||
SCORE 100 Date: October 20, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: October 20, 2010 | Permit id: 910200024 | |||||
SCORE 100 Date: February 10, 2015 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: February 10, 2016 | Permit id: 1502100009 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Vigil Air Applicant: Suzy Vigil | Permit status: Permisud | Expiration date: January 24, 2014 | Permit id: 1301240021 | |||||
SCORE 100 Date: October 29, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: December 19, 2013 | Expiration date: October 29, 2014 | Permit id: 1310290008 | |||||
SCORE 100 Date: September 10, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 17, 2009 | Expiration date: September 10, 2010 | Permit id: 909100025 | |||||
SCORE 100 Date: September 15, 2014 Contractor: Vigil Air Applicant: Vigil, Susy | Permit status: Permisud | Expiration date: September 15, 2015 | Permit id: 1409150020 | |||||
SCORE 100 Date: September 15, 2011 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: November 28, 2011 | Expiration date: September 14, 2012 | Permit id: 1109150035 | |||||
SCORE 100 Date: May 20, 2015 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Permisud | Expiration date: May 19, 2016 | Permit id: 1505200016 | |||||
SCORE 100 Date: April 24, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 14, 2014 | Expiration date: April 24, 2015 | Permit id: 1404240016 | |||||
SCORE 100 Date: January 15, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: March 20, 2013 | Expiration date: January 15, 2014 | Permit id: 1301150032 | |||||
SCORE 100 Date: July 29, 2009 Contractor: Vigil Air Applicant: Vigil, Susy | Permit status: Finaled | Completion date: September 22, 2009 | Expiration date: July 29, 2010 | Permit id: 907290010 | |||||
SCORE 100 Date: March 22, 2006 Contractor: Vigil Air Applicant: Roberto Vigil | Permit status: Permisud | Expiration date: September 18, 2006 | Permit id: 603220027 | |||||
SCORE 100 Date: January 15, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: March 20, 2013 | Expiration date: January 15, 2014 | Permit id: 1301150024 | |||||
SCORE 100 Date: September 15, 2014 Contractor: Vigil Air Applicant: Vigil, Susy | Permit status: Permisud | Expiration date: September 15, 2015 | Permit id: 1409150025 | |||||
SCORE 100 Date: July 31, 2014 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: July 31, 2015 | Permit id: 1407310040 | |||||
SCORE 100 Date: July 16, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: September 24, 2013 | Expiration date: July 16, 2014 | Permit id: 1307160037 | |||||
SCORE 100 Date: January 15, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: March 20, 2013 | Expiration date: January 15, 2014 | Permit id: 1301150056 | |||||
SCORE 100 Date: July 9, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: July 9, 2010 | Permit id: 907090019 | |||||
SCORE 100 Date: April 9, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Expiration date: April 9, 2013 | Permit id: 1204090029 | |||||
SCORE 100 Date: September 19, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: September 19, 2013 | Permit id: 1209190061 | |||||
SCORE 100 Date: May 7, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: November 3, 2009 | Permit id: 905070003 | |||||
SCORE 100 Date: December 2, 2010 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: January 24, 2011 | Expiration date: December 2, 2011 | Permit id: 1012020024 | |||||
SCORE 100 Date: October 12, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 8, 2011 | Expiration date: October 11, 2012 | Permit id: 1110120054 | |||||
SCORE 100 2504 Mary St La Crescenta Montros Ca Replace circuit for ac and upgrade main service panel to 2 amps. Date: February 11, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 21, 2013 | Expiration date: February 11, 2014 | Permit id: 1302110035 | |||||
SCORE 100 Date: July 29, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: July 29, 2014 | Permit id: 1307290034 | |||||
SCORE 100 Date: March 30, 2015 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: June 9, 2015 | Expiration date: March 29, 2016 | Permit id: 1503300037 | |||||
SCORE 100 Date: August 15, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: February 11, 2007 | Permit id: 608150012 | |||||
SCORE 100 Date: August 22, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: September 14, 2006 | Expiration date: February 18, 2007 | Permit id: 608220011 | |||||
SCORE 100 Date: July 13, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: July 13, 2010 | Permit id: 907130008 | |||||
SCORE 100 Date: December 2, 2010 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: January 24, 2011 | Expiration date: December 2, 2011 | Permit id: 1012020015 | |||||
SCORE 100 Date: October 12, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 8, 2011 | Expiration date: October 11, 2012 | Permit id: 1110120016 | |||||
SCORE 100 Date: July 11, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: July 11, 2013 | Permit id: 1207110007 | |||||
SCORE 100 Date: December 4, 2012 Contractor: Vigil Air Applicant: Vigil Suzy | Permit status: Finaled | Completion date: December 14, 2012 | Expiration date: December 4, 2013 | Permit id: 1212040013 | |||||
SCORE 100 Date: January 4, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 11, 2013 | Expiration date: January 4, 2014 | Permit id: 1301040006 | |||||
SCORE 100 Date: February 11, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 21, 2013 | Expiration date: February 11, 2014 | Permit id: 1302110017 | |||||
SCORE 100 Date: July 29, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: July 29, 2014 | Permit id: 1307290009 | |||||
SCORE 100 Date: January 26, 2015 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: January 26, 2016 | Permit id: 1501260029 | |||||
SCORE 100 Date: March 30, 2015 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: June 9, 2015 | Expiration date: March 29, 2016 | Permit id: 1503300017 | |||||
SCORE 100 Date: December 2, 2010 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: January 24, 2011 | Expiration date: December 2, 2011 | Permit id: 1012020008 | |||||
SCORE 100 Date: October 12, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 8, 2011 | Expiration date: October 11, 2012 | Permit id: 1110120024 | |||||
SCORE 100 Date: March 30, 2015 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: June 9, 2015 | Expiration date: March 29, 2016 | Permit id: 1503300010 | |||||
SCORE 100 Date: August 5, 2010 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 8, 2010 | Expiration date: August 5, 2011 | Permit id: 1008050025 | |||||
SCORE 100 Date: October 22, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 22, 2012 | Expiration date: October 22, 2013 | Permit id: 1210220047 | |||||
SCORE 100 Date: January 3, 2011 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: January 20, 2011 | Expiration date: January 3, 2012 | Permit id: 1101030007 | |||||
SCORE 100 Date: October 22, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 22, 2012 | Expiration date: October 22, 2013 | Permit id: 1210220014 | |||||
SCORE 100 Date: May 14, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: May 14, 2015 | Permit id: 1405140008 | |||||
SCORE 100 Date: August 5, 2010 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 8, 2010 | Expiration date: August 5, 2011 | Permit id: 1008050015 | |||||
SCORE 100 Date: August 26, 2010 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 23, 2011 | Expiration date: August 26, 2011 | Permit id: 1008260019 | |||||
SCORE 100 Date: June 12, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: June 12, 2015 | Permit id: 1406120019 | |||||
SCORE 100 Date: January 17, 2008 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2008 | Expiration date: July 15, 2008 | Permit id: 801170021 | |||||
SCORE 100 Date: August 20, 2009 Contractor: Vigil Air Applicant: Vigil | Permit status: Permisud | Expiration date: August 20, 2010 | Permit id: 908200011 | |||||
SCORE 100 Date: February 26, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: February 26, 2015 | Permit id: 1402260009 | |||||
SCORE 100 Date: December 20, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: December 19, 2012 | Permit id: 1112200014 | |||||
SCORE 100 Date: September 19, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: September 19, 2013 | Permit id: 1209190033 | |||||
SCORE 100 Date: May 22, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: May 22, 2014 | Permit id: 1305220014 | |||||
SCORE 100 Date: August 20, 2009 Contractor: Vigil Air Applicant: Vigil | Permit status: Permisud | Expiration date: August 20, 2010 | Permit id: 908200009 | |||||
SCORE 100 Date: December 16, 2009 Contractor: Vigil Air Applicant: Maricela Russell | Permit status: Finaled | Completion date: March 9, 2010 | Expiration date: December 16, 2010 | Permit id: 912160010 | |||||
SCORE 100 Date: January 8, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: January 22, 2014 | Expiration date: January 8, 2015 | Permit id: 1401080024 | |||||
SCORE 100 Date: December 18, 2014 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: April 1, 2015 | Expiration date: December 18, 2015 | Permit id: 1412180031 | |||||
SCORE 100 Date: June 25, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: June 27, 2012 | Expiration date: June 25, 2013 | Permit id: 1206250026 | |||||
SCORE 100 Date: May 4, 2011 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: May 11, 2011 | Expiration date: May 3, 2012 | Permit id: 1105040011 | |||||
SCORE 100 Date: November 18, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2014 | Expiration date: November 18, 2014 | Permit id: 1311180003 | |||||
SCORE 100 Date: July 9, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: July 9, 2010 | Permit id: 907090008 | |||||
SCORE 100 Date: November 13, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 4, 2012 | Expiration date: November 13, 2013 | Permit id: 1211130040 | |||||
SCORE 100 Date: June 19, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 1, 2013 | Expiration date: June 19, 2014 | Permit id: 1306190012 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Vigil Air Applicant: Suzy Vigil | Permit status: Permisud | Expiration date: January 24, 2014 | Permit id: 1301240014 | |||||
SCORE 100 Date: December 31, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: December 31, 2013 | Permit id: 1212310005 | |||||
SCORE 100 Date: December 31, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: December 31, 2013 | Permit id: 1212310006 | |||||
SCORE 100 Date: April 11, 2006 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Permisud | Expiration date: October 8, 2006 | Permit id: 604110034 | |||||
SCORE 100 Date: May 15, 2008 Contractor: Vigil Air Applicant: Vigil Susanna | Permit status: Permisud | Expiration date: November 11, 2008 | Permit id: 805150030 | |||||
SCORE 100 Date: June 20, 2008 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: December 17, 2008 | Permit id: 806200022 | |||||
SCORE 100 Date: April 28, 2009 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Finaled | Completion date: June 10, 2009 | Expiration date: October 25, 2009 | Permit id: 904280016 | |||||
SCORE 100 Date: May 30, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: May 30, 2013 | Permit id: 1205300035 | |||||
SCORE 100 Date: December 17, 2013 Contractor: Vigil Air Applicant: Susy Vigil Andres | Permit status: Finaled | Completion date: February 2, 2014 | Expiration date: December 17, 2014 | Permit id: 1312170034 | |||||
SCORE 100 Date: December 12, 2005 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: March 2, 2007 | Expiration date: June 10, 2006 | Permit id: 512120024 | |||||
SCORE 100 Date: February 11, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 21, 2013 | Expiration date: February 11, 2014 | Permit id: 1302110035 | |||||
SCORE 100 Date: February 11, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 21, 2013 | Expiration date: February 11, 2014 | Permit id: 1302110017 | |||||
SCORE 100 Date: July 10, 2006 Contractor: Vigil Air Applicant: Suana Vigil | Permit status: Permisud | Expiration date: January 6, 2007 | Permit id: 607100014 | |||||
SCORE 100 Date: November 25, 2008 Contractor: Vigil Air Applicant: Vigil, Roberto | Permit status: Permisud | Expiration date: May 24, 2009 | Permit id: 811250009 | |||||
SCORE 100 Date: May 15, 2008 Contractor: Vigil Air Applicant: Vigil Susanna | Permit status: Permisud | Expiration date: November 11, 2008 | Permit id: 805150009 | |||||
SCORE 100 Date: April 11, 2006 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Permisud | Expiration date: October 8, 2006 | Permit id: 604110025 | |||||
SCORE 100 Date: December 17, 2013 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: February 2, 2014 | Expiration date: December 17, 2014 | Permit id: 1312170018 | |||||
SCORE 100 Date: April 15, 2009 Contractor: Vigil Air Applicant: Vigil Susana | Permit status: Finaled | Completion date: June 10, 2009 | Expiration date: October 12, 2009 | Permit id: 904150005 | |||||
SCORE 100 Date: May 30, 2012 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: May 30, 2013 | Permit id: 1205300009 | |||||
SCORE 100 Date: September 25, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: September 25, 2015 | Permit id: 1409250013 | |||||
SCORE 100 Date: July 29, 2013 Contractor: Vigil Air Applicant: Susy | Permit status: Permisud | Expiration date: July 29, 2014 | Permit id: 1307290002 | |||||
SCORE 100 Date: May 10, 2013 Contractor: Vigil Air Applicant: Suzy | Permit status: Finaled | Completion date: June 14, 2013 | Expiration date: May 10, 2014 | Permit id: 1305100013 | |||||
SCORE 100 Date: January 2, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: April 19, 2013 | Expiration date: January 2, 2014 | Permit id: 1301020010 | |||||
SCORE 100 Date: October 3, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: October 3, 2013 | Permit id: 1210030018 | |||||
SCORE 100 Date: August 24, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Expiration date: August 24, 2013 | Permit id: 1208240007 | |||||
SCORE 100 Date: August 15, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Expiration date: August 15, 2013 | Permit id: 1208150017 | |||||
SCORE 100 Date: July 11, 2012 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: July 11, 2013 | Permit id: 1207110008 | |||||
SCORE 100 Date: April 9, 2012 Contractor: Vigil Air Applicant: Susy V. | Permit status: Permisud | Expiration date: April 9, 2013 | Permit id: 1204090007 | |||||
SCORE 100 Date: September 15, 2011 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Finaled | Completion date: January 4, 2012 | Expiration date: September 14, 2012 | Permit id: 1109150026 | |||||
SCORE 100 Date: July 28, 2010 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Finaled | Completion date: January 27, 2011 | Expiration date: July 28, 2011 | Permit id: 1007280009 | |||||
SCORE 100 Date: October 15, 2009 Contractor: Vigil Air Applicant: Russell Maricela | Permit status: Permisud | Expiration date: October 15, 2010 | Permit id: 910150011 | |||||
SCORE 100 Date: September 10, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: December 17, 2009 | Expiration date: September 10, 2010 | Permit id: 909100008 | |||||
SCORE 100 Date: September 10, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 5, 2009 | Expiration date: September 10, 2010 | Permit id: 909100007 | |||||
SCORE 100 Date: September 1, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 8, 2009 | Expiration date: September 1, 2010 | Permit id: 909010009 | |||||
SCORE 100 Date: July 13, 2009 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: July 13, 2010 | Permit id: 907130010 | |||||
SCORE 100 Date: June 1, 2009 Contractor: Vigil Air Applicant: Robert Vigil | Permit status: Finaled | Completion date: June 18, 2009 | Expiration date: November 28, 2009 | Permit id: 906010001 | |||||
SCORE 100 Date: April 24, 2009 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Permisud | Expiration date: October 21, 2009 | Permit id: 904240003 | |||||
SCORE 100 Date: January 2, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: April 19, 2013 | Expiration date: January 2, 2014 | Permit id: 1301020024 | |||||
SCORE 100 Date: June 1, 2009 Contractor: Vigil Air Applicant: Robert Vigil | Permit status: Finaled | Completion date: June 18, 2009 | Expiration date: November 28, 2009 | Permit id: 906010003 | |||||
SCORE 100 Date: August 8, 2013 Contractor: Vigil Air Applicant: Maricela | Permit status: Permisud | Expiration date: August 8, 2014 | Permit id: 1308080005 | |||||
SCORE 100 Date: September 1, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: September 12, 2006 | Expiration date: February 28, 2007 | Permit id: 609010012 | |||||
SCORE 100 Date: September 25, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: October 4, 2006 | Expiration date: March 24, 2007 | Permit id: 609250025 | |||||
SCORE 100 Date: October 10, 2006 Contractor: Vigil Air Applicant: Vigil; Susana | Permit status: Finaled | Completion date: March 7, 2007 | Expiration date: April 8, 2007 | Permit id: 610100014 | |||||
SCORE 100 Date: December 11, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: October 9, 2007 | Expiration date: June 9, 2007 | Permit id: 612110012 | |||||
SCORE 100 Date: December 20, 2006 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Finaled | Completion date: April 6, 2007 | Expiration date: June 18, 2007 | Permit id: 612200004 | |||||
SCORE 100 Date: August 10, 2007 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: August 21, 2007 | Expiration date: February 6, 2008 | Permit id: 708100008 | |||||
SCORE 100 Date: August 28, 2007 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2008 | Expiration date: February 24, 2008 | Permit id: 708280010 | |||||
SCORE 100 Date: March 19, 2009 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Permisud | Expiration date: September 15, 2009 | Permit id: 903190012 | |||||
SCORE 100 Date: August 5, 2010 Contractor: Vigil Air Applicant: Susana Vigil | Permit status: Finaled | Completion date: October 8, 2010 | Expiration date: August 5, 2011 | Permit id: 1008050012 | |||||
SCORE 100 Date: August 26, 2010 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 23, 2011 | Expiration date: August 26, 2011 | Permit id: 1008260018 | |||||
SCORE 100 Date: July 12, 2011 Contractor: Vigil Air Applicant: Vigil Robert | Permit status: Permisud | Completion date: August 5, 2011 | Expiration date: July 11, 2012 | Permit id: 1107120021 | |||||
SCORE 100 Date: July 15, 2013 Contractor: Vigil Air Applicant: Vigil Suzy | Permit status: Finaled | Completion date: November 7, 2014 | Expiration date: July 15, 2014 | Permit id: 1307150016 | |||||
SCORE 100 Date: October 6, 2014 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 9, 2015 | Expiration date: October 6, 2015 | Permit id: 1410060019 | |||||
SCORE 100 Date: August 15, 2006 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: February 11, 2007 | Permit id: 608150040 | |||||
SCORE 100 Date: July 13, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 2, 2011 | Expiration date: July 12, 2012 | Permit id: 1107130033 | |||||
SCORE 100 Date: June 8, 2015 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: June 7, 2016 | Permit id: 1506080039 | |||||
SCORE 100 Date: July 11, 2008 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Finaled | Completion date: July 28, 2008 | Expiration date: January 7, 2009 | Permit id: 807110016 | |||||
SCORE 100 Date: July 13, 2011 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: August 2, 2011 | Expiration date: July 12, 2012 | Permit id: 1107130020 | |||||
SCORE 100 Date: June 8, 2015 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Permisud | Expiration date: June 7, 2016 | Permit id: 1506080021 | |||||
SCORE 100 Date: October 20, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: October 20, 2010 | Permit id: 910200031 | |||||
SCORE 100 Date: June 19, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: October 1, 2013 | Expiration date: June 19, 2014 | Permit id: 1306190033 | |||||
SCORE 100 Date: October 20, 2009 Contractor: Vigil Air Applicant: Vigil Air | Permit status: Permisud | Expiration date: October 20, 2010 | Permit id: 910200015 | |||||
SCORE 100 Date: October 5, 2010 Contractor: Vigil Air Applicant: Susy Vigil | Permit status: Permisud | Expiration date: October 5, 2011 | Permit id: 1010050009 | |||||
SCORE 100 Date: January 22, 2014 Contractor: Vigil Air Applicant: Vigil Roberto | Permit status: Finaled | Completion date: March 10, 2014 | Expiration date: January 22, 2015 | Permit id: 1401220009 | |||||
SCORE 100 Date: November 18, 2013 Contractor: Vigil Air Applicant: Vigil Susy | Permit status: Finaled | Completion date: February 27, 2014 | Expiration date: November 18, 2014 | Permit id: 1311180007 | |||||
SCORE 100 Date: May 22, 2013 Contractor: Vigil Air Permit status: Refund completed | Current use: Apartment | Permit id: 13044-40000-052 | |||||
SCORE 100 Date: December 5, 2016 Contractor: Vigil Air Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16044-40000-138 | |||||
SCORE 100 Date: July 6, 2015 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-40000-211 | |||||
SCORE 100 Date: March 13, 2014 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14044-40000-022 | |||||
SCORE 100 Date: January 3, 2013 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13044-40000-000 | |||||
SCORE 100 Date: March 24, 2015 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-40000-086 | |||||
SCORE 100 Date: August 30, 2017 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 17044-40000-110 | |||||
SCORE 100 Date: July 6, 2015 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15044-40000-065 | |||||
SCORE 100 Date: March 13, 2014 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14044-40000-022 | |||||
SCORE 100 Date: January 3, 2013 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13044-40000-000 | |||||
SCORE 100 Date: March 24, 2015 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-40000-086 | |||||
SCORE 100 Date: May 22, 2013 Contractor: Vigil Air Permit status: Refund completed | Current use: Apartment | Permit id: 13044-40000-052 | |||||
SCORE 100 Date: December 5, 2016 Contractor: Vigil Air Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16044-40000-138 |