Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 Date: March 30, 2004 Contractor: Verizon Structured Cabling Client: C F Tigard Elementary | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00086 | |||||
SCORE 65 Date: July 28, 2006 Contractor: Verizon Structured Cabling Client: Safeco | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2006-00179 | |||||
SCORE 65 Date: March 30, 2004 Contractor: Verizon Structured Cabling Client: Metzger Elementary | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00085 | |||||
SCORE 65 Date: March 8, 2004 Contractor: Verizon Structured Cabling Client: Tigard High School | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00059 |