Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 645 Harrison St San Francisco Ca Provide all labor wire equipment panels conduit devices and related materials; to design engineer and install new complete fire alarm and supervisory system Date: January 28, 2013 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201301288073 | |||||
SCORE 88 645 Harrison St San Francisco Ca Grnd 2nd & 4th flrs: provide all labor wire equipment panels conduit devices and related materials; to design engineer and install new complete fire alarm and supervisory system Date: January 28, 2013 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201301288072 | |||||
SCORE 88 455 Berry St San Francisco Ca Channel pump station: mezzanine ground intermediate lower - lower levels; other equpment: electrical install for fire alarm system cat. 4 ((720) x 2 hours inspections (340. 00) ref bldg. Permit # 201308063636 Date: August 28, 2013 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Complete | Permit id: E201308203039 | |||||
SCORE 88 Date: May 28, 2014 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201405289936 | |||||
SCORE 88 999 Unknown San Francisco Ca 924 skyline blvd san mateo ca 94402. Temporary power for sfpuc contract # wd - 2654r - peninsula vegetation removal 32 lts 6 switches 36 recepts 4 amps Date: April 20, 2016 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Complete | Permit id: E201604146215 | |||||
SCORE 88 698 02nd St San Francisco Ca Sffd headquarters awss pump station #1 basement partial 2/f partial 3/f & roof floor area covered under sfpuc cnwd- 2686= 14 1 sq. Ft. One (1) 40a 2p 120vac panelboard one (1) 1 kva transformer 11 lights 7 switches 3 receptacles 6 fans 3 smoke detectors disc. Switch -6 ups -1 ats 200a 4p -1 motor control center 600a 3 phase 3w -1. Date: April 24, 2015 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201504248051 | |||||
SCORE 88 425 Geneva Av San Francisco Ca Sfmta curis green famility - basement. Shop level & roof: 5 receptacles; (1) 4 #6 kcmil #3grd in 4in grs; (2) 4 #8 awg - 1 #10grd; (1) 300a 3 4w 277 - 480vac & (2) 30a 277-480vac 3 4w; 6ea: comb disc. Switch/starter & 35ea-disconnect switchers. Ok p. O. Date: December 19, 2014 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Complete | Permit id: E201412104945 | |||||
SCORE 88 Date: November 21, 2017 Contractor: U S Electric Technologies Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201711219420 |