Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 393 Highland Ave Somerville Ma Roof replacement1. Move existing ballast aside. 2. Remove existing roofing materials down to expose vapor barrier on structural deck. 3. Loose lay 3. 5" of polyisocyanurate insulation ( 2 layers 1. 5" and 2")4. Install firestone . 0 epdm roofing membrane. 5. F Permit type: Commercial other | Permit status: Issued | Permit id: B16-000376 |