Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 213 Richmond Hill Dr, Asheville, Nc 28806 March 27, 2007 1:56:57 pm pdolen sprint generator w/pad; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; building safety review comments the approved plans with the attached review comments are required to be at the job site for use by the field inspector(s) at all times. The building permit is required to be posted at the jobsite at all times. Failure to post approved permits & plans at site is a fine, fine must be paid before next inspection is requested. Building inspections contact jim reato redacted phone number electrical inspections contact - jay eichhorn redacted phone number all subcontractors need to complete trade application for project. Subcontractors need to either visit the permit office or fax copy of application to (828)redact Client: Sprint Genetator On Tower | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 07-01444 | Parcel: 20133 |