Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 75 41 Winter St Boston Ma Coordinate impairment with the buildings nfpa 241;impairment manager so that only one zone is impaired at any given time. Date: October 12, 2016 Contractor: Tom Hanson Permit type: Bfd sprinkler system | Permit id: Sprk634219 | |||||
SCORE 75 41 Winter St Boston Ma Coordinate impairment with the buildings listed impairment coordinator (per nfpa 241) so that only one zone shall be impaired at any given time. Date: October 12, 2016 Contractor: Tom Hanson Permit type: Bfd sprinkler system | Permit id: Sprk636091 | |||||
SCORE 75 Date: April 7, 2017 Contractor: Tom Hanson Client: New England Medical Center | Permit type: Bfd sprinkler system | Permit id: Sprk676432 | Parcel: 0305379025 | |||||
SCORE 75 274284 Tremont St Boston Ma Replace dry valve and flush system endlines in maintenance vehicle area lowest level bfd paid detail required - 1 officer &; 3 firefighters w pump detail to remain in place from shut down until system is tested approved and back into service Date: July 7, 2017 Contractor: Tom Hanson Client: Tufts New England Medical | Permit type: Bfd sprinkler system | Permit id: Sprk704222 | Parcel: 0305630001 | |||||
SCORE 75 Date: July 7, 2017 Contractor: Tom Hanson Client: Chilton Club | Permit type: Bfd sprinkler system | Permit id: Sprk721709 | Parcel: 0501344000 | |||||
SCORE 75 41 Winter St Boston Ma No other sprinkler zone in the building shall be impaired during this scheduled impairment. Impairment shall be coordinated with the buildings listed nfpa 241 impairment coordinator. Installation shall be in accordance with 7 cmr and nfpa 13 and isd approved shop drawings. Date: January 30, 2017 Contractor: Tom Hanson Permit type: Bfd sprinkler system | Permit id: Sprk669370 | |||||
SCORE 75 Date: April 4, 2011 Contractor: Tom Hanson Permit status: Expired | Expiration date: April 16, 2011 | Permit id: Pa10023942 |