Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Exit 2 From Interstate 295 Northbound To Malcolm X Avenue Se 2 Washington Dc Installation and directional boring of 6479 underground telecommunications facilities (diverse laterals) and 8 manholes roadways, sidewalk, and alley of 295, south capitol street, firth sterling ave, malcolm x ave, m. L. King jr. Ave. S. E, to customer premises routed as shown on the detailed construction drawings. This construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed. Date: October 8, 2012 Contractor: Timothy Donelson Level 3 Communications Llc Permit type: Excavation; vault(s) lxw, paving; roadway(s), paving; sidewalk(s), excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: April 12, 2013 | Permit id: Pa75924 |