Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 4419 39th Street Nw Washington Dc Remove existing timber wall and steps and replace with techco-bloc wall and steps. Date: December 29, 2015 Contractor: Thomas Wallerich Client: Tom Mcdonald | Permit type: Fixture; retaining wall to 42" | Permit status: Cancel/withdrawn | Expiration date: March 31, 2016 | |||||
SCORE 70 Contractor: Thomas Wallerich Permit status: 3 | Expiration date: March 31, 2016 | Permit id: 0 | |||||
SCORE 70 Contractor: Thomas Wallerich Permit status: 3 | Expiration date: March 31, 2016 | Permit id: 0 | |||||
SCORE 70 4447 Greenwich Parkway Nw Washington Dc Replace concrete steps and walk with mortared brick steps and walk Date: July 16, 2014 Contractor: Thomas Wallerich Permit type: Paving; leadwalk w/steps | Permit status: Permit expired | Expiration date: October 2, 2014 | Permit id: Pa97878 | |||||
SCORE 70 Date: May 2, 2014 Contractor: Thomas Wallerich Client: Robin Kane | Permit type: Fixture; fence to 42" (open design) | Permit status: Permit expired | Expiration date: May 8, 2014 | Permit id: Pa95038 |