Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 66 2420 Beacon St Brighton Ma 02467 Demolish the existing smokestack to an elevation just below the main roof. Infill the roof with structural framing and patch the epdm roof as required. Client: Waterworks Park | Permit type: Demolition - exterio | Current use: 7more | Permit id: Sf132103 | Parcel: 2102439060 | |||||
SCORE 66 1 Commonwealth Av Boston Ma 02116 Phase 1: isd-driven emergency make safe repairs on the exterior of the tower consisting of stone fragment and spall removal roof flashing and awning attachments cracked stone netting and louver removal. Creation of safe vertical access within the interior of the vstructure and emergency bracing and shoring of the floor structure elements. Erection of a temporary scrimmed working platform suspended from steel girders that are needled through the open "window" openings of the belvidere. Temporary acknowledgement of sponsors and donors on the scrim feet horizontally by 25 feet vertically on each face. Permit type: Other | Permit status: Open | Current use: Other | Permit id: Sf670385 | |||||
SCORE 66 24 Beacon St Brighton Ma 02467 Demolish the existing smokestack to an elevation just below the main roof. Infill the roof with structural framing and patch the epdm roof as required. Client: Whitehall Condo Trust | Permit type: Demolition - exterior | Permit status: Expired | Current use: 7more | Permit id: Sf132103 | Parcel: 2102439060 | |||||
SCORE 66 24 Beacon St Brighton Ma Demolish the existing smokestack to an elevation just below the main roof. Infill the roof with structural framing and patch the epdm roof as required. Client: Waterworks Park | Permit type: Short form bldg permit | Expiration date: October 24, 2012 | Current use: 7more | Permit id: Sf132103 | Parcel: 2102439060 | |||||
SCORE 66 1 Commonwealth Av Boston Ma Phase 1: isd-driven emergency make safe repairs on the exterior of the tower consisting of stone fragment and spall removal roof flashing and awning attachments cracked stone netting and louver removal. Creation of safe vertical access within the interior of the vstructure and emergency bracing and shoring of the floor structure elements. Erection of a temporary scrimmed working platform suspended from steel girders that are needled through the open "window" openings of the belvidere. Temporary acknowledgement of sponsors and donors on the scrim feet horizontally by 25 feet vertically on each face. Permit type: Short form bldg permit | Expiration date: July 5, 2017 | Current use: Other | Permit id: Sf670385 |