Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 2311 Connecticut Ave Nw 406, Washington, Dc 20008 The project includes the renovation of existing laundry areas on floors 1 through 7, including the infilling of floors in an abandoned elevator shaft to gain additional space for a folding area. The project also includes the renovation of an existing unisex restroom on the basement level and subdividing the existing custodians workroom on the basement level to create a new bicycle storage room and a small storage room. Demo, alterations level 2 Date: July 11, 2017 Contractor: Thomas J Striegel; Thomas Wyble Client: Mary Jeanne Doyle Trustee | Permit type: Alteration and repair | Permit status: Review in process | Permit id: B1710308 |