Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 3 Arborway Boston Ma 02130 Combine this lot pid 11033850 with 6635 sf pid 11033880 w sf 7233 pid 11033870 with 5540;sf and pid 11033860 with 6625 sf. Total square ft combined 26 033. Then subdivide into three lots. 3 arborway lot # 1;to now have;11 221 square ft lot # 2 will keep 6 847 square ft and lot # 3 will keep 6 847 square ft. As per plans. Date: August 26, 2016 Contractor: Theodore Damico Client: Damico Theodore | Permit type: Subdivision combining lot | Permit status: Open | Current use: 1-2fam | Permit id: Alt621488 | Parcel: 1103385000 | |||||
SCORE 59 3 Arborway Boston Ma Combine this lot pid 11033850 with 6635 sf pid 11033880 w sf 7233 pid 11033870 with 5540;sf and pid 11033860 with 6625 sf. Total square ft combined 26 033. Then subdivide into three lots. 3 arborway lot # 1;to now have;11 221 square ft lot # 2 will keep 6 847 square ft and lot # 3 will keep 6 847 square ft. As per plans. Date: August 26, 2016 Contractor: Theodore Damico Client: Damico Theodore | Permit type: Long form/alteration permit | Expiration date: February 26, 2017 | Current use: 1-2fam | Permit id: Alt621488 | Parcel: 1103385000 |