Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 37 O Street Nw Washington Dc The following narrative provides supporting information to obtain the required special tree permit to remove (3) existing black locust trees with trunk diameters larger than 17. 51 / 55 circumference during the renovation of the georgetown university new south student center. The applicant, whiting-turner contracting company, is proposing to install soil stabilization improvements, a retaining wall, in addition to landscapes and hardscapes within the private property of georgetown university along prospect street. The project is located on the campus of georgetown university at 37 o street nw, washington, dc 20057, square 1321, lot 1 (as recorded in plat book 133 page 50). The project includes the excavation of an existing embankment, followed by the installation of soil stabilization and improvements, a stone retaining wall, suitable backfill, a bio-filtration area, rain garden, site hardscapes and landscaping. The (3) existing black locust trees scheduled for removal will be offset by Date: January 9, 2014 Permit type: Landscaping; tree removal 12. 1" & up | Permit status: Approved (pending payment | Expiration date: February 27, 2015 | |||||
SCORE 64 37 O Street Nw Washington Dc The following narrative provides supporting information to obtain the required special tree permit to remove (3) existing black locust trees with trunk diameters larger than 17. 51 55 circumference during the renovation of the georgetown university new south student center. The applicant, whiting-turner contracting company, is proposing to install soil stabilization improvements, a retaining wall, in addition to landscapes and hardscapes within the private property of georgetown university along prospect street. The project is located on the campus of georgetown university at 37 o street nw, washington, dc 20057, square 1321, lot 1 (as recorded in plat book 133 page 50). The project includes the excavation of an existing embankment, followed by the installation of soil stabilization and improvements, a stone retaining wall, suitable backfill, a bio-filtration area, rain garden, site hardscapes and landscaping. The (3) existing black locust trees scheduled for removal will be offset by Date: January 9, 2014 Client: President & Director Of Georgetown Univ. President & Director Of Georgetown Univ. | Permit type: Landscaping; tree removal 12. 1" & up | Permit status: Cancel/withdrawn | Expiration date: February 27, 2015 | |||||
SCORE 64 Permit status: 3 | Expiration date: February 27, 2015 | Permit id: 0 | |||||
SCORE 64 Permit status: 3 | Expiration date: February 27, 2015 | Permit id: 0 |