Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1115 12th St Nw, Washington, Dc 20005 Replace 43 existing front and right side bronze aluminum double hung windows with new bronze aluminum double hung windows manufactured with insulated low e glass, argon gas, and half screens. New windows to be installed in brick openings to match windows currently in building. Replace existing rear and alley side bronze aluminum double hung windows with new bronze exterior vinyl double hung windows manufactured with insulated low e glass, argon gas, and half screens. New windows to be installed in brick openings to match windows currently in building. For condo units b1, 101,102,205,302,402, 404, 405, 501, 503, 504 & 704. Date: December 17, 2015 Contractor: The New Plaza C Supreme Aluminum Products Inc Client: The New Plaza Condominium Supreme Aluminum Products Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602952 |