Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 62 8 22nd St Nw, Washington, Dc 20037 Phase 2 fit out/interior construction of teaching and research labs which were shell condition in phase i building permit b1201357. Date: November 1, 2013 Contractor: The George Washington University Carlos Rojas Client: The George Washington University | Permit type: Tenant layout | Permit status: Permit issued | Permit id: Tl1300064 | |||||
SCORE 62 23 I St Nw, Washington, Dc 20037 Renovation of existing central utility plant. Replacement of mechanical electrical and plumbling equipment in the central utility plant in basement, replacement of rooftop equipment and associated shafts and piping. Date: May 11, 2012 Contractor: The George Washington University Carlos Rojas Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1201355 |