Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 4135 Alabama Avenue Se Washington Dc Existing driveway entrance off alabama ave to be closed and new commercial driveway entrance (20) to be opened. This will require removal of one street tree. Two existing street trees will remain on alabama ave and one new street tree will be planted. Lead walk to site will be installed off alabama ave. Configuration of boulevard lane and massachusetts ave to be adjusted to conform with ddot street standards. 15 curb radii with ada ramps will be installed. New sidewalk will be installed along north side of boulevard land with 4 planting strip. Two new street trees will be added on boulevard lane and a new grove of 7 trees will be planted in a section of row adjacent to massachusetts ave. A handrail for a set of steps will project 1-10" into this large row area adjacent to massachusetts, the handrail will not interfere with any pedestrian access areas. Date: May 18, 2016 Contractor: Ta Washington 42 Mas Llc C O David Leahy Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Assigned | Expiration date: December 31, 2016 | |||||
SCORE 70 4135 Alabama Avenue Se Washington Dc Existing driveway entrance off alabama ave to be closed and new commercial driveway entrance (20) to be opened. This will require removal of one street tree. Two existing street trees will remain on alabama ave and one new street tree will be planted. Lead walk to site will be installed off alabama ave. Configuration of boulevard lane and massachusetts ave to be adjusted to conform with ddot street standards. 15 curb radii with ada ramps will be installed. New sidewalk will be installed along north side of boulevard land with 4 planting strip. Two new street trees will be added on boulevard lane and a new grove of 7 trees will be planted in a section of row adjacent to massachusetts ave. A handrail for a set of steps will project 1-10" into this large row area adjacent to massachusetts, the handrail will not interfere with any pedestrian access areas. Date: May 18, 2016 Contractor: Ta Washington 42 Mas Llc C O David Leahy Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Assigned | Expiration date: December 31, 2016 | |||||
SCORE 70 4135 Alabama Avenue Se Washington Dc Existing driveway entrance off alabama ave to be closed and new commercial driveway entrance (20') to be opened. This will require removal of one street tree. Two existing street trees will remain on alabama ave and one new street tree will be planted. Lead walk to site will be installed off alabama ave. Configuration of boulevard lane and massachusetts ave to be adjusted to conform with ddot street standards. 15' curb radii with ada ramps will be installed. New sidewalk will be installed along north side of boulevard land with 4' planting strip. Two new street trees will be added on boulevard lane and a new grove of 7 trees will be planted in a section of row adjacent to massachusetts ave. A handrail for a set of steps will project 1'-10" into this large row area adjacent to massachusetts, the handrail will not interfere with any pedestrian access areas. Date: May 18, 2016 Contractor: Ta Washington 42 Mas Llc C O David Leahy Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Resubmitted | Expiration date: December 31, 2016 | |||||
SCORE 70 4135 Alabama Avenue Se Washington Dc Existing driveway entrance off alabama ave to be closed and new commercial driveway entrance (20) to be opened. This will require removal of one street tree. Two existing street trees will remain on alabama ave and one new street tree will be planted. Lead walk to site will be installed off alabama ave. Configuration of boulevard lane and massachusetts ave to be adjusted to conform with ddot street standards. 15 curb radii with ada ramps will be installed. New sidewalk will be installed along north side of boulevard land with 4 planting strip. Two new street trees will be added on boulevard lane and a new grove of 7 trees will be planted in a section of row adjacent to massachusetts ave. A handrail for a set of steps will project 1-10" into this large row area adjacent to massachusetts, the handrail will not interfere with any pedestrian access areas. Date: May 31, 2017 Contractor: Ta Washington 42 Mas Llc C O David Leahy Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Issued | Expiration date: December 17, 2017 | Permit id: Pa157875-R1 | |||||
SCORE 70 4135 Alabama Avenue Se Washington Dc Existing driveway entrance off alabama ave to be closed and new commercial driveway entrance (20) to be opened. This will require removal of one street tree. Two existing street trees will remain on alabama ave and one new street tree will be planted. Lead walk to site will be installed off alabama ave. Configuration of boulevard lane and massachusetts ave to be adjusted to conform with ddot street standards. 15 curb radii with ada ramps will be installed. New sidewalk will be installed along north side of boulevard land with 4 planting strip. Two new street trees will be added on boulevard lane and a new grove of 7 trees will be planted in a section of row adjacent to massachusetts ave. A handrail for a set of steps will project 1-10" into this large row area adjacent to massachusetts, the handrail will not interfere with any pedestrian access areas. Date: May 30, 2017 Contractor: Ta Washington 42 Mas Llc C O David Leahy Permit status: Permit expired | Expiration date: June 15, 2017 | Permit id: Pa157875 |