SCORE 56 415 4th Street Sw Washington Dc Install 11 new dc street lights and 5 new ddot manhole for street lighting system. Approval is based on the condition that the conduit be installed outside the tree canopy and as close to the builiding as possible; minimum distance should be 7 from the back of the tree planting boxes. Also, conduit for l-9 should not run through the lid planter box. Date: May 13, 2011 Contractor: Ta Beach Client: Washington Dc Goverment | Permit type: Excavation; manhole installation, over head work; streetlight(s) installation, excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: October 22, 2011 | Permit id: Pa62412 |