Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 New roof mounted pv system with enphase model m250-60-2ll. Total syst Date: July 30, 2014 Contractor: Svet Stefonov Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-202 | |||||
SCORE 61 807 Arbol St Los Angeles Ca 90065 New roof mounted pv system with enphase model m250-60-2ll. Total syst Date: July 30, 2014 Contractor: Svet Stefonov Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-202 | |||||
SCORE 61 807 Arbol St Los Angeles Ca 90065 San Diego Ca New roof mounted pv system with enphase model m250-60-2ll. Total syst Date: July 30, 2014 Contractor: Svet Stefonov Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-202 |