Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 63 152 Berkshire St Cambridge, Ma Structural reinforcement of existing first floor joist system and stair as per structural plans submitted, prepared and stamped by summitt engineering part of project with 146 berk and 764 cambridge - mg Permit type: Addition/alteration | Completion date: March 4, 2015 | Current use: One-family | Parcel: 3712152/2 | |||||
SCORE 63 146 Berkshire St Cambridge, Ma Structural reinforcement of existing first floor joist system and stair as per plans submitted. Prepared and stamped by summitt engineering. Part of project with 152 berks and 764 cambridge - mg Permit type: Addition/alteration | Completion date: March 4, 2015 | Current use: One-family | Parcel: 3712148/8 | |||||
SCORE 63 Montgomery St Cambridge, Ma Structural reenforcement of eisting framing on lower level and installation of concrete footings and columns as per structural plans prepared and stamped by rene mugnier assoc Permit type: Addition/alteration | Completion date: May 22, 2017 | Current use: One-family | Permit id: 0 | Parcel: 19391 |