Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 20 K St Nw, Washington, Dc 20006 The work to be performed outside of the normal working hours consists of structural column enhancements inside the building at the lower level garage area. Additionally, some conduit/piping/duct will need to be removed and portions of the slab around the upgraded columns will need to be demoed to thicken footings. ![]() ![]() Client: Na 20 K, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600417 |