Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Date: December 18, 2012 Contractor: Stanley J Holcomb Client: Gerald E Jamison | Permit status: Permit issued | Permit id: P1301761 | |||||
SCORE 93 Date: March 28, 2012 Contractor: Stanley J Holcomb Client: Joan S Keenan Trustee | Permit status: Completed | Permit id: P1204109 | |||||
SCORE 93 Date: September 7, 2012 Contractor: Stanley J Holcomb Client: Lawrence P Buchanan Trustee | Permit status: Permit issued | Permit id: P1207854 | |||||
SCORE 93 Date: December 27, 2012 Contractor: Stanley J Holcomb Client: Bank Of America N.A | Permit status: Permit issued | Permit id: P1301895 | |||||
SCORE 93 Date: May 17, 2012 Contractor: Stanley J Holcomb Client: Gloria J Campbell | Permit status: Completed | Permit id: P1205236 | |||||
SCORE 93 Date: November 5, 2012 Contractor: Stanley J Holcomb Client: David Ottogalli | Permit status: Permit issued | Permit id: P1300803 | |||||
SCORE 93 Date: December 6, 2012 Contractor: Stanley J Holcomb Permit status: Completed | Permit id: P1301508 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Kerri L Rivers | Permit status: Completed | Permit id: P1300705 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: Alexander G Bardsley | Permit status: Permit issued | Permit id: P1300299 | |||||
SCORE 93 Date: October 11, 2012 Contractor: Stanley J Holcomb Client: Charles H Clark | Permit status: Permit issued | Permit id: P1300247 | |||||
SCORE 93 Date: February 21, 2012 Contractor: Stanley J Holcomb Client: Marian Harris | Permit status: Completed | Permit id: P1203317 | |||||
SCORE 93 Date: December 6, 2012 Contractor: Stanley J Holcomb Client: Brian Cooley | Permit status: Permit issued | Permit id: P1301507 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Elizabeth C Mariantes | Permit status: Completed | Permit id: P1300414 | |||||
SCORE 93 Date: December 21, 2012 Contractor: Stanley J Holcomb Client: David L Wolf | Permit status: Completed | Permit id: P1301835 | |||||
SCORE 93 Date: January 5, 2012 Contractor: Stanley J Holcomb Client: Padabla Ltd Revocable Trust | Permit status: Permit issued | Permit id: P1202227 | |||||
SCORE 93 Date: August 20, 2012 Contractor: Stanley J Holcomb Client: Walter J Ross | Permit status: Completed | Permit id: P1207436 | |||||
SCORE 93 Date: August 2, 2012 Contractor: Stanley J Holcomb Client: Mary B Hernandez | Permit status: Completed | Permit id: P1207007 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: Paul S Armington | Permit status: Permit issued | Permit id: P1300302 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Jane A Bishop | Permit status: Completed | Permit id: P1300702 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Betty J Terrell | Permit status: Permit issued | Permit id: P1300412 | |||||
SCORE 93 Date: June 25, 2012 Contractor: Stanley J Holcomb Client: Fred Ryder Jr | Permit status: Completed | Permit id: P1206106 | |||||
SCORE 93 Date: March 28, 2012 Contractor: Stanley J Holcomb Client: John L Wilhelm Jr | Permit status: Completed | Permit id: P1204110 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Bertha L Osekre | Permit status: Completed | Permit id: P1300413 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Bennett L Hecht | Permit status: Permit issued | Permit id: P1300706 | |||||
SCORE 93 Date: June 12, 2012 Contractor: Stanley J Holcomb Client: Marcus A Maloof | Permit status: Completed | Permit id: P1205793 | |||||
SCORE 93 Date: December 27, 2012 Contractor: Stanley J Holcomb Client: James Frederick Burris Trustee | Permit status: Completed | Permit id: P1301896 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: L Huff | Permit status: Completed | Permit id: P1300300 | |||||
SCORE 93 Date: November 5, 2012 Contractor: Stanley J Holcomb Client: Rosa Trapp-Dail | Permit status: Permit issued | Permit id: P1300802 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Douglas J Montanabo | Permit status: Permit issued | Permit id: P1300704 | |||||
SCORE 93 Date: July 9, 2012 Contractor: Stanley J Holcomb Client: Anne R Litchfield | Permit status: Permit issued | Permit id: P1206400 | |||||
SCORE 93 Date: October 11, 2012 Contractor: Stanley J Holcomb Client: Norma V Craig | Permit status: Permit issued | Permit id: P1300246 | |||||
SCORE 93 Date: March 14, 2013 Contractor: Stanley J Holcomb Client: Harden Allen | Permit status: Permit issued | Permit id: P1303503 | |||||
SCORE 93 Date: March 5, 2013 Contractor: Stanley J Holcomb Client: Margaret S Judge | Permit status: Permit issued | Permit id: P1303274 | |||||
SCORE 93 Date: March 28, 2013 Contractor: Stanley J Holcomb Client: Susan B Lieberman | Permit status: Permit issued | Permit id: P1303842 | |||||
SCORE 93 Date: January 24, 2013 Contractor: Stanley J Holcomb Permit status: Permit issued | Permit id: P1302382 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Annette B Klayman | Permit status: Permit issued | Permit id: P1305034 | |||||
SCORE 93 Date: February 6, 2013 Contractor: Stanley J Holcomb Client: James C Washington Jr | Permit status: Permit issued | Permit id: P1302671 | |||||
SCORE 93 Date: November 20, 2013 Contractor: Stanley J Holcomb Client: S L Shepperson | Permit status: Completed | Permit id: P1401334 | |||||
SCORE 93 Date: March 15, 2013 Contractor: Stanley J Holcomb Client: Edward Abramson | Permit status: Completed | Permit id: P1303527 | |||||
SCORE 93 Date: August 9, 2013 Contractor: Stanley J Holcomb Client: Margaret A Escalante Trustee | Permit status: Completed | Permit id: P1307071 | |||||
SCORE 93 Date: December 5, 2013 Contractor: Stanley J Holcomb Client: Andre Peltekian | Permit status: Completed | Permit id: P1401683 | |||||
SCORE 93 Date: August 29, 2013 Contractor: Stanley J Holcomb Client: Louisa Jones | Permit status: Completed | Permit id: P1307513 | |||||
SCORE 93 Date: July 18, 2013 Contractor: Stanley J Holcomb Client: Brandon L Hunt | Permit status: Completed | Permit id: P1306488 | |||||
SCORE 93 Date: May 22, 2013 Contractor: Stanley J Holcomb Client: Robert B Davis | Permit status: Completed | Permit id: P1305160 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Athanasios Vamvakidis | Permit status: Completed | Permit id: P1305032 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Eirini Gouleta | Permit status: Completed | Permit id: P1305033 | |||||
SCORE 93 Date: October 2, 2013 Contractor: Stanley J Holcomb Client: Michael D Hamilton | Permit status: Completed | Permit id: P1400058 | |||||
SCORE 93 Date: January 8, 2013 Contractor: Stanley J Holcomb Client: Sheila M Kelly Trustee | Permit status: Completed | Permit id: P1302052 | |||||
SCORE 93 Date: September 12, 2013 Contractor: Stanley J Holcomb Client: David L Burns | Permit status: Completed | Permit id: P1307851 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: Stephen E Miles | Permit status: Completed | Permit id: P1401712 | |||||
SCORE 93 Date: February 7, 2013 Contractor: Stanley J Holcomb Client: James Frederick Burris Trustee | Permit status: Completed | Permit id: P1302706 | |||||
SCORE 93 Date: March 5, 2013 Contractor: Stanley J Holcomb Client: Susan Rubin | Permit status: Completed | Permit id: P1303273 | |||||
SCORE 93 Date: November 7, 2013 Contractor: Stanley J Holcomb Client: D Jackson | Permit status: Permit issued | Permit id: P1401015 | |||||
SCORE 93 Date: June 27, 2013 Contractor: Stanley J Holcomb Client: Gerald J Hayling | Permit status: Permit issued | Permit id: P1305999 | |||||
SCORE 93 Date: June 28, 2013 Contractor: Stanley J Holcomb Client: Joan F Kontos | Permit status: Permit issued | Permit id: P1306021 | |||||
SCORE 93 Date: January 23, 2013 Contractor: Stanley J Holcomb Client: Church Of Two Worlds | Permit status: Completed | Permit id: P1302355 | |||||
SCORE 93 Date: December 23, 2013 Contractor: Stanley J Holcomb Client: Kathryn A Mcguire Trustee | Permit status: Completed | Permit id: P1402106 | |||||
SCORE 93 Date: December 30, 2013 Contractor: Stanley J Holcomb Client: Nantz Rickard | Permit status: Completed | Permit id: P1402205 | |||||
SCORE 93 Date: October 2, 2013 Contractor: Stanley J Holcomb Client: F M Lyons | Permit status: Permit issued | Permit id: P1400057 | |||||
SCORE 93 Date: May 22, 2013 Contractor: Stanley J Holcomb Client: Wm W Baum Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1305161 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1401715 | |||||
SCORE 93 Date: August 28, 2013 Contractor: Stanley J Holcomb Client: Harry James Hargrove Trustee | Permit status: Permit issued | Permit id: P1307497 | |||||
SCORE 93 Date: August 29, 2013 Contractor: Stanley J Holcomb Client: Harry James Hargrove Trustee | Permit status: Permit issued | Permit id: P1307516 | |||||
SCORE 93 Date: October 10, 2013 Contractor: Stanley J Holcomb Client: Mary E Young | Permit status: Permit issued | Permit id: P1400272 | |||||
SCORE 93 Date: December 5, 2013 Contractor: Stanley J Holcomb Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1401684 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: John P Green | Permit status: Permit issued | Permit id: P1401714 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Joan Rosenthal Trustee | Permit status: Completed | Permit id: P1500996 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Rochelle F Washington | Permit status: Completed | Permit id: P1501851 | |||||
SCORE 93 Date: October 30, 2014 Contractor: Stanley J Holcomb Client: Ellen Taylor (life Estate) | Permit status: Completed | Permit id: P1500850 | |||||
SCORE 93 Date: December 18, 2014 Contractor: Stanley J Holcomb Client: Carolyn F Lockie | Permit status: Completed | Permit id: P1502161 | |||||
SCORE 93 Date: November 19, 2014 Contractor: Stanley J Holcomb Client: Doris F Faulkner | Permit status: Completed | Permit id: P1501347 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: James P White | Permit status: Completed | Permit id: P1501103 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Elizabeth Woldemichael | Permit status: Completed | Permit id: P1501099 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Katherine P Cartwright | Permit status: Completed | Permit id: P1501100 | |||||
SCORE 93 Date: October 1, 2014 Contractor: Stanley J Holcomb Client: Todd Edelman | Permit status: Completed | Permit id: P1500045 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Stephen R Davenport Iv | Permit status: Completed | Permit id: P1406594 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Doris M Bowser | Permit status: Completed | Permit id: P1500352 | |||||
SCORE 93 Date: September 4, 2014 Contractor: Stanley J Holcomb Client: Tufty Harold G And Barbara V | Permit status: Completed | Permit id: P1408346 | |||||
SCORE 93 Date: April 23, 2014 Contractor: Stanley J Holcomb Client: William T Bennett | Permit status: Completed | Permit id: P1405007 | |||||
SCORE 93 Date: July 17, 2014 Contractor: Stanley J Holcomb Client: Johnny A Byrd | Permit status: Completed | Permit id: P1407063 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Interdenominational Church Ushers Association Of Dc | Permit status: Completed | Permit id: P1407354 | |||||
SCORE 93 Date: April 7, 2014 Contractor: Stanley J Holcomb Client: J Haber | Permit status: Completed | Permit id: P1404596 | |||||
SCORE 93 Date: May 2, 2014 Contractor: Stanley J Holcomb Client: Ernest H Flood | Permit status: Completed | Permit id: P1405239 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Church Of Christ Inc | Permit status: Permit issued | Permit id: P1500994 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Ebenezer Methodist Church | Permit status: Permit issued | Permit id: P1500995 | |||||
SCORE 93 Date: November 19, 2014 Contractor: Stanley J Holcomb Client: S A Segal | Permit status: Permit issued | Permit id: P1501348 | |||||
SCORE 93 Date: November 20, 2014 Contractor: Stanley J Holcomb Client: Daisy T James | Permit status: Permit issued | Permit id: P1501377 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Jaired D Stallard | Permit status: Permit issued | Permit id: P1407352 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Mallikarjuna R Polam | Permit status: Permit issued | Permit id: P1407355 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Alexandra Stark | Permit status: Completed | Permit id: P1501831 | |||||
SCORE 93 Date: May 30, 2014 Contractor: Stanley J Holcomb Client: Reneau Real Estate Llc | Permit status: Permit issued | Permit id: P1405904 | |||||
SCORE 93 Date: May 14, 2014 Contractor: Stanley J Holcomb Client: Nancy S Pigman Trustee | Permit status: Permit issued | Permit id: P1405512 | |||||
SCORE 93 Date: August 18, 2014 Contractor: Stanley J Holcomb Client: Nathanielp Moore | Permit status: Permit issued | Permit id: P1407888 | |||||
SCORE 93 Date: December 30, 2014 Contractor: Stanley J Holcomb Client: Daniel J Harper | Permit status: Permit issued | Permit id: P1502354 | |||||
SCORE 93 Date: January 17, 2014 Contractor: Stanley J Holcomb Client: Edwin A Bonilla | Permit status: Permit issued | Permit id: P1402614 | |||||
SCORE 93 Date: March 6, 2014 Contractor: Stanley J Holcomb Client: Peter R Kolker | Permit status: Permit issued | Permit id: P1403746 | |||||
SCORE 93 Date: June 12, 2014 Contractor: Stanley J Holcomb Client: Elizabeth A Henneke | Permit status: Permit issued | Permit id: P1406196 | |||||
SCORE 93 Date: August 4, 2014 Contractor: Stanley J Holcomb Client: M F Gaskins | Permit status: Permit issued | Permit id: P1407542 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Susan O Gilbert | Permit status: Permit issued | Permit id: P1406595 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Wanda D Busby | Permit status: Permit issued | Permit id: P1500353 | |||||
SCORE 93 Date: November 13, 2014 Contractor: Stanley J Holcomb Client: Kenneth R Stinson | Permit status: Completed | Permit id: P1501186 | |||||
SCORE 93 Date: February 4, 2015 Contractor: Stanley J Holcomb Client: Carolyn F Bemis | Permit status: Completed | Permit id: P1503237 | |||||
SCORE 93 Date: January 7, 2015 Contractor: Stanley J Holcomb Client: Rachel M Lawrence | Permit status: Completed | Permit id: P1502471 | |||||
SCORE 93 Date: March 4, 2015 Contractor: Stanley J Holcomb Client: D Gainsburg | Permit status: Completed | Permit id: P1503967 | |||||
SCORE 93 Date: April 15, 2015 Contractor: Stanley J Holcomb Client: Ann K Ford | Permit status: Completed | Permit id: P1505036 | |||||
SCORE 93 Date: February 2, 2015 Contractor: Stanley J Holcomb Client: Gregory H Tignor | Permit status: Completed | Permit id: P1503144 | |||||
SCORE 93 Date: March 19, 2015 Contractor: Stanley J Holcomb Client: Lorraine C Washington | Permit status: Completed | Permit id: P1504337 | |||||
SCORE 93 Date: July 15, 2015 Contractor: Stanley J Holcomb Client: Mallikarjuna R Polam | Permit status: Permit issued | Permit id: P1507514 | |||||
SCORE 93 Date: July 31, 2015 Contractor: Stanley J Holcomb Client: Donna Aggazio | Permit status: Completed | Permit id: P1507899 | |||||
SCORE 93 Date: July 31, 2015 Contractor: Stanley J Holcomb Client: Charles J Hudson | Permit status: Completed | Permit id: P1507900 | |||||
SCORE 93 Date: July 13, 2015 Contractor: Stanley J Holcomb Client: Leila J Smith | Permit status: Completed | Permit id: P1507456 | |||||
SCORE 93 Date: July 23, 2015 Contractor: Stanley J Holcomb Client: Honore Tiffey | Permit status: Completed | Permit id: P1507709 | |||||
SCORE 93 Date: July 23, 2015 Contractor: Stanley J Holcomb Client: Honore Tiffey | Permit status: Completed | Permit id: P1507710 | |||||
SCORE 93 Date: August 17, 2015 Contractor: Stanley J Holcomb Client: Malcolm Churchill | Permit status: Completed | Permit id: P1508302 | |||||
SCORE 93 Date: April 28, 2015 Contractor: Stanley J Holcomb Client: K P Krauskopf | Permit status: Permit issued | Permit id: P1505396 | |||||
SCORE 93 Date: April 28, 2015 Contractor: Stanley J Holcomb Client: Robert L Barry | Permit status: Permit issued | Permit id: P1505397 | |||||
SCORE 93 Date: January 14, 2015 Contractor: Stanley J Holcomb Client: Harvest Advertising Agency Inc | Permit status: Permit issued | Permit id: P1502664 | |||||
SCORE 93 Date: May 7, 2015 Contractor: Stanley J Holcomb Client: Kenneth R Stinson | Permit status: Completed | Permit id: P1505663 | |||||
SCORE 93 Date: February 11, 2015 Contractor: Stanley J Holcomb Client: Elizabeth A Peterson | Permit status: Permit issued | Permit id: P1503420 | |||||
SCORE 93 Date: February 5, 2015 Contractor: Stanley J Holcomb Client: Georgetown Baptist Church | Permit status: Permit issued | Permit id: P1503277 | |||||
SCORE 93 Date: June 18, 2015 Contractor: Stanley J Holcomb Client: Steuart Investment | Permit status: Permit issued | Permit id: P1506778 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: Margaret A Mcculloch | Permit status: Permit issued | Permit id: P1601047 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: Lucy K Gikovich | Permit status: Permit issued | Permit id: P1601048 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: John G Phipps | Permit status: Permit issued | Permit id: P1601049 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: Charles G Zentay | Permit status: Completed | Permit id: P1601050 | |||||
SCORE 93 Date: November 18, 2015 Contractor: Stanley J Holcomb Client: Philip R Tillotson | Permit status: Permit issued | Permit id: P1601439 | |||||
SCORE 93 Date: November 18, 2015 Contractor: Stanley J Holcomb Client: Thomas E Kelly Iii | Permit status: Permit issued | Permit id: P1601440 | |||||
SCORE 93 Date: November 18, 2015 Contractor: Stanley J Holcomb Client: Leonard S Chamberlain Jr | Permit status: Completed | Permit id: P1601442 | |||||
SCORE 93 Date: November 20, 2015 Contractor: Stanley J Holcomb Permit status: Permit issued | Permit id: P1601518 | |||||
SCORE 93 Date: September 30, 2015 Contractor: Stanley J Holcomb Client: Bradley L Smith | Permit status: Permit issued | Permit id: P1509457 | |||||
SCORE 93 Date: September 10, 2015 Contractor: Stanley J Holcomb Client: Horace G Dawson Jr | Permit status: Completed | Permit id: P1508962 | |||||
SCORE 93 Date: September 16, 2015 Contractor: Stanley J Holcomb Client: Robert E Moffitt | Permit status: Completed | Permit id: P1509092 | |||||
SCORE 93 Date: October 1, 2015 Contractor: Stanley J Holcomb Client: Joyce M Brown | Permit status: Permit issued | Permit id: P1600032 | |||||
SCORE 93 Date: February 18, 2016 Contractor: Stanley J Holcomb Client: Morven A Mclean | Permit status: Completed | Permit id: P1603774 | |||||
SCORE 93 Date: January 12, 2016 Contractor: Stanley J Holcomb Client: Michael Keshishian | Permit status: Permit issued | Permit id: P1602801 | |||||
SCORE 93 Date: May 17, 2012 Contractor: Stanley J Holcomb Client: Gloria J Campbell | Permit status: Completed | Permit id: P1205236 | |||||
SCORE 93 Date: October 11, 2012 Contractor: Stanley J Holcomb Client: Norma V Craig | Permit status: Permit issued | Permit id: P1300246 | |||||
SCORE 93 Date: August 2, 2012 Contractor: Stanley J Holcomb Client: Mary B Hernandez | Permit status: Completed | Permit id: P1207007 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: Alexander G Bardsley | Permit status: Permit issued | Permit id: P1300299 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Jane A Bishop | Permit status: Completed | Permit id: P1300702 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Bertha L Osekre | Permit status: Completed | Permit id: P1300413 | |||||
SCORE 93 Date: June 12, 2012 Contractor: Stanley J Holcomb Client: Marcus A Maloof | Permit status: Completed | Permit id: P1205793 | |||||
SCORE 93 Date: December 6, 2012 Contractor: Stanley J Holcomb Permit status: Completed | Permit id: P1301508 | |||||
SCORE 93 Date: July 9, 2012 Contractor: Stanley J Holcomb Client: Anne R Litchfield | Permit status: Permit issued | Permit id: P1206400 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Douglas J Montanabo | Permit status: Permit issued | Permit id: P1300704 | |||||
SCORE 93 Date: February 21, 2012 Contractor: Stanley J Holcomb Client: Marian Harris | Permit status: Completed | Permit id: P1203317 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Elizabeth C Mariantes | Permit status: Completed | Permit id: P1300414 | |||||
SCORE 93 Date: December 21, 2012 Contractor: Stanley J Holcomb Client: David L Wolf | Permit status: Completed | Permit id: P1301835 | |||||
SCORE 93 Date: August 20, 2012 Contractor: Stanley J Holcomb Client: Walter J Ross | Permit status: Completed | Permit id: P1207436 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Betty J Terrell | Permit status: Permit issued | Permit id: P1300412 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: L Huff | Permit status: Completed | Permit id: P1300300 | |||||
SCORE 93 Date: December 6, 2012 Contractor: Stanley J Holcomb Client: Brian Cooley | Permit status: Permit issued | Permit id: P1301507 | |||||
SCORE 93 Date: October 11, 2012 Contractor: Stanley J Holcomb Client: Charles H Clark | Permit status: Permit issued | Permit id: P1300247 | |||||
SCORE 93 Date: January 5, 2012 Contractor: Stanley J Holcomb Client: Padabla Ltd Revocable Trust | Permit status: Permit issued | Permit id: P1202227 | |||||
SCORE 93 Date: September 7, 2012 Contractor: Stanley J Holcomb Client: Lawrence P Buchanan Trustee | Permit status: Permit issued | Permit id: P1207854 | |||||
SCORE 93 Date: December 27, 2012 Contractor: Stanley J Holcomb Client: Bank Of America N.A | Permit status: Permit issued | Permit id: P1301895 | |||||
SCORE 93 Date: March 28, 2012 Contractor: Stanley J Holcomb Client: John L Wilhelm Jr | Permit status: Completed | Permit id: P1204110 | |||||
SCORE 93 Date: June 28, 2013 Contractor: Stanley J Holcomb Client: Joan F Kontos | Permit status: Permit issued | Permit id: P1306021 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Annette B Klayman | Permit status: Permit issued | Permit id: P1305034 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: John P Green | Permit status: Permit issued | Permit id: P1401714 | |||||
SCORE 93 Date: March 28, 2013 Contractor: Stanley J Holcomb Client: Susan B Lieberman | Permit status: Permit issued | Permit id: P1303842 | |||||
SCORE 93 Date: January 24, 2013 Contractor: Stanley J Holcomb Permit status: Permit issued | Permit id: P1302382 | |||||
SCORE 93 Date: June 27, 2013 Contractor: Stanley J Holcomb Client: Gerald J Hayling | Permit status: Permit issued | Permit id: P1305999 | |||||
SCORE 93 Date: October 2, 2013 Contractor: Stanley J Holcomb Client: F M Lyons | Permit status: Permit issued | Permit id: P1400057 | |||||
SCORE 93 Date: December 5, 2013 Contractor: Stanley J Holcomb Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1401684 | |||||
SCORE 93 Date: August 28, 2013 Contractor: Stanley J Holcomb Client: Harry James Hargrove Trustee | Permit status: Permit issued | Permit id: P1307497 | |||||
SCORE 93 Date: May 22, 2013 Contractor: Stanley J Holcomb Client: Wm W Baum Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1305161 | |||||
SCORE 93 Date: March 5, 2013 Contractor: Stanley J Holcomb Client: Margaret S Judge | Permit status: Permit issued | Permit id: P1303274 | |||||
SCORE 93 Date: February 6, 2013 Contractor: Stanley J Holcomb Client: James C Washington Jr | Permit status: Permit issued | Permit id: P1302671 | |||||
SCORE 93 Date: March 14, 2013 Contractor: Stanley J Holcomb Client: Harden Allen | Permit status: Permit issued | Permit id: P1303503 | |||||
SCORE 93 Date: November 7, 2013 Contractor: Stanley J Holcomb Client: D Jackson | Permit status: Permit issued | Permit id: P1401015 | |||||
SCORE 93 Date: October 10, 2013 Contractor: Stanley J Holcomb Client: Mary E Young | Permit status: Permit issued | Permit id: P1400272 | |||||
SCORE 93 Date: March 5, 2013 Contractor: Stanley J Holcomb Client: Susan Rubin | Permit status: Completed | Permit id: P1303273 | |||||
SCORE 93 Date: January 8, 2013 Contractor: Stanley J Holcomb Client: Sheila M Kelly Trustee | Permit status: Completed | Permit id: P1302052 | |||||
SCORE 93 Date: July 18, 2013 Contractor: Stanley J Holcomb Client: Brandon L Hunt | Permit status: Completed | Permit id: P1306488 | |||||
SCORE 93 Date: May 22, 2013 Contractor: Stanley J Holcomb Client: Robert B Davis | Permit status: Completed | Permit id: P1305160 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: Stephen E Miles | Permit status: Completed | Permit id: P1401712 | |||||
SCORE 93 Date: February 7, 2013 Contractor: Stanley J Holcomb Client: James Frederick Burris Trustee | Permit status: Completed | Permit id: P1302706 | |||||
SCORE 93 Date: December 23, 2013 Contractor: Stanley J Holcomb Client: Kathryn A Mcguire Trustee | Permit status: Completed | Permit id: P1402106 | |||||
SCORE 93 Date: March 15, 2013 Contractor: Stanley J Holcomb Client: Edward Abramson | Permit status: Completed | Permit id: P1303527 | |||||
SCORE 93 Date: October 2, 2013 Contractor: Stanley J Holcomb Client: Michael D Hamilton | Permit status: Completed | Permit id: P1400058 | |||||
SCORE 93 Date: August 9, 2013 Contractor: Stanley J Holcomb Client: Margaret A Escalante Trustee | Permit status: Completed | Permit id: P1307071 | |||||
SCORE 93 Date: December 5, 2013 Contractor: Stanley J Holcomb Client: Andre Peltekian | Permit status: Completed | Permit id: P1401683 | |||||
SCORE 93 Date: January 23, 2013 Contractor: Stanley J Holcomb Client: Church Of Two Worlds | Permit status: Completed | Permit id: P1302355 | |||||
SCORE 93 Date: August 29, 2013 Contractor: Stanley J Holcomb Client: Louisa Jones | Permit status: Completed | Permit id: P1307513 | |||||
SCORE 93 Date: November 20, 2013 Contractor: Stanley J Holcomb Client: S L Shepperson | Permit status: Completed | Permit id: P1401334 | |||||
SCORE 93 Date: September 12, 2013 Contractor: Stanley J Holcomb Client: David L Burns | Permit status: Completed | Permit id: P1307851 | |||||
SCORE 93 Date: December 30, 2013 Contractor: Stanley J Holcomb Client: Nantz Rickard | Permit status: Completed | Permit id: P1402205 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Athanasios Vamvakidis | Permit status: Completed | Permit id: P1305032 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Eirini Gouleta | Permit status: Completed | Permit id: P1305033 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Church Of Christ Inc | Permit status: Permit issued | Permit id: P1500994 | |||||
SCORE 93 Date: December 30, 2014 Contractor: Stanley J Holcomb Client: Daniel J Harper | Permit status: Permit issued | Permit id: P1502354 | |||||
SCORE 93 Date: September 23, 2014 Contractor: Stanley J Holcomb Client: R A Frankel | Permit status: Permit issued | Permit id: P1408805 | |||||
SCORE 93 Date: August 4, 2014 Contractor: Stanley J Holcomb Client: M F Gaskins | Permit status: Permit issued | Permit id: P1407542 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Susan O Gilbert | Permit status: Permit issued | Permit id: P1406595 | |||||
SCORE 93 Date: May 14, 2014 Contractor: Stanley J Holcomb Client: Nancy S Pigman Trustee | Permit status: Permit issued | Permit id: P1405512 | |||||
SCORE 93 Date: May 30, 2014 Contractor: Stanley J Holcomb Client: Reneau Real Estate Llc | Permit status: Permit issued | Permit id: P1405904 | |||||
SCORE 93 Date: October 1, 2014 Contractor: Stanley J Holcomb Client: Ellen Taylor (life Estate) | Permit status: Permit issued | Permit id: P1500046 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Jaired D Stallard | Permit status: Permit issued | Permit id: P1407352 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Ebenezer Methodist Church | Permit status: Permit issued | Permit id: P1500995 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Mallikarjuna R Polam | Permit status: Permit issued | Permit id: P1407355 | |||||
SCORE 93 Date: January 17, 2014 Contractor: Stanley J Holcomb Client: Edwin A Bonilla | Permit status: Permit issued | Permit id: P1402614 | |||||
SCORE 93 Date: November 20, 2014 Contractor: Stanley J Holcomb Client: Daisy T James | Permit status: Permit issued | Permit id: P1501377 | |||||
SCORE 93 Date: March 6, 2014 Contractor: Stanley J Holcomb Client: Peter R Kolker | Permit status: Permit issued | Permit id: P1403746 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Wanda D Busby | Permit status: Permit issued | Permit id: P1500353 | |||||
SCORE 93 Date: June 12, 2014 Contractor: Stanley J Holcomb Client: Elizabeth A Henneke | Permit status: Permit issued | Permit id: P1406196 | |||||
SCORE 93 Date: August 18, 2014 Contractor: Stanley J Holcomb Client: Nathanielp Moore | Permit status: Permit issued | Permit id: P1407888 | |||||
SCORE 93 Date: December 18, 2014 Contractor: Stanley J Holcomb Client: Carolyn F Lockie | Permit status: Completed | Permit id: P1502161 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: James P White | Permit status: Completed | Permit id: P1501103 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Stephen R Davenport Iv | Permit status: Completed | Permit id: P1406594 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Elizabeth Woldemichael | Permit status: Completed | Permit id: P1501099 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Katherine P Cartwright | Permit status: Completed | Permit id: P1501100 | |||||
SCORE 93 Date: October 1, 2014 Contractor: Stanley J Holcomb Client: Todd Edelman | Permit status: Completed | Permit id: P1500045 | |||||
SCORE 93 Date: November 13, 2014 Contractor: Stanley J Holcomb Client: Kenneth R Stinson | Permit status: Completed | Permit id: P1501186 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Joan Rosenthal Trustee | Permit status: Completed | Permit id: P1500996 | |||||
SCORE 93 Date: April 23, 2014 Contractor: Stanley J Holcomb Client: William T Bennett | Permit status: Completed | Permit id: P1405007 | |||||
SCORE 93 Date: July 17, 2014 Contractor: Stanley J Holcomb Client: Johnny A Byrd | Permit status: Completed | Permit id: P1407063 | |||||
SCORE 93 Date: November 19, 2014 Contractor: Stanley J Holcomb Client: Doris F Faulkner | Permit status: Completed | Permit id: P1501347 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Doris M Bowser | Permit status: Completed | Permit id: P1500352 | |||||
SCORE 93 Date: September 4, 2014 Contractor: Stanley J Holcomb Client: Tufty Harold G And Barbara V | Permit status: Completed | Permit id: P1408346 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Alexandra Stark | Permit status: Completed | Permit id: P1501831 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Rochelle F Washington | Permit status: Completed | Permit id: P1501851 | |||||
SCORE 93 Date: April 7, 2014 Contractor: Stanley J Holcomb Client: J Haber | Permit status: Completed | Permit id: P1404596 | |||||
SCORE 93 Date: May 2, 2014 Contractor: Stanley J Holcomb Client: Ernest H Flood | Permit status: Completed | Permit id: P1405239 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Interdenominational Church Ushers Association Of Dc | Permit status: Completed | Permit id: P1407354 | |||||
SCORE 93 Date: March 28, 2012 Contractor: Stanley J Holcomb Client: Joan S Keenan Trustee | Permit status: Completed | Permit id: P1204109 | |||||
SCORE 93 Date: December 27, 2012 Contractor: Stanley J Holcomb Client: James Frederick Burris Trustee | Permit status: Completed | Permit id: P1301896 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Kerri L Rivers | Permit status: Completed | Permit id: P1300705 | |||||
SCORE 93 Date: November 5, 2012 Contractor: Stanley J Holcomb Client: David Ottogalli | Permit status: Permit issued | Permit id: P1300803 | |||||
SCORE 93 Date: December 18, 2012 Contractor: Stanley J Holcomb Client: Gerald E Jamison | Permit status: Permit issued | Permit id: P1301761 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Bennett L Hecht | Permit status: Permit issued | Permit id: P1300706 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: Paul S Armington | Permit status: Permit issued | Permit id: P1300302 | |||||
SCORE 93 Date: June 25, 2012 Contractor: Stanley J Holcomb Client: Fred Ryder Jr | Permit status: Completed | Permit id: P1206106 | |||||
SCORE 93 Date: November 5, 2012 Contractor: Stanley J Holcomb Client: Rosa Trapp-Dail | Permit status: Permit issued | Permit id: P1300802 | |||||
SCORE 93 Date: January 12, 2016 Contractor: Stanley J Holcomb Client: Michael Keshishian | Permit status: Permit issued | Permit id: P1602801 | |||||
SCORE 93 Date: February 18, 2016 Contractor: Stanley J Holcomb Client: Morven A Mclean | Permit status: Completed | Permit id: P1603774 | |||||
SCORE 93 Date: December 30, 2014 Contractor: Stanley J Holcomb Client: Daniel J Harper | Permit status: Permit issued | Permit id: P1502354 | |||||
SCORE 93 Date: July 17, 2014 Contractor: Stanley J Holcomb Client: Johnny A Byrd | Permit status: Completed | Permit id: P1407063 | |||||
SCORE 93 Date: August 4, 2014 Contractor: Stanley J Holcomb Client: M F Gaskins | Permit status: Permit issued | Permit id: P1407542 | |||||
SCORE 93 Date: September 23, 2014 Contractor: Stanley J Holcomb Client: R A Frankel | Permit status: Permit issued | Permit id: P1408805 | |||||
SCORE 93 Date: April 23, 2014 Contractor: Stanley J Holcomb Client: William T Bennett | Permit status: Completed | Permit id: P1405007 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Susan O Gilbert | Permit status: Permit issued | Permit id: P1406595 | |||||
SCORE 93 Date: May 14, 2014 Contractor: Stanley J Holcomb Client: Nancy S Pigman Trustee | Permit status: Permit issued | Permit id: P1405512 | |||||
SCORE 93 Date: November 19, 2014 Contractor: Stanley J Holcomb Client: Doris F Faulkner | Permit status: Completed | Permit id: P1501347 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Church Of Christ Inc | Permit status: Permit issued | Permit id: P1500994 | |||||
SCORE 93 Date: November 13, 2014 Contractor: Stanley J Holcomb Client: Kenneth R Stinson | Permit status: Completed | Permit id: P1501186 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Elizabeth Woldemichael | Permit status: Completed | Permit id: P1501099 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: James P White | Permit status: Completed | Permit id: P1501103 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Katherine P Cartwright | Permit status: Completed | Permit id: P1501100 | |||||
SCORE 93 Date: October 1, 2014 Contractor: Stanley J Holcomb Client: Todd Edelman | Permit status: Completed | Permit id: P1500045 | |||||
SCORE 93 Date: December 18, 2014 Contractor: Stanley J Holcomb Client: Carolyn F Lockie | Permit status: Completed | Permit id: P1502161 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Stephen R Davenport Iv | Permit status: Completed | Permit id: P1406594 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Joan Rosenthal Trustee | Permit status: Completed | Permit id: P1500996 | |||||
SCORE 93 Date: October 30, 2014 Contractor: Stanley J Holcomb Client: Ellen Taylor (life Estate) | Permit status: Completed | Permit id: P1500850 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Doris M Bowser | Permit status: Completed | Permit id: P1500352 | |||||
SCORE 93 Date: May 30, 2014 Contractor: Stanley J Holcomb Client: Reneau Real Estate Llc | Permit status: Permit issued | Permit id: P1405904 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Jaired D Stallard | Permit status: Permit issued | Permit id: P1407352 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Mallikarjuna R Polam | Permit status: Permit issued | Permit id: P1407355 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Ebenezer Methodist Church | Permit status: Permit issued | Permit id: P1500995 | |||||
SCORE 93 Date: January 17, 2014 Contractor: Stanley J Holcomb Client: Edwin A Bonilla | Permit status: Permit issued | Permit id: P1402614 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Alexandra Stark | Permit status: Completed | Permit id: P1501831 | |||||
SCORE 93 Date: May 2, 2014 Contractor: Stanley J Holcomb Client: Ernest H Flood | Permit status: Completed | Permit id: P1405239 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Rochelle F Washington | Permit status: Completed | Permit id: P1501851 | |||||
SCORE 93 Date: November 20, 2014 Contractor: Stanley J Holcomb Client: Daisy T James | Permit status: Permit issued | Permit id: P1501377 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Wanda D Busby | Permit status: Permit issued | Permit id: P1500353 | |||||
SCORE 93 Date: September 4, 2014 Contractor: Stanley J Holcomb Client: Tufty Harold G And Barbara V | Permit status: Completed | Permit id: P1408346 | |||||
SCORE 93 Date: March 6, 2014 Contractor: Stanley J Holcomb Client: Peter R Kolker | Permit status: Permit issued | Permit id: P1403746 | |||||
SCORE 93 Date: April 7, 2014 Contractor: Stanley J Holcomb Client: J Haber | Permit status: Completed | Permit id: P1404596 | |||||
SCORE 93 Date: June 12, 2014 Contractor: Stanley J Holcomb Client: Elizabeth A Henneke | Permit status: Permit issued | Permit id: P1406196 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Interdenominational Church Ushers Association Of Dc | Permit status: Completed | Permit id: P1407354 | |||||
SCORE 93 Date: August 18, 2014 Contractor: Stanley J Holcomb Client: Nathanielp Moore | Permit status: Permit issued | Permit id: P1407888 | |||||
SCORE 93 Date: March 8, 2013 Contractor: Stanley J Holcomb Client: Durant P Tardugno | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P1303339 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Ebenezer Methodist Church | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P1501078 | |||||
SCORE 93 Date: July 9, 2012 Contractor: Stanley J Holcomb Client: Anne R Litchfield | Permit status: Permit issued | Permit id: P1206400 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Douglas J Montanabo | Permit status: Permit issued | Permit id: P1300704 | |||||
SCORE 93 Date: November 5, 2012 Contractor: Stanley J Holcomb Client: Rosa Trapp-Dail | Permit status: Permit issued | Permit id: P1300802 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Bennett L Hecht | Permit status: Permit issued | Permit id: P1300706 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: Paul S Armington | Permit status: Permit issued | Permit id: P1300302 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Betty J Terrell | Permit status: Permit issued | Permit id: P1300412 | |||||
SCORE 93 Date: January 5, 2012 Contractor: Stanley J Holcomb Client: Padabla Ltd Revocable Trust | Permit status: Permit issued | Permit id: P1202227 | |||||
SCORE 93 Date: December 6, 2012 Contractor: Stanley J Holcomb Client: Brian Cooley | Permit status: Permit issued | Permit id: P1301507 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: Alexander G Bardsley | Permit status: Permit issued | Permit id: P1300299 | |||||
SCORE 93 Date: October 11, 2012 Contractor: Stanley J Holcomb Client: Charles H Clark | Permit status: Permit issued | Permit id: P1300247 | |||||
SCORE 93 Date: December 27, 2012 Contractor: Stanley J Holcomb Client: Bank Of America N.A | Permit status: Permit issued | Permit id: P1301895 | |||||
SCORE 93 Date: December 18, 2012 Contractor: Stanley J Holcomb Client: Gerald E Jamison | Permit status: Permit issued | Permit id: P1301761 | |||||
SCORE 93 Date: November 5, 2012 Contractor: Stanley J Holcomb Client: David Ottogalli | Permit status: Permit issued | Permit id: P1300803 | |||||
SCORE 93 Date: September 7, 2012 Contractor: Stanley J Holcomb Client: Lawrence P Buchanan Trustee | Permit status: Permit issued | Permit id: P1207854 | |||||
SCORE 93 Date: October 5, 2012 Contractor: Stanley J Holcomb Client: Allen F Wiggs | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P1300145 | |||||
SCORE 93 Date: May 17, 2012 Contractor: Stanley J Holcomb Client: Gloria J Campbell | Permit status: Completed | Permit id: P1205236 | |||||
SCORE 93 Date: March 28, 2012 Contractor: Stanley J Holcomb Client: Joan S Keenan Trustee | Permit status: Completed | Permit id: P1204109 | |||||
SCORE 93 Date: December 6, 2012 Contractor: Stanley J Holcomb Permit status: Completed | Permit id: P1301508 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Kerri L Rivers | Permit status: Completed | Permit id: P1300705 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Elizabeth C Mariantes | Permit status: Completed | Permit id: P1300414 | |||||
SCORE 93 Date: December 21, 2012 Contractor: Stanley J Holcomb Client: David L Wolf | Permit status: Completed | Permit id: P1301835 | |||||
SCORE 93 Date: February 21, 2012 Contractor: Stanley J Holcomb Client: Marian Harris | Permit status: Completed | Permit id: P1203317 | |||||
SCORE 93 Date: August 20, 2012 Contractor: Stanley J Holcomb Client: Walter J Ross | Permit status: Completed | Permit id: P1207436 | |||||
SCORE 93 Date: October 18, 2012 Contractor: Stanley J Holcomb Client: Bertha L Osekre | Permit status: Completed | Permit id: P1300413 | |||||
SCORE 93 Date: August 2, 2012 Contractor: Stanley J Holcomb Client: Mary B Hernandez | Permit status: Completed | Permit id: P1207007 | |||||
SCORE 93 Date: November 1, 2012 Contractor: Stanley J Holcomb Client: Jane A Bishop | Permit status: Completed | Permit id: P1300702 | |||||
SCORE 93 Date: June 25, 2012 Contractor: Stanley J Holcomb Client: Fred Ryder Jr | Permit status: Completed | Permit id: P1206106 | |||||
SCORE 93 Date: March 28, 2012 Contractor: Stanley J Holcomb Client: John L Wilhelm Jr | Permit status: Completed | Permit id: P1204110 | |||||
SCORE 93 Date: December 27, 2012 Contractor: Stanley J Holcomb Client: James Frederick Burris Trustee | Permit status: Completed | Permit id: P1301896 | |||||
SCORE 93 Date: June 12, 2012 Contractor: Stanley J Holcomb Client: Marcus A Maloof | Permit status: Completed | Permit id: P1205793 | |||||
SCORE 93 Date: October 15, 2012 Contractor: Stanley J Holcomb Client: L Huff | Permit status: Completed | Permit id: P1300300 | |||||
SCORE 93 Date: August 29, 2013 Contractor: Stanley J Holcomb Client: Harry James Hargrove Trustee | Permit status: Permit issued | Permit id: P1307516 | |||||
SCORE 93 Date: August 28, 2013 Contractor: Stanley J Holcomb Client: Harry James Hargrove Trustee | Permit status: Permit issued | Permit id: P1307497 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1401716 | |||||
SCORE 93 Date: December 5, 2013 Contractor: Stanley J Holcomb Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1401684 | |||||
SCORE 93 Date: June 27, 2013 Contractor: Stanley J Holcomb Client: Gerald J Hayling | Permit status: Permit issued | Permit id: P1305999 | |||||
SCORE 93 Date: October 2, 2013 Contractor: Stanley J Holcomb Client: F M Lyons | Permit status: Permit issued | Permit id: P1400057 | |||||
SCORE 93 Date: November 7, 2013 Contractor: Stanley J Holcomb Client: D Jackson | Permit status: Permit issued | Permit id: P1401015 | |||||
SCORE 93 Date: February 6, 2013 Contractor: Stanley J Holcomb Client: James C Washington Jr | Permit status: Permit issued | Permit id: P1302671 | |||||
SCORE 93 Date: March 14, 2013 Contractor: Stanley J Holcomb Client: Harden Allen | Permit status: Permit issued | Permit id: P1303503 | |||||
SCORE 93 Date: October 10, 2013 Contractor: Stanley J Holcomb Client: Mary E Young | Permit status: Permit issued | Permit id: P1400272 | |||||
SCORE 93 Date: May 22, 2013 Contractor: Stanley J Holcomb Client: Wm W Baum Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1305161 | |||||
SCORE 93 Date: January 24, 2013 Contractor: Stanley J Holcomb Client: Humble Oil & Refine Company | Permit status: Permit issued | Permit id: P1302382 | |||||
SCORE 93 Date: March 28, 2013 Contractor: Stanley J Holcomb Client: Susan B Lieberman | Permit status: Permit issued | Permit id: P1303842 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: John P Green | Permit status: Permit issued | Permit id: P1401714 | |||||
SCORE 93 Date: May 16, 2013 Contractor: Stanley J Holcomb Client: Annette B Klayman | Permit status: Permit issued | Permit id: P1305034 | |||||
SCORE 93 Date: June 28, 2013 Contractor: Stanley J Holcomb Client: Joan F Kontos | Permit status: Permit issued | Permit id: P1306021 | |||||
SCORE 93 Date: July 18, 2013 Contractor: Stanley J Holcomb Client: Brandon L Hunt | Permit status: Completed | Permit id: P1306488 | |||||
SCORE 93 Date: January 8, 2013 Contractor: Stanley J Holcomb Client: Sheila M Kelly Trustee | Permit status: Completed | Permit id: P1302052 | |||||
SCORE 93 Date: March 5, 2013 Contractor: Stanley J Holcomb Client: Susan Rubin | Permit status: Completed | Permit id: P1303273 | |||||
SCORE 93 Date: May 22, 2013 Contractor: Stanley J Holcomb Client: Robert B Davis | Permit status: Completed | Permit id: P1305160 | |||||
SCORE 93 Date: December 6, 2013 Contractor: Stanley J Holcomb Client: Stephen E Miles | Permit status: Completed | Permit id: P1401712 | |||||
SCORE 93 Date: August 9, 2013 Contractor: Stanley J Holcomb Client: Margaret A Escalante Trustee | Permit status: Completed | Permit id: P1307071 | |||||
SCORE 93 Date: August 29, 2013 Contractor: Stanley J Holcomb Client: Louisa Jones | Permit status: Completed | Permit id: P1307513 | |||||
SCORE 93 Date: November 20, 2013 Contractor: Stanley J Holcomb Client: S L Shepperson | Permit status: Completed | Permit id: P1401334 | |||||
SCORE 93 Date: December 23, 2013 Contractor: Stanley J Holcomb Client: Kathryn A Mcguire Trustee | Permit status: Completed | Permit id: P1402106 | |||||
SCORE 93 Date: September 12, 2013 Contractor: Stanley J Holcomb Client: David L Burns | Permit status: Completed | Permit id: P1307851 | |||||
SCORE 93 Date: December 30, 2013 Contractor: Stanley J Holcomb Client: Nantz Rickard | Permit status: Completed | Permit id: P1402205 | |||||
SCORE 93 Date: February 7, 2013 Contractor: Stanley J Holcomb Client: James Frederick Burris Trustee | Permit status: Completed | Permit id: P1302706 | |||||
SCORE 93 Date: October 2, 2013 Contractor: Stanley J Holcomb Client: Michael D Hamilton | Permit status: Completed | Permit id: P1400058 | |||||
SCORE 93 Date: March 15, 2013 Contractor: Stanley J Holcomb Client: Edward Abramson | Permit status: Completed | Permit id: P1303527 | |||||
SCORE 93 Date: January 23, 2013 Contractor: Stanley J Holcomb Client: Church Of Two Worlds | Permit status: Completed | Permit id: P1302355 | |||||
SCORE 93 Date: December 5, 2013 Contractor: Stanley J Holcomb Client: Andre Peltekian | Permit status: Completed | Permit id: P1401683 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Church Of Christ Inc | Permit status: Permit issued | Permit id: P1500994 | |||||
SCORE 93 Date: August 18, 2014 Contractor: Stanley J Holcomb Client: Nathanielp Moore | Permit status: Permit issued | Permit id: P1407888 | |||||
SCORE 93 Date: October 14, 2014 Contractor: Stanley J Holcomb Client: Wanda D Busby | Permit status: Permit issued | Permit id: P1500353 | |||||
SCORE 93 Date: November 20, 2014 Contractor: Stanley J Holcomb Client: Daisy T James | Permit status: Permit issued | Permit id: P1501377 | |||||
SCORE 93 Date: March 6, 2014 Contractor: Stanley J Holcomb Client: Peter R Kolker | Permit status: Permit issued | Permit id: P1403746 | |||||
SCORE 93 Date: January 17, 2014 Contractor: Stanley J Holcomb Client: Edwin A Bonilla | Permit status: Permit issued | Permit id: P1402614 | |||||
SCORE 93 Date: June 12, 2014 Contractor: Stanley J Holcomb Client: Elizabeth A Henneke | Permit status: Permit issued | Permit id: P1406196 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Mallikarjuna R Polam | Permit status: Permit issued | Permit id: P1407355 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Ebenezer Methodist Church | Permit status: Permit issued | Permit id: P1500995 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Jaired D Stallard | Permit status: Permit issued | Permit id: P1407352 | |||||
SCORE 93 Date: May 30, 2014 Contractor: Stanley J Holcomb Client: Reneau Real Estate Llc | Permit status: Permit issued | Permit id: P1405904 | |||||
SCORE 93 Date: October 1, 2014 Contractor: Stanley J Holcomb Client: Ellen Taylor (life Estate) | Permit status: Permit issued | Permit id: P1500046 | |||||
SCORE 93 Date: August 4, 2014 Contractor: Stanley J Holcomb Client: M F Gaskins | Permit status: Permit issued | Permit id: P1407542 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Susan O Gilbert | Permit status: Permit issued | Permit id: P1406595 | |||||
SCORE 93 Date: May 14, 2014 Contractor: Stanley J Holcomb Client: Nancy S Pigman Trustee | Permit status: Permit issued | Permit id: P1405512 | |||||
SCORE 93 Date: November 19, 2014 Contractor: Stanley J Holcomb Client: S A Segal | Permit status: Permit issued | Permit id: P1501348 | |||||
SCORE 93 Date: December 30, 2014 Contractor: Stanley J Holcomb Client: Daniel J Harper | Permit status: Permit issued | Permit id: P1502354 | |||||
SCORE 93 Date: July 17, 2014 Contractor: Stanley J Holcomb Client: Johnny A Byrd | Permit status: Completed | Permit id: P1407063 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: James P White | Permit status: Completed | Permit id: P1501103 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Elizabeth Woldemichael | Permit status: Completed | Permit id: P1501099 | |||||
SCORE 93 Date: April 23, 2014 Contractor: Stanley J Holcomb Client: William T Bennett | Permit status: Completed | Permit id: P1405007 | |||||
SCORE 93 Date: November 19, 2014 Contractor: Stanley J Holcomb Client: Doris F Faulkner | Permit status: Completed | Permit id: P1501347 | |||||
SCORE 93 Date: November 13, 2014 Contractor: Stanley J Holcomb Client: Kenneth R Stinson | Permit status: Completed | Permit id: P1501186 | |||||
SCORE 93 Date: November 5, 2014 Contractor: Stanley J Holcomb Client: Joan Rosenthal Trustee | Permit status: Completed | Permit id: P1500996 | |||||
SCORE 93 Date: November 10, 2014 Contractor: Stanley J Holcomb Client: Katherine P Cartwright | Permit status: Completed | Permit id: P1501100 | |||||
SCORE 93 Date: October 1, 2014 Contractor: Stanley J Holcomb Client: Todd Edelman | Permit status: Completed | Permit id: P1500045 | |||||
SCORE 93 Date: December 18, 2014 Contractor: Stanley J Holcomb Client: Carolyn F Lockie | Permit status: Completed | Permit id: P1502161 | |||||
SCORE 93 Date: June 27, 2014 Contractor: Stanley J Holcomb Client: Stephen R Davenport Iv | Permit status: Completed | Permit id: P1406594 | |||||
SCORE 93 Date: April 7, 2014 Contractor: Stanley J Holcomb Client: J Haber | Permit status: Completed | Permit id: P1404596 | |||||
SCORE 93 Date: May 2, 2014 Contractor: Stanley J Holcomb Client: Ernest H Flood | Permit status: Completed | Permit id: P1405239 | |||||
SCORE 93 Date: September 4, 2014 Contractor: Stanley J Holcomb Client: Tufty Harold G And Barbara V | Permit status: Completed | Permit id: P1408346 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Rochelle F Washington | Permit status: Completed | Permit id: P1501851 | |||||
SCORE 93 Date: December 10, 2014 Contractor: Stanley J Holcomb Client: Alexandra Stark | Permit status: Completed | Permit id: P1501831 | |||||
SCORE 93 Date: July 29, 2014 Contractor: Stanley J Holcomb Client: Interdenominational Church Ushers Association Of Dc | Permit status: Completed | Permit id: P1407354 | |||||
SCORE 93 Date: September 30, 2015 Contractor: Stanley J Holcomb Client: Bradley L Smith | Permit status: Permit issued | Permit id: P1509457 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: John G Phipps | Permit status: Permit issued | Permit id: P1601049 | |||||
SCORE 93 Date: April 28, 2015 Contractor: Stanley J Holcomb Client: Robert L Barry | Permit status: Permit issued | Permit id: P1505397 | |||||
SCORE 93 Date: October 1, 2015 Contractor: Stanley J Holcomb Client: Joyce M Brown | Permit status: Permit issued | Permit id: P1600032 | |||||
SCORE 93 Date: July 15, 2015 Contractor: Stanley J Holcomb Client: Mallikarjuna R Polam | Permit status: Permit issued | Permit id: P1507514 | |||||
SCORE 93 Date: February 6, 2015 Contractor: Stanley J Holcomb Client: Carolyn F Bemis | Permit status: Permit issued | Permit id: P1503284 | |||||
SCORE 93 Date: April 28, 2015 Contractor: Stanley J Holcomb Client: K P Krauskopf | Permit status: Permit issued | Permit id: P1505396 | |||||
SCORE 93 Date: November 20, 2015 Contractor: Stanley J Holcomb Client: Stanley & Ellen D Nesheim Trustees | Permit status: Permit issued | Permit id: P1601518 | |||||
SCORE 93 Date: November 18, 2015 Contractor: Stanley J Holcomb Client: Thomas E Kelly Iii | Permit status: Permit issued | Permit id: P1601440 | |||||
SCORE 93 Date: January 14, 2015 Contractor: Stanley J Holcomb Client: Harvest Advertising Agency Inc | Permit status: Permit issued | Permit id: P1502664 | |||||
SCORE 93 Date: February 11, 2015 Contractor: Stanley J Holcomb Client: Elizabeth A Peterson | Permit status: Permit issued | Permit id: P1503420 | |||||
SCORE 93 Date: February 5, 2015 Contractor: Stanley J Holcomb Client: Georgetown Baptist Church | Permit status: Permit issued | Permit id: P1503277 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: Lucy K Gikovich | Permit status: Permit issued | Permit id: P1601048 | |||||
SCORE 93 Date: June 18, 2015 Contractor: Stanley J Holcomb Client: Steuart Investment | Permit status: Permit issued | Permit id: P1506778 | |||||
SCORE 93 Date: January 7, 2015 Contractor: Stanley J Holcomb Client: Rachel M Lawrence | Permit status: Completed | Permit id: P1502471 | |||||
SCORE 93 Date: July 31, 2015 Contractor: Stanley J Holcomb Client: Charles J Hudson | Permit status: Completed | Permit id: P1507900 | |||||
SCORE 93 Date: November 18, 2015 Contractor: Stanley J Holcomb Client: Philip R Tillotson | Permit status: Permit issued | Permit id: P1601439 | |||||
SCORE 93 Date: July 23, 2015 Contractor: Stanley J Holcomb Client: Honore Tiffey | Permit status: Completed | Permit id: P1507709 | |||||
SCORE 93 Date: April 15, 2015 Contractor: Stanley J Holcomb Client: Ann K Ford | Permit status: Completed | Permit id: P1505036 | |||||
SCORE 93 Date: March 19, 2015 Contractor: Stanley J Holcomb Client: Lorraine C Washington | Permit status: Completed | Permit id: P1504337 | |||||
SCORE 93 Date: May 7, 2015 Contractor: Stanley J Holcomb Client: Kenneth R Stinson | Permit status: Completed | Permit id: P1505663 | |||||
SCORE 93 Date: March 4, 2015 Contractor: Stanley J Holcomb Client: D Gainsburg | Permit status: Completed | Permit id: P1503967 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: Margaret A Mcculloch | Permit status: Completed | Permit id: P1601047 | |||||
SCORE 93 Date: July 31, 2015 Contractor: Stanley J Holcomb Client: Donna Aggazio | Permit status: Completed | Permit id: P1507899 | |||||
SCORE 93 Date: September 10, 2015 Contractor: Stanley J Holcomb Client: Horace G Dawson Jr | Permit status: Completed | Permit id: P1508962 | |||||
SCORE 93 Date: February 4, 2015 Contractor: Stanley J Holcomb Client: Carolyn F Bemis | Permit status: Completed | Permit id: P1503237 | |||||
SCORE 93 Date: August 17, 2015 Contractor: Stanley J Holcomb Client: Malcolm Churchill | Permit status: Completed | Permit id: P1508302 | |||||
SCORE 93 Date: July 23, 2015 Contractor: Stanley J Holcomb Client: Honore Tiffey | Permit status: Completed | Permit id: P1507710 | |||||
SCORE 93 Date: February 2, 2015 Contractor: Stanley J Holcomb Client: Gregory H Tignor | Permit status: Completed | Permit id: P1503144 | |||||
SCORE 93 Date: September 16, 2015 Contractor: Stanley J Holcomb Client: Robert E Moffitt | Permit status: Completed | Permit id: P1509092 | |||||
SCORE 93 Date: November 4, 2015 Contractor: Stanley J Holcomb Client: Charles G Zentay | Permit status: Completed | Permit id: P1601050 | |||||
SCORE 93 Date: November 18, 2015 Contractor: Stanley J Holcomb Client: Leonard S Chamberlain Jr | Permit status: Completed | Permit id: P1601442 | |||||
SCORE 93 Date: July 13, 2015 Contractor: Stanley J Holcomb Client: Leila J Smith | Permit status: Completed | Permit id: P1507456 | |||||
SCORE 93 Date: January 12, 2016 Contractor: Stanley J Holcomb Client: Michael Keshishian | Permit status: Permit issued | Permit id: P1602801 | |||||
SCORE 93 Date: February 18, 2016 Contractor: Stanley J Holcomb Client: Morven A Mclean | Permit status: Completed | Permit id: P1603774 |