SCORE

SOLTERRA GLOBAL LLC

ABOUT SOLTERRA GLOBAL LLC

Solterra Global Llc specializes in:

Solterra Global Llc offers services:

Based on the information received from , associated with Solterra Global Llc over the past .

If you are considering hiring Solterra Global Llc for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Solterra Global Llc has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
79
5726 27th Ave Ne Seattle Wa
10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 8kw solar pv system on roof of home. (36) itek modules, (1) solaredge inverter
Date:  October 16, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2017 | Expiration date: October 16, 2018 | Current use: Single family / duplex | Permit id: 6624616
2017/10/160795726 27th Ave Ne Seattle WaSolterra Global Llc
SCORE
79
1519 S Ferdinand St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 4kw solar pv system on roof of home, as well as service upgrade from 125a to 200a
Date:  May 11, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2017 | Expiration date: May 11, 2018 | Current use: Single family / duplex | Permit id: 6596663
2017/05/110791519 S Ferdinand St Seattle WaSolterra Global Llc
SCORE
79
3645 36th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 3kw solar pv energy system on roof of home, full service upgrade 125a to 200a
Date:  June 20, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: July 19, 2017 | Expiration date: June 20, 2018 | Current use: Single family / duplex | Permit id: 6603619
2017/06/200793645 36th Ave S Seattle WaSolterra Global Llc
SCORE
79
41 48th Ave S Seattle Wa
5-19-17 bz pv one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 2kw solar pv system on roof of home
Date:  May 12, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: July 18, 2017 | Expiration date: May 12, 2018 | Current use: Single family / duplex | Permit id: 6596859
2017/05/1207941 48th Ave S Seattle WaSolterra Global Llc
SCORE
79
1533 Ne 76th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 pv system on roof
Date:  December 11, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 11, 2018 | Current use: Single family / duplex | Permit id: 6634545
2017/12/110791533 Ne 76th St Seattle WaSolterra Global Llc
SCORE
79
5918 19th Ave S Seattle Wa
Rewire upper and main floor. Adding basement bathroom, laundry room, bedroom, living area 05 26 17 cep; contractor transferred from solterra systems to solterra global. 6 2 2017 sr add (1)2 amp feeder
Date:  April 7, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: August 21, 2017 | Expiration date: April 7, 2018 | Current use: Single family / duplex | Permit id: 6590507
2017/04/070795918 19th Ave S Seattle WaSolterra Global Llc
SCORE
79
416 24th Ave E Seattle Wa
A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 13. 5kw solar pv system on roof, nema plug in garage 04 18 17 cep; contractor transferred from solterra systems to solterra global. 5 26 17 cpg add (1) 2 amp service
Date:  April 5, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590109
2017/04/05079416 24th Ave E Seattle WaSolterra Global Llc
SCORE
79
7316 10th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] electrical upgrade from 125a service to 200a service, and installation of 6. 3kw solar pv system on roof of home. (21) itek 300wse modules, (1) solectria pvi6600tl inverter, iron ridge roof mount rail 04 18 17 cep; contractor transferred from solterra systems to solterra global.
Date:  March 6, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: April 20, 2017 | Expiration date: March 6, 2018 | Current use: Single family / duplex | Permit id: 6584481
2017/03/060797316 10th Ave Nw Seattle WaSolterra Global Llc
SCORE
79
3506 Ne 60th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 6kw solar pv system on roof of home
Date:  September 11, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: December 8, 2017 | Expiration date: September 11, 2018 | Current use: Single family / duplex | Permit id: 6618108
2017/09/110793506 Ne 60th St Seattle WaSolterra Global Llc
SCORE
79
3704 Cheasty Blvd S Seattle Wa
7-26-17 bz pv sytem one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 8kw solar pv system on roof of home. (26) itek 300wse modules, (1) solaredge se7600a inverter
Date:  July 24, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2017 | Expiration date: July 24, 2018 | Current use: Single family / duplex | Permit id: 6609532
2017/07/240793704 Cheasty Blvd S Seattle WaSolterra Global Llc
SCORE
79
3911 Wallingford Ave N Seattle Wa
5-1-17 bz note:plan states 7. 25kva system (typo) actually 7. 5kva system as permit states 25modules x 300va =7. 5kva system4-11-17 pv system approved .[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 5kw solar pv system on roof. (25) itek 3 modules, (1) 7. 6kw inverter. 04 18 17 cep; contractor transferred from solterra systems to solterra global.
Date:  April 5, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: May 4, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590086
2017/04/050793911 Wallingford Ave N Seattle WaSolterra Global Llc
SCORE
79
1823 Ne Ravenna Blvd Seattle Wa
10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 2kw solar pv system on roof of home; service upgrade from 125a to 200a
Date:  October 16, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: December 12, 2017 | Expiration date: October 16, 2018 | Current use: Single family / duplex | Permit id: 6624591
2017/10/160791823 Ne Ravenna Blvd Seattle WaSolterra Global Llc
SCORE
79
5105 Ne 45th St Seattle Wa
8-28-17 bz plan review waived 2017 threshold 7. 7kva. Solar edge optimizers and inverter limits output to below7. 7kva. Final approval subject to field inspector. A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4kw solar pv system on roof of home
Date:  September 6, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: September 6, 2018 | Current use: Single family / duplex | Permit id: 6617241
2017/09/060795105 Ne 45th St Seattle WaSolterra Global Llc
SCORE
79
7506 34th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 49 kw solar pv system on roof of home
Date:  October 26, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2017 | Expiration date: October 26, 2018 | Current use: Single family / duplex | Permit id: 6626628
2017/10/260797506 34th Ave Nw Seattle WaSolterra Global Llc
SCORE
79
57 36th Ave Ne Seattle Wa
4-6-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 10. 5kw solar pv system on roof, bus upgrade, moving some breakers from main panel to subpanel. 04 18 17 cep; contractor transferred from solterra systems to solterra global.
Date:  April 5, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: May 22, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590039
2017/04/0507957 36th Ave Ne Seattle WaSolterra Global Llc
SCORE
79
8001 22nd Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 6kw solar pv system on roof of home. (22) itek 300wse modules, (1) solaredge se7600a inverter
Date:  September 20, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: November 9, 2017 | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6619956
2017/09/200798001 22nd Ave Nw Seattle WaSolterra Global Llc
SCORE
79
1262 Alki Ave Sw Seattle Wa
Move existing house and demo foundation to grade per plan. (moved outside seattle city limits)
Date:  October 8, 2017

Applicant: Ohare, Jon | Permit type: Demolition | Permit status: Permit issued | Expiration date: April 8, 2019 | Current use: Commercial | Permit id: 6592230
2017/10/080791262 Alki Ave Sw Seattle WaSolterra Global Llc
SCORE
79
5128 S Orcas St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 5kw pv system on roof
Date:  December 4, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 4, 2018 | Current use: Single family / duplex | Permit id: 6633264
2017/12/040795128 S Orcas St Seattle WaSolterra Global Llc
SCORE
79
10739 Exeter Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 1 kw solar pv system on roof of home
Date:  October 26, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2017 | Expiration date: October 26, 2018 | Current use: Single family / duplex | Permit id: 6626676
2017/10/2607910739 Exeter Ave Ne Seattle WaSolterra Global Llc
SCORE
79
9828 62nd Ave S Seattle Wa
3-24-17 bz approved pv sys [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 12. 6kw solar pv system on roof of home. (42) itek 300wse modules, (2) solectria pvi6600tl inverters. 04 18 17 cep; contractor transferred from solterra systems to solterra global. 5 26 2017 sr add: (1) 225amp service.
Date:  March 6, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 5, 2017 | Expiration date: March 6, 2018 | Current use: Single family / duplex | Permit id: 6584510
2017/03/060799828 62nd Ave S Seattle WaSolterra Global Llc
SCORE
79
5303 S Alaska St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 8kw pv system on roof. Service upgrade from 125amp - 200amp
Date:  November 29, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632467
2017/11/290795303 S Alaska St Seattle WaSolterra Global Llc
SCORE
79
5312 S Fletcher St Seattle Wa
4-26-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 5kw solar pv system on roof. (25) itek 300wse modules, (1) solaredge se7600-a inverter
Date:  April 24, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: April 24, 2018 | Current use: Single family / duplex | Permit id: 6593290
2017/04/240795312 S Fletcher St Seattle WaSolterra Global Llc
SCORE
79
5312 S Fletcher St Seattle Wa
Homeowner did not have original panel inspected, correction required for permit number 6593290. Pulling permit for existing electrical panel.
Date:  June 6, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: June 6, 2018 | Current use: Single family / duplex | Permit id: 6601198
2017/06/060795312 S Fletcher St Seattle WaSolterra Global Llc
SCORE
79
57 29th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 8kw solar pv system on roof of home
Date:  July 24, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: September 21, 2017 | Expiration date: July 24, 2018 | Current use: Single family / duplex | Permit id: 6609551
2017/07/2407957 29th Ave Ne Seattle WaSolterra Global Llc
SCORE
79
4001 Sw Concord St Seattle Wa
A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. Installation of 7. 2kw solar pv system on roof of home. (24) itek 300w modules, (1) solaredge 76 inverter. 5 26 17 cpg add (1) 2 amp service
Date:  April 24, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: May 30, 2017 | Expiration date: April 24, 2018 | Current use: Single family / duplex | Permit id: 6593256
2017/04/240794001 Sw Concord St Seattle WaSolterra Global Llc
SCORE
79
1421 39th Ave E Seattle Wa
4-11-17 bz pv system approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 3kw solar pv system on roof. (28) itek 3 modules, (1) solaredge 76 inverter. 04 18 17 cep; contractor transferred from solterra systems to solterra global.
Date:  April 7, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2017 | Expiration date: April 7, 2018 | Current use: Single family / duplex | Permit id: 6590559
2017/04/070791421 39th Ave E Seattle WaSolterra Global Llc
SCORE
79
4219 2nd Ave Ne Seattle Wa
4-27-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 8kw solar pv system on roof. (26) itek 300w modules, (1) solaredge 76 inverter
Date:  April 20, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 12, 2017 | Expiration date: April 20, 2018 | Current use: Single family / duplex | Permit id: 6592749
2017/04/200794219 2nd Ave Ne Seattle WaSolterra Global Llc
SCORE
79
4219 2nd Ave Ne Seattle Wa
Panel upgrade, service move
Date:  June 9, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: June 13, 2017 | Expiration date: June 9, 2018 | Current use: Single family / duplex | Permit id: 6601965
2017/06/090794219 2nd Ave Ne Seattle WaSolterra Global Llc
SCORE
79
5918 19th Ave S Seattle Wa
2-24-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 25 kw solar pv energy system on roof of home. (25) itek 290w modules, (1) solaredge 7kw inverter 04 18 17 cep; contractor transferred from solterra systems to solterra global.
Date:  February 6, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2017 | Expiration date: February 6, 2018 | Current use: Single family / duplex | Permit id: 6579828
2017/02/060795918 19th Ave S Seattle WaSolterra Global Llc
SCORE
79
62 43rd Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 12kw pv system on roof. Change electrical panel from a 2 amp panel to a 2 amp panel with a 225 amp bus rating 12-5-17 bz pv one-line approved
Date:  November 29, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632476
2017/11/2907962 43rd Ave Ne Seattle WaSolterra Global Llc
SCORE
79
3634 Ne 120th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 9kw pv system on roof. Bus upgrade from 2 to 225. Service and panel will remain 2 amps 12-5-17 bz pv one-line approved
Date:  December 4, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 4, 2018 | Current use: Single family / duplex | Permit id: 6633266
2017/12/040793634 Ne 120th St Seattle WaSolterra Global Llc
SCORE
79
20 N 78th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 49kw solar pv system on roof, installation of nema plug (just the plug, not a charging station)
Date:  May 12, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: July 12, 2017 | Expiration date: May 12, 2018 | Current use: Single family / duplex | Permit id: 6596851
2017/05/1207920 N 78th St Seattle WaSolterra Global Llc
SCORE
79
719 N 128th St Seattle Wa
9-21-17 bz pv plan review waived under 2017 threshold 7. 7kva final subject to field inspectors approval.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4kw solar pv system on roof of home. (28) itek 300wse modules, (1) solaredge se7600a inverterfull service upgrade and meter main, upgrading service from 100a to 200a
Date:  September 20, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6619952
2017/09/20079719 N 128th St Seattle WaSolterra Global Llc
SCORE
79
5914 Upland Ter S Seattle Wa
9-21-17 bz pv plan review waived under 2017 threshold 7. 7kva final subject to field inspectors approval[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4kw solar pv system on roof of home. (28) itek 300wse modules, (1) solaredge se7600a inverter
Date:  September 20, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6619948
2017/09/200795914 Upland Ter S Seattle WaSolterra Global Llc
SCORE
79
614b N 138th St Seattle Wa
6-16-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 6kw solar pv system on roof of home; bus upgrade
Date:  June 9, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: July 7, 2017 | Expiration date: June 9, 2018 | Current use: Single family / duplex | Permit id: 6601995
2017/06/09079614b N 138th St Seattle WaSolterra Global Llc
SCORE
79
1927 Nw 97th St Seattle Wa
7-25-17 pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 92kw solar pv system on roof of home
Date:  July 24, 2017

Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2017 | Expiration date: July 24, 2018 | Current use: Single family / duplex | Permit id: 6609497
2017/07/240791927 Nw 97th St Seattle WaSolterra Global Llc
SCORE
79
96 51st Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 8. 4kw pv system on roof
Date:  December 4, 2017

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 4, 2018 | Current use: Single family / duplex | Permit id: 6633260
2017/12/0407996 51st Ave S Seattle WaSolterra Global Llc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.