Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 4555 Overlook Ave Sw, Washington, Dc 20375 Install new water lines to replace existing water distribution system. Typical installation method will be to install new pipe in existing trench once old pipe has been removed Date: April 24, 2013 Contractor: Sinclair Callen Client: Brad Stone - Navfac Washington | Permit type: Addition | Permit status: Permit issued | Permit id: B1304408 |