Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 40 Benning Rd Ne, Washington, Dc 20019 A hollow stem auger will install up to temporary dewatering wells to a depth of feet. At depth, up to a 5 inch well assembly with feet of screen will be set and select filter placed. Into each well will be install a 1 hp submersible pump. Effluent will be directed through a common manifold to a baffled settling tank, then through the approved water treatment system and discharged into the location detailed on the temporary discharged authorization permit. ![]() ![]() Client: Pennrose Pennrose Properties, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600136 |