Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 136146 Harrison Av Boston Ma Grinding burning cutting welding &; soldering of new;&; existing;steel steam;&; chilled water piping and existing hot chilled water copper piping to facilitate new heating &; cooling elements (dpl) bfd paid detail required Date: April 14, 2017 Contractor: Ryan Beers Permit type: Bfd cutting-burning-welding | Permit id: Cbw698275 | |||||
SCORE 79 1 Blackfan Ci Boston Ma Cutting and welding for installation of new heating coil for a cage washing system (dpl) bfd paid detail required Date: May 10, 2017 Contractor: Ryan Beers Client: Childrens Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw705708 | Parcel: 0401853100 | |||||
SCORE 79 1 Blackfan Ci Boston Ma Cutting and welding for installation of new heating coil for a cage washing system (dpl) extension of permit #cbw705708 bfd paid detail required Date: May 11, 2017 Contractor: Ryan Beers Client: Childrens Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw707862 | Parcel: 0401853100 | |||||
SCORE 79 2139 District Av Dorchester Ma Welding only for the installation of new black iron kitchen exhaust ductwork for the south bay cinema. (dpl) bfd paid detail required Date: May 26, 2017 Contractor: Ryan Beers Client: Allstate Road (edens) Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw712753 | Parcel: 0703498000 | |||||
SCORE 79 23 Dry Dock Av Boston Ma Cutting burning welding as necessary to install new hot water and chilled water piping. Also new duct work and associated equipment (dpl) bfd paid detail required Date: June 28, 2017 Contractor: Ryan Beers Client: Jamestown 21-23-25 Drydock | Permit type: Bfd cutting-burning-welding | Permit id: Cbw723767 | Parcel: 0602674013 | |||||
SCORE 79 8 Harrison Av Boston Ma Stainless steel duct welding and angle iron cutting (dpl) bfd paid detail required Date: July 6, 2017 Contractor: Ryan Beers Client: Boston Public Health Comm | Permit type: Bfd cutting-burning-welding | Permit id: Cbw724921 | Parcel: 0801420000 | |||||
SCORE 79 4 Yawkey Wy Boston Ma Welding burning grinding of new steel brace to existing grease duct &;chilled water pipe;(dpl) bfd paid detail required Date: January 17, 2017 Contractor: Ryan Beers Client: Henry John W Ts | Permit type: Bfd cutting-burning-welding | Permit id: Cbw671076 | Parcel: 0504199000 | |||||
SCORE 79 8 Harrison Av Boston Ma Welding only of stainless steel duct-work for specialized exhaust systems within the new infill area and connector sections;&; of angle iron for duct support within the new infill and connector sections. (dpl) bfd paid detail required Date: January 31, 2017 Contractor: Ryan Beers Client: Boston Public Health Comm | Permit type: Bfd cutting-burning-welding | Permit id: Cbw675161 | Parcel: 0801420000 | |||||
SCORE 79 3 Brookline Av Boston Ma Soldering of new hw supply and return piping;and welding of stainless steel exhaust ductwork for the installation of new rooftop fan exhaust fans serving table exhaust (dpl) bfd paid detail required Date: March 23, 2017 Contractor: Ryan Beers Client: Beth Israel Deaconess | Permit type: Bfd cutting-burning-welding | Permit id: Cbw689875 | Parcel: 0401862000 | |||||
SCORE 79 2282 Centre St Dorchester Ma Welding cutting burning of black iron duct for the installation of a new kitchen exhaust system (dpl) Date: January 9, 2017 Contractor: Ryan Beers Client: Epiphany School Inc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw666025 | Parcel: 1601229000 | |||||
SCORE 79 117 Western Av Boston Ma Cutting and welding new 3 4" hot water pipes onto buildings existing hot water pipes (dpl) bfd paid detail required Date: July 20, 2017 Contractor: Ryan Beers Permit type: Bfd cutting-burning-welding | Permit id: Cbw733137 |