Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 73 Applicant: Winfrey, Bob | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6252691 | |||||
SCORE 73 1 4th Ave N Seattle Wa Interior & exterior structural upgrade to support 2nd floor work & structural addition to support (3) cooling tower & (1) pump on existing roof, per plan. Applicant: Winfrey, Robert | Permit type: Construction | Permit status: Permit closed | Completion date: October 15, 2009 | Expiration date: February 28, 2011 | Current use: Commercial | Permit id: 6219064 | |||||
SCORE 73 2 Williams St Nw, Atlanta, Ga 30303 Paint a mural on loading dock fascade , install fuel oil pumps and piping from existing underground, diesel fuel tank to new generator, install new generator in loading dock per planning approval. #sap-11-120 approval limited to site plan only... Applicant has been notified of additional requirements for fuel tank installation approval., pursuant to state and local rules and regulations. Date: December 22, 2011 Contractor: Rubicon Integration Llc Permit type: Addition | Permit status: No co required | Permit id: Bb-201105908 | |||||
SCORE 73 Date: December 13, 2011 Contractor: Rubicon Integration Llc Permit type: Alteration | Permit status: No co required | Permit id: Bb-201105765 | |||||
SCORE 73 56 Marietta St Nw, Atlanta, Ga 30303 1. New preaction system 2. New electrical room with dc plant 3. New hvac equipment 4. New finishes in lobby and corridor 5. New raised floor system Date: October 10, 2011 Contractor: Rubicon Integration Llc Permit type: Alteration | Permit status: No co required | Permit id: Bb-201104708 |