SCORE

ROBERT HOSTETLER

ABOUT ROBERT HOSTETLER

Robert Hostetler specializes in:

Robert Hostetler offers services:

Based on the information received from , associated with Robert Hostetler over the past .

If you are considering hiring Robert Hostetler for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Robert Hostetler has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
South Capitol Street Sw And M Street Sw Washington Dc
Installation of 2 geotechnical soil borings (em4-01 and em4-2 ) in the pavement and median areas along south capitol street sw between n street sw and l street sw
Date:  September 10, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring t | Permit id: Pa100089
2014/09/10082South Capitol Street Sw And M Street Sw Washington DcRobert Hostetler
SCORE
82
Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3a
Installation of 13 geotechnical soil borings in the pavement and adjacent grassy areas underneath and along suitland parkway se between fifth sterling ave se and stanton rd. Se
Date:  September 10, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring t | Permit id: Pa100090
2014/09/10082Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3aRobert Hostetler
SCORE
82
Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3a
Installation of 14 geotechnical soil borings within the pavement and adjacent grassy areas on suitland parkway from firth sterling ave se to the adjacent intersection of sheridan rd se and pomeroy rd se adjacent to suitland parkway.
Date:  September 15, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring t | Permit id: Pa100218
2014/09/15082Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3aRobert Hostetler
SCORE
82
South Capitol Street Sw And M Street Sw Washington Dc
Installation of 14 geotechnical soil borings within the pavement area on south capitol street from d street se to o street sw
Date:  September 16, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring t | Permit id: Pa100275
2014/09/16082South Capitol Street Sw And M Street Sw Washington DcRobert Hostetler
SCORE
82
Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3a
Three (3) geotechnical borings along suitland parkway between stanton rd, se and bowen rd, se as well as m st, se between south capitol st, sw and carrollsburg pl, sw.
Date:  November 23, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring t | Permit id: Pa103033
2014/11/23082Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3aRobert Hostetler
SCORE
82
New Jersey Avenue Se And I Street Se Washington Dc
Eight (8) geotechnical borings along new jersey ave, se between d st, se and m st, se
Date:  November 23, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring t | Permit id: Pa103032
2014/11/23082New Jersey Avenue Se And I Street Se Washington DcRobert Hostetler
SCORE
82
Exit 1 From Interstate 295 Northbound To Laboratory Road Sw Washington 1
Eighteen (18) geotechnical borings within the shoulder areas along segments of dc village lane, blue plains drive, shepard drive, laboratory road, overlook avenue, i-295 and south capitol street sw.
Date:  November 18, 2014
Contractor: Robert Hostetler

Client: Bo Yuan | Permit type: Excavation; boring t | Permit id: Pa102902
2014/11/18082Exit 1 From Interstate 295 Northbound To Laboratory Road Sw Washington 1Robert Hostetler
SCORE
82
Exit 1 From Interstate 295 Northbound To Laboratory Road Sw Washington Dc
Eighteen (18) geotechnical borings within the shoulder areas along segments of dc village lane, blue plains drive, shepard drive, laboratory road, overlook avenue, i-295 and south capitol street sw.
Date:  November 18, 2014
Contractor: Robert Hostetler

Client: Bo Yuan | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: April 2, 2015 | Permit id: Pa102902
2014/11/18082Exit 1 From Interstate 295 Northbound To Laboratory Road Sw Washington DcRobert Hostetler
SCORE
82
Exit 1 From Interstate 295 Northbound To Laboratory Road Sw Washington Dc
Eighteen (18) geotechnical borings within the shoulder areas along segments of dc village lane, blue plains drive, shepard drive, laboratory road, overlook avenue, i-295 and south capitol street sw.
Date:  January 19, 2015
Contractor: Robert Hostetler

Permit status: Permit expired | Expiration date: April 2, 2015 | Permit id: Pa102902
2015/01/19082Exit 1 From Interstate 295 Northbound To Laboratory Road Sw Washington DcRobert Hostetler
SCORE
82
South Capitol Street Bn Under Interstate 695 Washington Dc
Installation of 8 geotechnical soil borings within the pavement and adjacent grassy areas near the overpass of interstate 695 over south capitol street
Date:  July 14, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: February 12, 2015 | Permit id: Pa97748
2014/07/14082South Capitol Street Bn Under Interstate 695 Washington DcRobert Hostetler
SCORE
82
Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc
Installation of 13 geotechnical soil borings in the pavement and adjacent grassy areas underneath and along suitland parkway se between fifth sterling ave se and stanton rd. Se
Date:  September 10, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: February 12, 2015 | Permit id: Pa100090
2014/09/10082Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington DcRobert Hostetler
SCORE
82
South Capitol Street Sw And M Street Sw Washington Dc
Installation of 14 geotechnical soil borings within the pavement area on south capitol street from d street se to o street sw
Date:  September 16, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: February 12, 2015 | Permit id: Pa100275
2014/09/16082South Capitol Street Sw And M Street Sw Washington DcRobert Hostetler
SCORE
82
Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc
Installation of 14 geotechnical soil borings within the pavement and adjacent grassy areas on suitland parkway from firth sterling ave se to the adjacent intersection of sheridan rd se and pomeroy rd se adjacent to suitland parkway.
Date:  September 15, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: April 4, 2015 | Permit id: Pa100218
2014/09/15082Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington DcRobert Hostetler
SCORE
82
South Capitol Street Sw And M Street Sw Washington Dc
Installation of 2 geotechnical soil borings (em4-01 and em4-2 ) in the pavement and median areas along south capitol street sw between n street sw and l street sw
Date:  September 10, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: April 3, 2015 | Permit id: Pa100089
2014/09/10082South Capitol Street Sw And M Street Sw Washington DcRobert Hostetler
SCORE
82
New Jersey Avenue Se And I Street Se Washington Dc
Eight (8) geotechnical borings along new jersey ave, se between d st, se and m st, se
Date:  November 23, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 19, 2015 | Permit id: Pa103032
2014/11/23082New Jersey Avenue Se And I Street Se Washington DcRobert Hostetler
SCORE
82
Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc
Three (3) geotechnical borings along suitland parkway between stanton rd, se and bowen rd, se as well as m st, se between south capitol st, sw and carrollsburg pl, sw.
Date:  November 23, 2014
Contractor: Robert Hostetler

Client: Ehab Shatnawi | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 19, 2015 | Permit id: Pa103033
2014/11/23082Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington DcRobert Hostetler
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.