Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 18 Haight St San Francisco Ca Install approx 176 lineal ft of 4 high lifeguard wrought iron fencing and gate. Fence to include sliding gate and new vegetation area as proposed Current use: Clinics-medic/d | Permit id: #201104224616 | |||||
SCORE 96 222 Mason St San Francisco Ca 5th floor:partial demolition and refurbishment of extg back of house office on the 5th floor of the hotel nikko. Current use: Tourist hotel/m | Permit id: #201305146819 | |||||
SCORE 96 222 Mason St San Francisco Ca 6th floor:voluntary conversion of 1 accessible guest room to 1 accessible guest room with a roll in shower and to make other modifications necessary to enhandle accessibility. Current use: Tourist hotel/m | Permit id: #201305146820 | |||||
SCORE 96 222 Mason St San Francisco Ca Renovation of 107 guestrms (flrs b2 6- 21 & 23)including accessible guest rooms w roll-in showers replace (e) bathtubs w showers new plumbing fixtures new finishes new millwork & new partitions combine 2 guestrm to 1 accessible. Elec plbg mech fire sprinkler fire alarm deferred submittals. Current use: Tourist hotel/m | Permit id: #201311071358 | |||||
SCORE 96 222 Mason St San Francisco Ca Demolitoin of existing abandoned chillers on the roof total of 3 units number 3 4 5 as referenced on plan m-1. No other work. Current use: Tourist hotel/m | Permit id: #201311071382 | |||||
SCORE 96 222 Mason St San Francisco Ca Revision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. N a maher ordinance Current use: Tourist hotel/m | Permit id: #201410038020 | |||||
SCORE 96 222 Mason St San Francisco Ca 26th floor:1)replace heating units with high fire. Boiler units. 2)install new combined heat and power units (chp). N a for the maher ordinance #155-13 Current use: Tourist hotel/m | Permit id: #201403281904 | |||||
SCORE 96 222 Mason St San Francisco Ca Control upgrades to 4 air handlers. Replace 25 vav terminals with new controls Date: July 11, 2014 Contractor: Robert Goike Current use: Tourist hotel/m | Permit id: #201407111096 | |||||
SCORE 96 Date: July 11, 2014 Contractor: Robert Goike Current use: Tourist hotel/m | Permit id: #201407111100 | |||||
SCORE 96 222 Mason St San Francisco Ca Revision to app#201412173899 to remove four parking lifts and the 1 hr fire resistance rating from the boiler room enclosure(as permitted by cbc 509. 4) from the scope of work. Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201503029664 | |||||
SCORE 96 222 Mason St San Francisco Ca Level b1 b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. Fire alarm fire sprinkler flue vent detail will be deferred submittal. Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201412173899 | |||||
SCORE 96 222 Mason St San Francisco Ca Retroactively convert 14 parking spaces on level b3 into 6 storage areas 5 of which will be used for bldg maintenance purposed. Transfer "floor area gross" from level b3 to level 5 via parking space to bldg. Maintenance storage conversion. Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201505277322 | |||||
SCORE 96 Unit 28 / 27 19th Av San Francisco Ca To complete work under approved permit application #201206192871. Permit type: Building permit | Current use: Apartments | Permit id: #201509258150 | |||||
SCORE 96 Unit 0 / 222 Mason St San Francisco Ca Deferred submittal of title 24 drawings to pool renovation project interior and exterior ref pa 2015-1001-8549 and 2016-0619-9436 mhc engineering (t-24 drawings) mcmillan electric Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201605127271 | |||||
SCORE 96 Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201601217658 | |||||
SCORE 96 Unit 0 / 222 Mason St San Francisco Ca Demolitoin of existing abandoned chillers on the roof total of 3 units number 3 4 5 as referenced on plan m-1. No other work. Permit type: Building permit | Expiration date: May 19, 2014 | Current use: Tourist hotel/motel | Permit id: #201311071382 | |||||
SCORE 96 222 Mason St San Francisco Ca Service kitchen remodel for cafe on 1st floor. Install ventless cooking appliance. N/a for maher. Permit type: Building permit | Expiration date: February 6, 2016 | Current use: Tourist hotel/motel | Permit id: #201507161730 | |||||
SCORE 96 222 Mason St San Francisco Ca Revision to app#2015-1001-8549 - 5th floor: new pool coping and water line tile. New stairs into pool. Ada lift station install at hot tub. Minor pool equipment or controls. Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201512215662 | |||||
SCORE 96 222 Mason St San Francisco Ca 25th fl. Control upgrades to 4 air handlers. Replace 25 vav terminals with new controls Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201407111096 | |||||
SCORE 96 Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201407111100 | |||||
SCORE 96 Unit 0 / 222 Mason St San Francisco Ca 5/f: reroofing of (e) roof deck partial demolitoin of (e) storefront for (n) storefront entrances (n) ext. Roof deck w/paver assembly. Permit type: Building permit | Expiration date: July 7, 2017 | Current use: Tourist hotel/motel | Permit id: #201506199436 | |||||
SCORE 96 222 Mason St San Francisco Ca Modification to (e) 3 seismic joint at floors 3 4 & 5 as part of a voluntary seismic retrofit. Work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure cutting slab at pool to struture around columns & associated finish removal & replacements. Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201506229527 | |||||
SCORE 96 222 Mason St San Francisco Ca 26th floor:1)replace heating units with high fire. Boiler units. 2)install new combined heat and power units (chp). N/a for the maher ordinance #155-13 Permit type: Building permit | Expiration date: April 15, 2016 | Current use: Tourist hotel/motel | Permit id: #201403281904 | |||||
SCORE 96 Unit 0 / 222 Mason St San Francisco Ca Renovation of 107 guestrms (flrs b2 6- 21 & 23)including accessible guest rooms w/roll-in showers replace (e) bathtubs w/showers new plumbing fixtures new finishes new millwork & new partitions combine 2 guestrm to 1 accessible. Elec plbg mech fire sprinkler fire alarm deferred submittals. Permit type: Building permit | Expiration date: November 19, 2015 | Current use: Tourist hotel/motel | Permit id: #201311071358 | |||||
SCORE 96 222 Mason St San Francisco Ca 5th floor interor pool deck renovation including (n) pool deck paver flooring; (n) interior finishes; extension of pool deck via enclosure of (e) exterior balconies; mep upgrades. L/s sprinklers deferred Permit type: Building permit | Current use: Tourist hotel/motel | Permit id: #201510018549 | |||||
SCORE 96 222 Mason St San Francisco Ca Revision to 201311071358 - remove accessible guest room types cqs and pk addition of accessible guest room type nd and revision to number and locations of existing accessible guest room type q with roll-in shower upgrade. N/a maher ordinance Permit type: Building permit | Expiration date: October 12, 2015 | Current use: Tourist hotel/motel | Permit id: #201410038020 | |||||
SCORE 96 18 Haight St San Francisco Ca Install approx 176 lineal ft of 4 high lifeguard wrought iron fencing and gate. Fence to include sliding gate and new vegetation area as proposed Permit type: Building permit | Expiration date: January 18, 2012 | Current use: Clinics-medic/dental | Permit id: #201104224616 | |||||
SCORE 96 222 Mason St San Francisco Ca 5th floor:partial demolition and refurbishment of extg back of house office on the 5th floor of the hotel nikko. Permit type: Building permit | Expiration date: May 23, 2014 | Current use: Tourist hotel/motel | Permit id: #201305146819 | |||||
SCORE 96 222 Mason St San Francisco Ca 6th floor:voluntary conversion of 1 accessible guest room to 1 accessible guest room with a roll in shower and to make other modifications necessary to enhandle accessibility. Permit type: Building permit | Expiration date: September 14, 2013 | Current use: Tourist hotel/motel | Permit id: #201305146820 | |||||
SCORE 96 Unit 0 / 222 Mason St San Francisco Ca The scope of work is to rebuild the accesible curb cut from the porte cochere to the hotel lobby. Create a passenger loading area and install new ada signage. No change in occupancy use or egress. Fire safety under separate permit. N a maher Permit type: Building permit | Expiration date: September 6, 2017 | Current use: Tourist hotel/motel | Permit id: #201702038587 | |||||
SCORE 96 222 Mason St San Francisco Ca The scope of work is to rebuild the accesible curb cut from the porte cochere to the hotel lobby. Create a passenger loading area and install new ada signage. No change in occupancy use or egress. Fire safety under separate permit. N a maher Permit type: Building permit | Expiration date: September 6, 2017 | Current use: Tourist hotel/motel | Permit id: #201702038587 |