SCORE

ROBERT AYER

ABOUT ROBERT AYER

Robert Ayer specializes in:

Robert Ayer offers services:

Based on the information received from , associated with Robert Ayer over the past .

If you are considering hiring Robert Ayer for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Robert Ayer has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
83
40-44 Winchester St Boston Ma 02116
Demo 2 bathrooms and install new tile and fixtures on 4th floor
Date:  December 14, 2012
Value:   $56,000
Contractor: Robert Ayer

Permit type: Interior/exterior wo | Current use: Mixed | Permit id: Sf207043
2012/12/14560008340-44 Winchester St Boston Ma 02116Robert Ayer
SCORE
83
40 44 Winchester St Boston Ma 02116
Demo 2 bathrooms and install new tile and fixtures on 4th floor
Date:  December 14, 2012
Value:   $56,000
Contractor: Robert Ayer

Permit type: Interior/exterior work | Permit status: Expired | Current use: Mixed | Permit id: Sf207043
2012/12/14560008340 44 Winchester St Boston Ma 02116Robert Ayer
SCORE
83
5 Huntington Av Mission Hill Ma 02115
Remove existing sidewalk. Excavate 18" deep x 6 x 6 repair a broken ac line back fill and pour a new sidewalk
Date:  March 1, 2017
Value:   $5,880
Contractor: Robert Ayer

Client: Wentworth Institute | Permit type: Excavation borings test pits | Permit status: Open | Current use: Other | Permit id: Sf675824 | Parcel: 0402024000
2017/03/015880835 Huntington Av Mission Hill Ma 02115Robert Ayer
SCORE
83
4044 Winchester St Boston Ma 02116
Demo 2 bathrooms and install new tile and fixtures on 4th floor
Date:  December 14, 2012
Value:   $56,000
Contractor: Robert Ayer

Permit type: Interior/exterior work | Permit status: Expired | Current use: Mixed | Permit id: Sf207043
2012/12/1456000834044 Winchester St Boston Ma 02116Robert Ayer
SCORE
83
138 Marlborough St Boston Ma 02116
Demo work only on the kitchen and 2 bathrooms for the architect to get a final design
Date:  June 9, 2014
Value:   $20,000
Contractor: Robert Ayer

Client: One 38 Marlborough Street | Permit type: Demolition - interior | Current use: 1-3fam | Permit id: Sf369262 | Parcel: 502902000
2014/06/092000083138 Marlborough St Boston Ma 02116Robert Ayer
SCORE
83
138 Marlborough St Boston Ma 02116
Remodel kitchen new cabinets and flooring. Remodel 2 bathrooms new fixtures and tile. Relocate 8 sprinkler heads. Refinish hardwood floors. Paint entire unit.
Date:  July 17, 2014
Value:   $150,000
Contractor: Robert Ayer

Client: One 38 Marlborough Street | Permit type: Renovations -interior nsc | Current use: 1-4fam | Permit id: Sf385437 | Parcel: 502902000
2014/07/1715000083138 Marlborough St Boston Ma 02116Robert Ayer
SCORE
83
138 Marlborough St Boston Ma 02116
1. Remove and dispose of the existing natural gas fuel fireplace and install a new natural gas fireplace. Install new non-bearing partitions around fireplace. 2. Remove and dispose of existing wood railings treads and risers and install new stainless steel railing and walnut treads and poplar risers 3. Remove wall board off all bedroom walls and reframe non bearing walls for a master closet 4. Frame 4th floor non-bearing bedroom walls for new bathroom and closet layout. 5. Correct and repair 4 steps from winders to regular steps. All interior work only
Date:  August 11, 2014
Value:   $42,143
Contractor: Robert Ayer

Client: One 38 Marlborough Street | Permit type: Interior/exterior work | Permit status: Expired | Current use: 1-4fam | Permit id: Sf394112 | Parcel: 0502902000
2014/08/114214383138 Marlborough St Boston Ma 02116Robert Ayer
SCORE
83
138 Marlborough St Boston Ma
1. Remove and dispose of the existing natural gas fuel fireplace and install a new natural gas fireplace. Install new non-bearing partitions around fireplace. 2. Remove and dispose of existing wood railings treads and risers and install new stainless steel railing and walnut treads and poplar risers 3. Remove wall board off all bedroom walls and reframe non bearing walls for a master closet 4. Frame 4th floor non-bearing bedroom walls for new bathroom and closet layout. 5. Correct and repair 4 steps from winders to regular steps. All interior work only
Date:  August 11, 2014
Value:   $42,143
Contractor: Robert Ayer

Client: Clark Inc | Permit type: Short form bldg permit | Expiration date: February 11, 2015 | Current use: 1-4fam | Permit id: Sf394112 | Parcel: 0502902000
2014/08/114214383138 Marlborough St Boston MaRobert Ayer
SCORE
83
40 44 Winchester St Boston Ma
Demo 2 bathrooms and install new tile and fixtures on 4th floor
Date:  December 14, 2012
Value:   $56,000
Contractor: Robert Ayer

Permit type: Short form bldg permit | Expiration date: June 14, 2013 | Current use: Mixed | Permit id: Sf207043
2012/12/14560008340 44 Winchester St Boston MaRobert Ayer
SCORE
83
138 Marlborough St Boston Ma
Demo work only on the kitchen and 2 bathrooms for the architect to get a final design
Date:  June 9, 2014
Value:   $20,000
Contractor: Robert Ayer

Client: Clark Inc | Permit type: Short form bldg permit | Expiration date: December 9, 2014 | Current use: 1-3fam | Permit id: Sf369262 | Parcel: 0502902000
2014/06/092000083138 Marlborough St Boston MaRobert Ayer
SCORE
83
138 Marlborough St Boston Ma
Remodel kitchen new cabinets and flooring. Remodel 2 bathrooms new fixtures and tile. Relocate 8 sprinkler heads. Refinish hardwood floors. Paint entire unit.
Date:  July 17, 2014
Value:   $150,000
Contractor: Robert Ayer

Client: Clark Inc | Permit type: Short form bldg permit | Expiration date: January 17, 2015 | Current use: 1-4fam | Permit id: Sf385437 | Parcel: 0502902000
2014/07/1715000083138 Marlborough St Boston MaRobert Ayer
SCORE
83
4044 Winchester St Boston Ma
Demo 2 bathrooms and install new tile and fixtures on 4th floor
Date:  December 14, 2012
Value:   $56,000
Contractor: Robert Ayer

Permit type: Short form bldg permit | Expiration date: June 14, 2013 | Current use: Mixed | Permit id: Sf207043
2012/12/1456000834044 Winchester St Boston MaRobert Ayer
SCORE
83
5 Huntington Av Mission Hill Ma
Remove existing sidewalk. Excavate 18" deep x 6 x 6 repair a broken ac line back fill and pour a new sidewalk
Date:  March 1, 2017
Value:   $5,880
Contractor: Robert Ayer

Client: Wentworth Institute | Permit type: Short form bldg permit | Expiration date: September 1, 2017 | Current use: Other | Permit id: Sf675824 | Parcel: 0402024000
2017/03/015880835 Huntington Av Mission Hill MaRobert Ayer
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.