Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington 3a Tlb will conduct eight (8) 6 in. Diameter soil test borings. The soil test borings will be up to a maximum depth of 50 feet. Date: November 25, 2013 Contractor: Richard Negri Permit type: Excavation; boring test pit (each addl) | Permit status: Cancel/withdrawn | Expiration date: March 21, 2014 | |||||
SCORE 82 11 1117 Block Of Good Hope Road Se Washington Dc Tlb will conduct one (1) 6 in. Diameter soil test boring. The soil test boring will be up to a maximum depth of 50 feet. Date: November 26, 2013 Contractor: Richard Negri Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: September 18, 2014 | Permit id: Pa89303 | |||||
SCORE 82 10 1007 Block Of Howard Road Se Washington Dc Thomas l. Brown associates will be performing geotechnical exploration boring test pits. The geotechnical exploration will include six (6) boring test pits. These boring test pits will range from a minimum 6 ft. In depth to approximately 25 ft. Deep maximum. All borings are located along firth sterling avenue from south of suitland parkway to north of howard rd in anacostia s. E., washington dc and will be conducted in "green-space" out of vehicular and pedestrian traffic right-of-way. Work zone locations will be cordoned off using a combination traffic cones, existing chain link fence structures, and "shoulder work (w21-5)" traffic control signs (see traffic control plans 1 & 2). The proposed geotechnical investigation will indirectly benefit wmata. The borings will be used to evaluate the streetcar crossing over the wmata stations as well as evaluate and address any utility conflicts with streetcar crossing. Please be advised that all borings are to be completed at a minimum of 25 ft. Date: November 26, 2013 Contractor: Richard Negri Permit type: Excavation; boring test pit (single), excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: September 22, 2014 | Permit id: Pa89304 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Tlb will conduct eight (8) 6 in. Diameter soil test borings. The soil test borings will be up to a maximum depth of 50 feet. Date: November 25, 2013 Contractor: Richard Negri Permit type: Excavation; boring test pit (each addl) | Permit status: Cancel/withdrawn | Expiration date: March 21, 2014 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Notpaid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Construction staging area Contractor: Richard Negri Permit status: Notpaid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Notpaid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Excavation; boring test pit (each addl) Contractor: Richard Negri Permit status: 3 | Expiration date: March 21, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Tlb will conduct eight (8) 6 in. Diameter soil test borings. The soil test borings will be up to a maximum depth of 50 feet. Contractor: Richard Negri Permit status: Cancel/withdrawn | Expiration date: March 21, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Construction staging area Contractor: Richard Negri Permit status: Not paid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Not paid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Not paid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Excavation; boring test pit (each addl) Contractor: Richard Negri Permit status: 3 | Expiration date: March 21, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Notpaid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Construction staging area Contractor: Richard Negri Permit status: Notpaid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Notpaid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Tlb will conduct eight (8) 6 in. Diameter soil test borings. The soil test borings will be up to a maximum depth of 50 feet. Contractor: Richard Negri Permit status: Cancel/withdrawn | Expiration date: March 21, 2014 | Permit id: 0 | |||||
SCORE 82 11 1117 Block Of Good Hope Road Se Washington Dc Tlb will conduct one (1) 6 in. Diameter soil test boring. The soil test boring will be up to a maximum depth of 50 feet. Date: November 26, 2013 Contractor: Richard Negri Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: September 18, 2014 | Permit id: Pa89303 | |||||
SCORE 82 10 1007 Block Of Howard Road Se Washington Dc Thomas l. Brown associates will be performing geotechnical exploration boring test pits. The geotechnical exploration will include six (6) boring test pits. These boring test pits will range from a minimum 6 ft. In depth to approximately 25 ft. Deep maximum. All borings are located along firth sterling avenue from south of suitland parkway to north of howard rd in anacostia s. E., washington dc and will be conducted in "green-space" out of vehicular and pedestrian traffic right-of-way. Work zone locations will be cordoned off using a combination traffic cones, existing chain link fence structures, and "shoulder work (w21-5)" traffic control signs (see traffic control plans 1 & 2). The proposed geotechnical investigation will indirectly benefit wmata. The borings will be used to evaluate the streetcar crossing over the wmata stations as well as evaluate and address any utility conflicts with streetcar crossing. Please be advised that all borings are to be completed at a minimum of 25 ft. Date: November 26, 2013 Contractor: Richard Negri Permit type: Excavation; boring test pit (single), excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: September 22, 2014 | Permit id: Pa89304 | |||||
SCORE 82 Exit 3a From Interstate 295 Southbound To Suitland Parkway Se Washington Dc Construction staging area Contractor: Richard Negri Permit status: Not paid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Not paid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Contractor: Richard Negri Permit status: Not paid | Expiration date: January 8, 2014 | Permit id: 0 | |||||
SCORE 82 Date: July 7, 2014 Contractor: Richard Negri Permit status: Permit expired | Expiration date: October 26, 2014 | Permit id: Pa10136865 | |||||
SCORE 82 Date: July 7, 2014 Contractor: Richard Negri Permit status: Permit expired | Expiration date: October 26, 2014 | Permit id: Pa10136870 |