Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 83 Client: Fort Hill Sq 1 | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf28368 | Parcel: 304075000 | |||||
SCORE 83 Client: Causeway Primar | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt133987 | Parcel: 303061010 | |||||
SCORE 83 Client: Causeway Primar | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt133987 | Parcel: 0303061010 | |||||
SCORE 83 255 Saint Botolph St Boston Ma 02115 Foundation permit only see ert450897 foundation cost included with ert450897 attached. Date: June 5, 2015 Contractor: Randall E Pitts Client: New England Conservatory | Permit type: Erect | Permit status: Expired | Current use: Mixed | Permit id: Fnd478231 | Parcel: 0402281000 | |||||
SCORE 83 Client: Causeway Primary Condo Trst | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt133987 | Parcel: 0303061010 | |||||
SCORE 83 255 Saint Botolph St Boston Ma 02115 Lpr construction of a new 10-story (plus penthouse 1 000 /- gsf) building connected to an existing building (241 st. Botolph street). The proposed building contains performance and rehearsal areas a dining commons and severy a library and 7-stories of student residences (1br 2br suite &; directors apt). Also demolition of 2 story brick shed structure on same lot. Client: New England Conservatory | Permit type: Addition | Permit status: Expired | Current use: Mixed | Permit id: Ert450897 | Parcel: 0402281000 | |||||
SCORE 83 Client: Fort Hill Sq 1 Owner Llc | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf28368 | Parcel: 0304075000 | |||||
SCORE 83 Client: Fort Hill Sq 1 | Permit type: Short form bldg permit | Expiration date: December 3, 2010 | Current use: Comm | Permit id: Sf28368 | Parcel: 0304075000 | |||||
SCORE 83 255 Saint Botolph St Boston Ma Foundation permit only see ert450897 foundation cost included with ert450897 attached. Date: June 5, 2015 Contractor: Randall E Pitts Client: Industrial Scho | Permit type: Foundation permit | Expiration date: December 5, 2015 | Current use: Mixed | Permit id: Fnd478231 | Parcel: 0402281000 | |||||
SCORE 83 Client: Causeway Primar | Permit type: Long form/alteration permit | Current use: Comm | Permit id: Alt133987 | Parcel: 0303061010 | |||||
SCORE 83 Client: Causeway Primary Condo Trst | Permit type: Long form/alteration permit | Current use: Comm | Permit id: Alt133987 | Parcel: 0303061010 | |||||
SCORE 83 255 Saint Botolph St Boston Ma Lpr construction of a new 10-story (plus penthouse 1 000 /- gsf) building connected to an existing building (241 st. Botolph street). The proposed building contains performance and rehearsal areas a dining commons and severy a library and 7-stories of student residences (1br 2br suite &; directors apt). Also demolition of 2 story brick shed structure on same lot. Client: New England Conservatory | Permit type: Erect/new construction | Expiration date: March 4, 2016 | Current use: Mixed | Permit id: Ert450897 | Parcel: 0402281000 |