Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 50 Southern Ave Se, Washington, Dc 20019 Stabilize existing foundation by using helical piles and brackets. Perform an excavation up to 4 feet or deeper as required adjacent to the foundation perimeter walls of building a -nw and w exterior walls - 11 locations 5 feet on center, and building b -nw and w exterior walls - 5 locations 5 feet on center, by laying soils at 1. 5h:1v and exposing the existing wall footings, then installaing the helical piles to support these footings. Date: September 18, 2015 Contractor: Raja Elawar Client: Frank Demarias | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1511295 |