Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 Unit 1 / 855 El Camino Real, Suite 1, Palo Alto, Ca 94301 Landlord improvement to split suite 1 into five different suites. New demising walls to stop 3-feet short of the front exterior walls and will be infilled as part of the tenant improvments. Patch the roof where rooftop hvac equipment is removed. All mep work to be done as part of the tis. Demo all interior non-structral walls, finishes, and electrical, mechanical, and plumbing within the suite and safe off at the meter. Address assignment to add suites 2-5. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00548 | |||||
SCORE 92 Unit 43 / 855 El Camino Real, Suite 43, Palo Alto, Ca 94301 Suite 43: interior non-structural demo (1185 sf) Date: January 9, 2015 Contractor: Qualogy Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00079 | |||||
SCORE 92 Unit 36 / 855 El Camino Real, Suite 36, Palo Alto, Ca 94301 Voluntary seismic upgrade at building 2, suites 36 and 36b. Approx 3045 sq ft Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00234 | |||||
SCORE 92 Unit 10 / 855 El Camino Real, Suite 10, Palo Alto, Ca 94301 Spec space for a 444 sf tenant space. Suite is being demised to create two tenant spaces. Separate meters are requested for the tenant spaces. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01983 | |||||
SCORE 92 5 Forest Av, Palo Alto, Ca 94301 12-323: revision to no longer demolish dimising wall of adjacent tenant. Revision includes structural details for straping @ windows; holddown @ grid g-9 and ledger @ psl beam. Date: May 22, 2012 Contractor: Qualogy Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00272 | |||||
SCORE 92 Unit 104 / 855 El Camino Real, Suite 104, Palo Alto, Ca 94301 Remodel kitchen and support food service areas of existing bakery. Work includes two new hoods, one type 1 and one type 2 hoods. Health dept approval letter recd 6/27/12. Date: June 27, 2012 Contractor: Qualogy Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01518 | |||||
SCORE 92 Permit status: B-4. Complete, e-4. Compl | Parcel: 09756006 | |||||
SCORE 92 855 El Camino Real, Suite Palo Alto, Ca 94301 15000-00236: change skylight framing and roof/ceiling repair Date: March 26, 2015 Contractor: Qualogy Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00192 | |||||
SCORE 92 Unit 10 / 855 El Camino Real, Suite 10, Palo Alto, Ca 94301 Suite 10b: maila mills ti and u&o for a 439 sf tenant space. No exterior work. U sent 8/21/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03135 | |||||
SCORE 92 Unit 43 / 855 El Camino Real, Suite 43, Palo Alto, Ca 94301 Margaret oleary: ti and u&o for a 1185 sf single story tenant space. Scope of work includes new storefront, skylight, and ducting. U&o sent 5/8/15 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00236 | |||||
SCORE 92 5 Forest Av, Palo Alto, Ca 94301 One medical group: u&o and ti for a 3175 sf tenant space on the ground floor. Rework (e) rooftop hvac equipment ducting on the roof. Need courtesy copy of the utility load sheet. U&o sent 2/12/14 Date: February 9, 2012 Contractor: Qualogy Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00323 | |||||
SCORE 92 855 El Camino Real, Suite Palo Alto, Ca 94301 San Diego Ca 15000-00236: change skylight framing and roof ceiling repair Date: March 26, 2015 Contractor: Qualogy Construction Inc Permit status: Permit issued | Permit id: 15rev-00192 | |||||
SCORE 92 Unit 1 / 855 El Camino Real, Suite 1, Palo Alto, Ca 94301 San Diego Ca Landlord improvement to split suite 1 into five different suites. New demising walls to stop 3-feet short of the front exterior walls and will be infilled as part of the tenant improvments. Patch the roof where rooftop hvac equipment is removed. All mep work to be done as part of the tis. Demo all interior non-structral walls, finishes, and electrical, mechanical, and plumbing within the suite and safe off at the meter. Address assignment to add suites 2-5. Permit status: Permit issued | Permit id: 15000-00548 | |||||
SCORE 92 Unit 43 / 855 El Camino Real, Suite 43, Palo Alto, Ca 94301 San Diego Ca Suite 43: interior non-structural demo (1185 sf) Date: January 9, 2015 Contractor: Qualogy Construction Inc Permit status: Permit issued | Permit id: 15000-00079 | |||||
SCORE 92 Unit 10 / 855 El Camino Real, Suite 10, Palo Alto, Ca 94301 San Diego Ca Suite 10b: maila mills ti and u&o for a 439 sf tenant space. No exterior work. U sent 8 21 14 Permit status: Permit issued | Permit id: 13000-03135 | |||||
SCORE 92 5 Forest Av, Palo Alto, Ca 94301 San Diego Ca One medical group: u&o and ti for a 3175 sf tenant space on the ground floor. Rework (e) rooftop hvac equipment ducting on the roof. Need courtesy copy of the utility load sheet. U&o sent 2 12 14 Date: February 9, 2012 Contractor: Qualogy Construction Inc Permit status: Permit issued | Permit id: 12000-00323 | |||||
SCORE 92 Unit 36 / 855 El Camino Real, Suite 36, Palo Alto, Ca 94301 San Diego Ca Voluntary seismic upgrade at building 2, suites 36 and 36b. Approx 3045 sq ft Permit status: Permit issued | Permit id: 14000-00234 | |||||
SCORE 92 Unit 10 / 855 El Camino Real, Suite 10, Palo Alto, Ca 94301 San Diego Ca Spec space for a 444 sf tenant space. Suite is being demised to create two tenant spaces. Separate meters are requested for the tenant spaces. Permit status: Permit issued | Permit id: 13000-01983 | |||||
SCORE 92 Unit 104 / 855 El Camino Real, Suite 104, Palo Alto, Ca 94301 San Diego Ca Remodel kitchen and support food service areas of existing bakery. Work includes two new hoods, one type 1 and one type 2 hoods. Health dept approval letter recd 6 27 12. Date: June 27, 2012 Contractor: Qualogy Construction Inc Permit status: Permit issued | Permit id: 12000-01518 | |||||
SCORE 92 5 Forest Av, Palo Alto, Ca 94301 San Diego Ca 12-323: revision to no longer demolish dimising wall of adjacent tenant. Revision includes structural details for straping @ windows; holddown @ grid g-9 and ledger @ psl beam. Date: May 22, 2012 Contractor: Qualogy Construction Inc Permit status: Permit issued | Permit id: 12rev-00272 | |||||
SCORE 92 Unit 43 / 855 El Camino Real, Suite 43, Palo Alto, Ca 94301 San Diego Ca Margaret oleary: ti and u&o for a 1185 sf single story tenant space. Scope of work includes new storefront, skylight, and ducting. U&o sent 5 8 15 Date: January 27, 2015 Contractor: Qualogy Construction Inc Permit status: Finaled | Permit id: 15000-00236 |