Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 11 Varnum St Ne, Washington, Dc 20017 Installation of 3 new medium voltage generators, medium voltage paralleling switchgear and medium voltage normal service entrance switchgear, exterior structural masonry screen wall, exterior structural concrete equipment pads on grade with retaining walls, alterations to 2nd floor electrical room in central energy plant cep, replace egress platform and ramp from cep 2nd floor to grade. Date: September 16, 2014 Contractor: Providence Hosp Attn: Vicky Shockey Client: Providence Hospital Attn: Vicky Shockey | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1310143 |