Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 6522 Haverford Ave Philadelphia Pa 191513739 Alterations to existing building to create a daycare in same building with other existing uses not part of this permit. Complies violation requirements. Date: June 3, 2014 Contractor: Priority Building Group Llc Client: Liopoulos Realty Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 23, 2014 | Permit id: 533570 | |||||
SCORE 82 6522 Haverford Ave Philadelphia Pa 191513739 For the installation of a new hvac system throughout a day care facility as shown in approved plans. Work to include new appliances, registers diffusers, fans and all supplemental ductwork. Date: August 18, 2014 Contractor: Priority Building Group Llc Client: Liopoulos Realty Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 27, 2014 | Permit id: 555346 | |||||
SCORE 82 2513 E Gordon St Philadelphia Pa 191253622 Ez interior alterations. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to start Date: October 11, 2016 Contractor: Priority Building Group Llc Client: Lee Christopher Poplar Brighid | Permit type: Alteration permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 728227 | |||||
SCORE 82 508 Dudley St Philadelphia Pa 191482519 Remove and replace receptacles, 18 switches 4 ceiling fans and extend 24 recessed lights, 1 ext gfci and 1 ext light on the existing circuit. Add grounding to the existing 1 amp service as per the 2008 nec. Date: July 18, 2016 Contractor: Priority Building Group Llc Client: Labella Adriana | Permit type: Electrical permit | Permit status: Completed | Completion date: August 22, 2016 | Permit id: 708056 | |||||
SCORE 82 508 Dudley St Philadelphia Pa 191482519 Interior alterations throughout, to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Rear siding and caping, to include roof covering Date: July 15, 2016 Contractor: Priority Building Group Llc Client: Labella Adriana | Permit type: Alteration permit | Permit status: Completed | Completion date: August 12, 2016 | Permit id: 707881 | |||||
SCORE 82 2513 E Gordon St Philadelphia Pa 191253622 Wiring entire building,14 switches, 3 ceiling fans and extend 16 recessed lights, 2 exterior gfci and 2 exterior lights on the existing circuits. Add grounding to the existing 100amp service as per 2008 nec (east district) wiring done by fishing only Date: October 11, 2016 Contractor: Priority Building Group Llc Client: Lee Christopher Poplar Brighid | Permit type: Electrical permit | Permit status: Expired | Completion date: October 11, 2016 | Permit id: 728217 | |||||
SCORE 82 364 E Gorgas Ln Philadelphia Pa 191191905 Ez interior alterations. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to start Date: February 15, 2017 Contractor: Priority Building Group Llc Client: Sweeney Aprile | Permit type: Alteration permit | Permit status: Completed | Completion date: September 12, 2017 | Permit id: 759620 | |||||
SCORE 82 508 Dudley St Philadelphia Pa 191482519 Removal of a furnace and installation of a 95. 5% furnace with a 2 ton condenser and related duct work in the basement,appliance 95% direct vent Date: July 15, 2016 Contractor: Priority Building Group Llc Client: Labella Adriana | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 12, 2016 | Permit id: 707887 | |||||
SCORE 82 2513 E Gordon St Philadelphia Pa 191253622 Removal of old gas furnance & installation of 95% high efficiency furnance. New ductwork as needed. Date: October 11, 2016 Contractor: Priority Building Group Llc Client: Lee Christopher Poplar Brighid | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 728228 |