Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 8 Maine Avenue Sw Washington Dc Bciv activities related to the wharf project- site civil work at the "fish market" intersection to include construction of median, ada curb ramps, gutters, sidewalks, cross walks, and roadway Date: November 14, 2014 Contractor: Pn Hoffman Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Cancel/withdrawn | Expiration date: November 30, 2015 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Re-furbishing of the existing cross walk across maine avenue in front of arena stage. Added signage for safer crossing. Added striping and tubular delineators for safer crossing. Designated tour bus loading unloading zones. Date: February 25, 2015 Contractor: Pn Hoffman Permit type: Bus stop service; commuter bus stop sign (sign + pole installation), bus stop service; tour bus (sign + pole installation), fixture; sign (w/footings)(exception) | Permit status: Cancel/withdrawn | Expiration date: April 15, 2015 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Street scape improvements related to wharf project for public space committee submittal Date: June 26, 2015 Contractor: Pn Hoffman Permit type: Over head work; streetlight(s) installation, fixture; traffic signal installation, excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: August 31, 2015 | Permit id: Pa99984-R1 | |||||
SCORE 98 Date: October 25, 2005 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: November 26, 2005 | Permit id: Pa15675 | |||||
SCORE 98 Date: October 25, 2005 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: December 10, 2005 | Permit id: Pa15687 | |||||
SCORE 98 2125 14th Street Nw Washington Dc Tcp approved by tsa for staging area as per plans renwal of tcp attached Date: January 20, 2006 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: February 18, 2007 | Permit id: Pa17365 | |||||
SCORE 98 698 Maine Avenue Sw Washington Dc Installing street light conduit in the parking lane of maine ave. Sw Date: April 6, 2016 Contractor: Pn Hoffman Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 13, 2016 | Permit id: Pa121237-R1 | |||||
SCORE 98 9 Maine Ave Sw, Washington, Dc 20024 After-hours permit is being sought for the extension of an existing tower crane. Date: October 12, 2016 Contractor: Pn Hoffman Client: Pn Hoffman | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700034 | |||||
SCORE 98 9 Maine Ave Sw, Washington, Dc 20024 After hours permit to work from 5: am till 7: pm monday through saturday excluding thanksgiving day november 24th, and christmas holiday december 26th, 2016 starting october 31st through december 31st. Date: October 28, 2016 Contractor: Pn Hoffman Client: Pn Hoffman | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700102 | |||||
SCORE 98 11 Maine Avenue Sw Washington Dc Relocation of 1 existing vehicle entrances for the fish market (11 maine ave sw). Installation of dual vehicle entrances at market square (between fish market and parcel 1), per approved (and installed) wharf phase 1 traffic signal plans permit. Date: January 9, 2017 Contractor: Pn Hoffman Client: Wharf Horizontal Reit Leaseholder Llc | Permit type: Paving; driveway | Permit status: Issued | Expiration date: February 8, 2018 | Permit id: Pa119575-R1 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Bus stop service; commuter bus stop sign (sign + pole installation), bus stop service; tour bus (sign + pole installation), fixture; sign (w footings)(exception) Contractor: Pn Hoffman Permit status: 3 | Expiration date: April 15, 2015 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; sidewalk(s), paving; mill and overlay, fixture; traffic signal installation, excavation; catch basin(s), excavation; fire hydrant(s), over head work; streetlight(s) installation Contractor: Pn Hoffman Permit status: 3 | Expiration date: November 30, 2015 | Permit id: 0 | |||||
SCORE 98 Date: July 14, 2015 Contractor: Pn Hoffman Permit status: Expired | Expiration date: July 26, 2015 | Permit id: Pa10199435 | |||||
SCORE 98 Date: January 20, 2006 Contractor: Pn Hoffman Permit status: 8 | Expiration date: February 18, 2007 | Permit id: Pa17365 | |||||
SCORE 98 Date: October 25, 2005 Contractor: Pn Hoffman Permit status: 8 | Expiration date: November 26, 2005 | Permit id: Pa15675 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Notpaid | Expiration date: August 23, 2016 | Permit id: 0 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Withdrawn | Expiration date: November 29, 2016 | Permit id: 0 | |||||
SCORE 98 Date: December 1, 2016 Contractor: Pn Hoffman Permit status: Expired | Expiration date: December 2, 2016 | Permit id: Pa10357166 | |||||
SCORE 98 Date: December 1, 2016 Contractor: Pn Hoffman Permit status: Expired | Expiration date: December 15, 2016 | Permit id: Pa10357484 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Construction of new roadways and three street light intersections related to the wharf project- items for ddot public space committee Date: July 29, 2015 Contractor: Pn Hoffman Permit status: Issued | Expiration date: October 1, 2017 | Permit id: Pa97523 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Bciv activities related to the wharf project- site civil work at the "fish market" intersection to include construction of median, ada curb ramps, gutters, sidewalks, cross walks, and roadway Contractor: Pn Hoffman Permit status: Cancel/withdrawn | Expiration date: November 30, 2015 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Installation of traffic signals, manholes, and conduit at the new fish market intersection located between 9th street and 12th street sw. This work will include 8 new manholes, 11 new traffic signals, and conduit between these. Date: March 12, 2015 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: June 9, 2015 | Permit id: Pa101606 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Re-furbishing of the existing cross walk across maine avenue in front of arena stage. Added signage for safer crossing. Added striping and tubular delineators for safer crossing. Designated tour bus loading unloading zones. Contractor: Pn Hoffman Permit status: Cancel/withdrawn | Expiration date: April 15, 2015 | Permit id: 0 | |||||
SCORE 98 Date: July 28, 2015 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: August 2, 2015 | Permit id: Pa10200271 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Not paid | Expiration date: August 23, 2016 | Permit id: 0 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Withdrawn | Expiration date: November 29, 2016 | Permit id: 0 | |||||
SCORE 98 Date: December 9, 2016 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: February 28, 2017 | Permit id: Pa10350448-R1 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Approved (pending payment | Expiration date: October 3, 2017 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; sidewalk(s), paving; mill and overlay, fixture; traffic signal installation, excavation; catch basin(s), excavation; fire hydrant(s), over head work; streetlight(s) installation Contractor: Pn Hoffman Permit status: 3 | Expiration date: November 30, 2015 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Bus stop service; commuter bus stop sign (sign + pole installation), bus stop service; tour bus (sign + pole installation), fixture; sign (w footings)(exception) Contractor: Pn Hoffman Permit status: 3 | Expiration date: April 15, 2015 | Permit id: 0 | |||||
SCORE 98 11 Maine Avenue Sw Washington Dc Paving; driveway(s) repair or replace, paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; stormwater mgmt (serve public), paving; sidewalk (porous pervious), paving; curb & gutter(s), paving; mill and overlay, fixture; bike rack(s), fixture; trash receptacle(s) (exception), over head work; streetlight(s) installation Date: November 20, 2015 Contractor: Pn Hoffman Client: Wharf Horizontal Reit Leaseholder Llc | Permit type: Paving; driveway | Permit status: Permit expired | Expiration date: February 8, 2017 | Permit id: Pa119575 | |||||
SCORE 98 698 Maine Avenue Sw Washington Dc Installing street light conduit in the parking lane of maine ave. Sw Date: January 4, 2016 Contractor: Pn Hoffman Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 14, 2016 | Permit id: Pa121237 | |||||
SCORE 98 2125 14th Street Nw Washington Dc Tcp approved by tsa for staging area as per plans renwal of tcp attached Date: January 16, 2007 Contractor: Pn Hoffman Permit type: Occupancy; staging area(s), occupancy; new bldg. | Permit status: Permit expired | Expiration date: August 18, 2007 | Permit id: Pa24750 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Notpaid | Expiration date: August 23, 2016 | Permit id: 0 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Withdrawn | Expiration date: November 29, 2016 | Permit id: 0 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Approved | Expiration date: April 1, 2018 | Permit id: 0 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Approved | Expiration date: October 27, 2017 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Bciv activities related to the wharf project- site civil work at the "fish market" intersection to include construction of median, ada curb ramps, gutters, sidewalks, cross walks, and roadway Contractor: Pn Hoffman Permit status: Cancel/withdrawn | Expiration date: November 30, 2015 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Over head work; streetlight(s) installation, fixture; traffic signal installation, excavation; boring test pit (each addl) Date: September 8, 2014 Contractor: Pn Hoffman Permit type: Over head work; streetlight(s) installation, fixture; traffic signal installation, excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: June 26, 2015 | Permit id: Pa99984 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Re-furbishing of the existing cross walk across maine avenue in front of arena stage. Added signage for safer crossing. Added striping and tubular delineators for safer crossing. Designated tour bus loading unloading zones. Contractor: Pn Hoffman Permit status: Cancel/withdrawn | Expiration date: April 15, 2015 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Construction of new roadways and three street light intersections related to the wharf project- items for ddot public space committee Contractor: Pn Hoffman Permit status: Approved (pending payment | Expiration date: October 31, 2017 | Permit id: 0 | |||||
SCORE 98 Date: June 19, 2015 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: December 21, 2015 | Permit id: Pa10194193 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Not paid | Expiration date: August 23, 2016 | Permit id: 0 | |||||
SCORE 98 Date: April 14, 2016 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: October 8, 2016 | Permit id: Pa10236743 | |||||
SCORE 98 Date: November 2, 2016 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: December 10, 2016 | Permit id: Pa10350448 | |||||
SCORE 98 Date: September 14, 2016 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: September 17, 2016 | Permit id: Pa10335338 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Withdrawn | Expiration date: November 29, 2016 | Permit id: 0 | |||||
SCORE 98 Date: December 1, 2016 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: June 12, 2017 | Permit id: Pa10357344 | |||||
SCORE 98 Date: April 28, 2017 Contractor: Pn Hoffman Permit status: Permit expired | Expiration date: October 3, 2017 | Permit id: Pa10236743-R2 | |||||
SCORE 98 Date: June 16, 2017 Contractor: Pn Hoffman Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa10413907 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Approved (pending payment | Expiration date: October 27, 2017 | Permit id: 0 | |||||
SCORE 98 Contractor: Pn Hoffman Permit status: Approved (pending payment | Expiration date: April 1, 2018 | Permit id: 0 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Street scape improvements related to wharf project for public space committee submittal Date: September 8, 2014 Contractor: Pn Hoffman Client: Pn Hoffman | Permit type: Over head work; stre | Permit id: Pa99984 | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Bciv activities related to the wharf project- site civil work at the "fish market" intersection to include construction of median, ada curb ramps, gutters, sidewalks, cross walks, and roadway Client: Pn Hoffman | Permit type: Paving; ada curb ram | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Re-furbishing of the existing cross walk across maine avenue in front of arena stage. Added signage for safer crossing. Added striping and tubular delineators for safer crossing. Designated tour bus loading/unloading zones. Client: Pn Hoffman | Permit type: Bus stop service; co | |||||
SCORE 98 8 Maine Avenue Sw Washington Dc Street scape improvements related to wharf project for public space committee submittal Date: June 26, 2015 Contractor: Pn Hoffman Client: Pn Hoffman | Permit type: Over head work; stre | Permit id: Pa99984-R1 | |||||
SCORE 98 11 Maine Avenue Sw Washington Dc This is a modification to a driveway that has already been approved and installed by the public space committee. Client: Pn Hoffman | Permit type: Paving; driveway(s) |