Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 ![]() ![]() Applicant: Fischer Jay | Permit status: Permisud | Permit id: 0204110001 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 12000-00576: deferred submittal for metal shelving ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00530 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 12000-00576: exterior revisions to courtyard plaza, interior ceiling and roofing material from stainless steel to metal roof ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00337 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 12000-00576: deferred submittal for cold formed framing ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00309 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 (ref permit #12-576) delta 7 revsions: exterior stone wall panel thickness changed from 3" to 2 cm, lighting revisions with t-24 changes, revised storage rack layout in back room, structural revsions: added bracing for suspended ceiling logo sign, reduced spacing of roof purlins. ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00074 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 Revision canceled, changes included in 13rev-00074 (delta 7)after third party plan checker passed away (ref permit #12-576) revisions to sales area and back of house layout, finishes, updated glazing values. (revised plaza canopy roof system has been removed from scope of work 9-19-12). ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Void | Permit id: 12rev-00421 | |||||
SCORE 98 Applicant: Pepper Construction Patrick | Permit status: Finaled | Completion date: March 18, 2004 | Expiration date: December 9, 2002 | Permit id: 205100063 | |||||
SCORE 98 ![]() ![]() Engineer: Caldwell Architects | Applicant: Fischer Jay | Permit status: Permisud | Expiration date: October 9, 2002 | Permit id: 204110001 | |||||
SCORE 98 Applicant: Pepper Construction | Permit status: Finaled | Completion date: March 18, 2004 | Expiration date: January 18, 2003 | Permit id: 207220068 | |||||
SCORE 98 Applicant: Pepper Construction | Permit status: Finaled | Completion date: March 18, 2004 | Expiration date: January 18, 2003 | Permit id: 207220069 | |||||
SCORE 98 Applicant: Pepper Construction Patrick | Permit status: Finaled | Completion date: March 18, 2004 | Expiration date: December 9, 2002 | Permit id: 205100062 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 Apple store: suites 369a, 375a, 379a: new single story retail building. Core and shell permit, ti to be submitted under a separate permit. Area of building (14,233 sf). New building is smaller than area of commercial building demolished. 06/10/2013 address assignment applied for to remove suites 369a, 370a, and 379a and create suite 379) ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00576 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 Revision canceled, no longer using elastomeric paint 12-576: suites 369a elastomeric paint coating on exterior shaft wall weather treatment. ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Void | Permit id: 12rev-00473 | |||||
SCORE 98 7 Ikea Ct, West Sacramento, Ca New retail bldg and site improvements (ikea) foundation u/ permit # 04-07-203 Permit type: General | Permit id: 04-08-256 | Parcel: 014640071000 | |||||
SCORE 98 ![]() ![]() Permit type: Utility | Permit id: Dm2010-U-4714 | Parcel: 91210830900 | |||||
SCORE 98 ![]() ![]() Permit type: Utility | Permit id: Ut2011-4765 | Parcel: 91210830600 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2011-12293 | Parcel: 91210830600 | |||||
SCORE 98 ![]() ![]() Permit type: Utility | Permit id: Ut2011-4941 | Parcel: 91210831000 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2011-12335 | Parcel: 91210831000 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2012-12346 | Parcel: 91210831000 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2012-12455 | Parcel: 91210830900 | |||||
SCORE 98 ![]() ![]() Permit type: Utility | Permit id: Dm2012-U-5219 | Parcel: 91210830600 | |||||
SCORE 98 ![]() ![]() Permit type: Utility | Permit id: Ut2013-5288 | Parcel: 91210831000 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2013-12550 | Parcel: 91210831000 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2013-12570 | Parcel: 91210830600 | |||||
SCORE 98 ![]() ![]() Permit id: Co2013-2 | Parcel: 91210830600 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2014-12639 | Parcel: 91210831000 | |||||
SCORE 98 ![]() ![]() Permit type: Utility | Permit id: Ut2014-5483 | Parcel: 91210831000 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2014-12681 | Parcel: 91210830900 | |||||
SCORE 98 Permit type: Building | Permit id: Bp2014-12684 | Parcel: 91210831000 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca Apple store: suites 369a, 375a, 379a: new single story retail building. Core and shell permit, ti to be submitted under a separate permit. Area of building (14,233 sf). New building is smaller than area of commercial building demolished. 06 10 2013 address assignment applied for to remove suites 369a, 370a, and 379a and create suite 379) ![]() ![]() Permit status: Permit issued | Permit id: 12000-00576 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca Revision canceled, no longer using elastomeric paint 12-576: suites 369a elastomeric paint coating on exterior shaft wall weather treatment. ![]() ![]() Permit status: Void | Permit id: 12rev-00473 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca Revision canceled, changes included in 13rev-00074 (delta 7)after third party plan checker passed away (ref permit #12-576) revisions to sales area and back of house layout, finishes, updated glazing values. (revised plaza canopy roof system has been removed from scope of work 9-19-12). ![]() ![]() Permit status: Void | Permit id: 12rev-00421 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca 12000-00576: deferred submittal for metal shelving ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00530 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca 12000-00576: exterior revisions to courtyard plaza, interior ceiling and roofing material from stainless steel to metal roof ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00337 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca 12000-00576: deferred submittal for cold formed framing ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00309 | |||||
SCORE 98 369a / 1 El Camino Real, Suite 369a, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-576) delta 7 revsions: exterior stone wall panel thickness changed from 3" to 2 cm, lighting revisions with t-24 changes, revised storage rack layout in back room, structural revsions: added bracing for suspended ceiling logo sign, reduced spacing of roof purlins. ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00074 | |||||
SCORE 98 ![]() ![]() Permit id: 04-08-256 | Parcel: 014640071000 | |||||
SCORE 98 7 Ikea Ct, West Sacramento, Ca San Diego Ca Ikea store. Grading, on-site, connection and encroachment permits. Includes off-site turnabout. Must maintain access to existing roadway. ![]() ![]() Permit id: 04-0871 | Parcel: 014640071000 |