Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 83 Electrical Date: April 15, 2014 Contractor: Paul Shin Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-098 | |||||
SCORE 83 Date: April 15, 2014 Contractor: Paul Shin Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-098 | |||||
SCORE 83 Date: April 15, 2014 Contractor: Paul Shin Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-098 | |||||
SCORE 83 7202 Foothill Blvd Los Angeles Ca 91042 Change of use from retail to nail salon. T. I. For nail and pedicure s Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-042 | |||||
SCORE 83 7202 Foothill Blvd Los Angeles Ca 91042 San Diego Ca Change of use from retail to nail salon. T. I. For nail and pedicure s Permit status: Cofo issued | Current use: Commercial | Permit id: 15016-10000-042 | |||||
SCORE 83 955 12th St Los Angeles Ca 90021 Change of use from warehouse to retail & install two demising walls & Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-023 | |||||
SCORE 83 955 12th St Los Angeles Ca 90021 San Diego Ca Change of use from warehouse to retail & install two demising walls & Permit status: Permit expired | Current use: Commercial | Permit id: 15016-10000-023 | |||||
SCORE 83 1007 Massachusetts Ave Ne, Washington, Dc 20002 Remove existing brick entry staircase and landing. Remove existing metal handrail and railing. Install historically accurate and approved metal staircase. Install historically accurate metal handrail and railing. Paint all new metalwork glossy black. Date: April 26, 2013 Contractor: Paul Shin Client: Paul Shin | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1213661 | |||||
SCORE 83 1007 Massachusetts Ave Ne, Washington, Dc 20002 Interior renovation to single family. Remove basement rental unit. Work includes removal of kitchen, various partitions, bathroom fixtures, and finishes. Remove flooring structure on frist floor for staircase install new staricase, handrail, and balustrade connecting basement and first floor. Install new millwork, storage, ans bar area in basement. Install new bathroom fixtures and finishes. Date: April 26, 2013 Contractor: Paul Shin Client: Paul Shin | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1213660 |