Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 69 44 H Street Se Washington Dc Work to include construction of a new concrete curb cut and delivery area on hilltop terrace. A new bioretention system will treat stormwater of this new area, and discharge into a dcwater manhole on hilltop terrace (trench excavation work to be under separate permit). On h, street se an existing driveway entrance will be extended from 15 to 22. We will need to go before the public space committee scheduled for june 22 to explain our approach for this school before they open up in the fall of 2017. Contractor: Patrick Cruz Permit status: Assigned | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 69 Contractor: Patrick Cruz Permit status: Rejected | Expiration date: November 20, 2017 | Permit id: 0 | |||||
SCORE 69 44 H Street Se Washington Dc Work to include construction of a new concrete curb cut and delivery area on hilltop terrace and driveway on h st se. Date: July 10, 2017 Contractor: Patrick Cruz Permit status: Permit expired | Expiration date: October 4, 2017 | Permit id: Pa204055 | |||||
SCORE 69 Date: April 7, 2017 Contractor: Patrick Cruz Permit status: Permit expired | Expiration date: July 31, 2017 | Permit id: Pa10393120 | |||||
SCORE 69 Date: March 16, 2017 Contractor: Patrick Cruz Permit status: Not paid | Expiration date: April 30, 2017 | Permit id: Pa10380283 | |||||
SCORE 69 Contractor: Patrick Cruz Permit status: Rejected | Expiration date: November 20, 2017 | Permit id: 0 |