Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 75 Client: Pacific Gas And Electric Co | Permit status: B-4. Complete, e-4. Compl | Parcel: 25944080 | |||||
SCORE 75 Date: November 26, 2013 Contractor: Paradigm General Contractors | |||||
SCORE 75 Client: Kbsiii Almaden Financial Plaza Llc | Permit status: B-4. Complete, e-4. Compl | Parcel: 25939113 | |||||
SCORE 75 345 Hamilton Av, Palo Alto, Ca 94301 Ti existing tenant at&t to a portion of 3rd floor interior work only (5,8 sf), upgrade the bathroom to comply. Replacing boiler in the basement (85k btu) Permit type: Project - building permit | Permit status: Finaled | Permit id: 16000-02511 | |||||
SCORE 75 345 Hamilton Av, Palo Alto, Ca 94301 16000-02511: revision to meet accessibility requirements: revising door hardware, restroom stall door swing, additional accessibile signage, adding seismic clips for ceiling tiles, replace ceiling tile in the breakroom Date: December 23, 2016 Contractor: Paradigm General Contractors Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00799 | |||||
SCORE 75 345 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Ti existing tenant at&t to a portion of 3rd floor interior work only (5,8 sf), upgrade the bathroom to comply. Replacing boiler in the basement (85k btu) Permit status: Finaled | Permit id: 16000-02511 | |||||
SCORE 75 Client: Pacific Gas And Electric Co | Permit status: B-4. Complete, e-4. Compl | Parcel: 25944080 |