Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 2 Devon Pl Boulder Co Interior remodel of approximately 2 sf to include the reconfiguration of interior walls to create an updated master suite, updated kitchen area (relocate appliances,add gas line, sink to remain existing location), add a half-bathroom and additional sink at full bathroom. Modify hydronic heat system for new layout, replace exterior windows. Upgrade service panel to 2 amps. Owner-contractor. Applicant: Pam And Nate Zola | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 3, 2013 | Current use: Single family d |