Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 60 59 Longbow Dr Boulder Co Installation of ~5 lf of new 5foot detached sidewalk. New sidewalk to maintain at least 8foot landscaping strip and connect to existing sidewalk at the east and west ends. ![]() ![]() Client: Inc Valleylab | Applicant: Painless Efforts, Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 60 ![]() ![]() Client: Broadway 1335.0 | Applicant: Painless Efforts, Llc | Permit type: Right-of-way | Permit status: Iss |