Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 13000-03084: revised the grading and drainage plan to show additional drainage Date: January 9, 2015 Contractor: Owens Construction Company Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00010 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 New detached accessory structure (563 sf) includes two plumbing fixtures and an unconditioned bonus room Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03085 | |||||
SCORE 89 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03084 | |||||
SCORE 89 Date: January 23, 2014 Contractor: Owens Construction Company Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00200 | |||||
SCORE 89 Date: April 15, 2013 Contractor: Owens Construction Company Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00232 | |||||
SCORE 89 1219 Pitman Av, Palo Alto, Ca 94301 Replace plumbing fixtures, tile and counters in 3. 5 baths, two hot mop showers (one in master bath, one in upstairs bath), replace 2 water heaters with one water heater in existing hallway closet, replace one furnace in crawl space in entry hallway. Change out outlets, switches and can lights throughout house (3451 sq ft) Date: March 5, 2013 Contractor: Owens Construction Company Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00609 | |||||
SCORE 89 1437 Dana Av, Palo Alto, Ca 94301 Rewire approx half the home (all previous remodels did rewiring in those locations) to replace knob and tube wiring. Replace (e) 1 amp sub panel in the same location -exterior ne corner. Replace two furnaces in the same location (basement, attic) Date: August 16, 2012 Contractor: Owens Construction Company Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02033 | |||||
SCORE 89 3443 Ashton Ct, Palo Alto, Ca 94306 Residential single story remodel; at the family room: remove three clear story windows , replace wall heater, two new skylights, replace 4 windows with same size and type, add insulation at the walls and ceiling. New lighting and electrical throughout the family room and bathroom. At the bathroom: retile the shower and floor and replace all fixtures Date: June 22, 2012 Contractor: Owens Construction Company Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01482 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 13000-03084: add an additional a/c unit outside the dining room Date: October 27, 2014 Contractor: Owens Construction Company Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00650 | |||||
SCORE 89 Date: May 23, 2013 Contractor: Owens Construction Company Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01396 | |||||
SCORE 89 281 Iris Wy, Palo Alto, Ca 94303 Replace five (5) windows with the same size and type. Add twelve (12) recessed lights in the living room. 11/26/12 revision: remodel hall bathroom Date: October 3, 2012 Contractor: Owens Construction Company Permit type: Project - building permit | Permit status: Bld - approved | Permit id: 12000-02481 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 13000-03085: expand accessory structure from 563 sf to 717 sf; associated changes to structural details, windows/doors, electrical and mechanical work Date: April 11, 2014 Contractor: Owens Construction Company Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00209 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 San Diego Ca 13000-03084: revised the grading and drainage plan to show additional drainage Date: January 9, 2015 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 15rev-00010 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 San Diego Ca 13000-03084: add an additional a c unit outside the dining room Date: October 27, 2014 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 14rev-00650 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 San Diego Ca 13000-03085: expand accessory structure from 563 sf to 717 sf; associated changes to structural details, windows doors, electrical and mechanical work Date: April 11, 2014 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 14rev-00209 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 San Diego Ca New detached accessory structure (563 sf) includes two plumbing fixtures and an unconditioned bonus room Permit status: Permit issued | Permit id: 13000-03085 | |||||
SCORE 89 20 Waverley St, Palo Alto, Ca 94301 San Diego Ca Replace main panel (2 amp) and subpanel. Same size and locations Date: January 23, 2014 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 14000-00200 | |||||
SCORE 89 Date: May 23, 2013 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 13000-01396 | |||||
SCORE 89 281 Iris Wy, Palo Alto, Ca 94303 San Diego Ca 12-2841: change window to exterior door and add skylight. Date: April 15, 2013 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 13rev-00232 | |||||
SCORE 89 1219 Pitman Av, Palo Alto, Ca 94301 San Diego Ca Replace plumbing fixtures, tile and counters in 3. 5 baths, two hot mop showers (one in master bath, one in upstairs bath), replace 2 water heaters with one water heater in existing hallway closet, replace one furnace in crawl space in entry hallway. Change out outlets, switches and can lights throughout house (3451 sq ft) Date: March 5, 2013 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 13000-00609 | |||||
SCORE 89 281 Iris Wy, Palo Alto, Ca 94303 San Diego Ca Replace five (5) windows with the same size and type. Add twelve (12) recessed lights in the living room. 11 26 12 revision: remodel hall bathroom Date: October 3, 2012 Contractor: Owens Construction Company Permit status: Bld - approved | Permit id: 12000-02481 | |||||
SCORE 89 1437 Dana Av, Palo Alto, Ca 94301 San Diego Ca Rewire approx half the home (all previous remodels did rewiring in those locations) to replace knob and tube wiring. Replace (e) 1 amp sub panel in the same location -exterior ne corner. Replace two furnaces in the same location (basement, attic) Date: August 16, 2012 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 12000-02033 | |||||
SCORE 89 3443 Ashton Ct, Palo Alto, Ca 94306 San Diego Ca Residential single story remodel; at the family room: remove three clear story windows , replace wall heater, two new skylights, replace 4 windows with same size and type, add insulation at the walls and ceiling. New lighting and electrical throughout the family room and bathroom. At the bathroom: retile the shower and floor and replace all fixtures Date: June 22, 2012 Contractor: Owens Construction Company Permit status: Permit issued | Permit id: 12000-01482 | |||||
SCORE 89 566 Hawthorne Av, Palo Alto, Ca 94301 San Diego Ca Single story addition (748 sf) and remodel (1321 sf) Permit status: Permit issued | Permit id: 13000-03084 |