Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 24 East Capitol St Ne, Washington, Dc 20003 Perform 4 shallow borings at rfk stadium parking lot for the art high voltage duct bank to determine the the total depth of pavement and road bed using hollow stem auger method with a 6 inch diameter to a depth of feet. Date: September 18, 2012 Contractor: Nps Dc Clean Rivers Project Client: Nps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200461 | |||||
SCORE 59 24 East Capitol St Se, Washington, Dc 20003 Perform 8 seismic cone penetrometer tests to determine the geotechnical engineering properties of soils and to delineate soil stratigraphy. Date: June 26, 2012 Contractor: Nps Dc Clean Rivers Project Client: Nps | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200363 |