Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 172 176 Battery St, Burlington, Vt 05401 Bed electrical upgrade for existing power supply / overhead lighting location ; battery st from king st to main st ( east side ) phase 2 Date: July 27, 2010 Contractor: Northline Utilities Permit type: Excavation permit | Permit status: Two year warranty period | Permit id: 10-123335 | Parcel: 0491094000 | |||||
SCORE 61 23 King St, Burlington, Vt 05401 Bed electrical upgrade for existing power supply / overhead lighting location; kingst & battery st to king st & so. Champlain st Date: June 30, 2010 Contractor: Northline Utilities Permit type: Excavation permit | Permit status: Two year warranty period | Permit id: 10-122430 | Parcel: 0491069000 | |||||
SCORE 61 180 188 Battery St, Burlington, Vt 05401 Bed electrical upgrade for existing power supply / overhead lighting location; battery & maple to battery & main st. Date: June 30, 2010 Contractor: Northline Utilities Permit type: Excavation permit | Permit status: Two year warranty period | Permit id: 10-122426 | Parcel: 0491070000 |