SCORE 96 Date: August 18, 2006 Contractor: Northern Colorado Air Inc Client: Peter Dietze | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 18, 2006 Contractor: Northern Colorado Air Inc Client: Joel Eisenberg,Ruth Estate | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 27, 2005 Contractor: Northern Colorado Air Inc Client: William Wesley | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: July 26, 2006 Contractor: Northern Colorado Air Inc Client: L Mcbride,Karen Mcbride | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: November 29, 2006 | Current use: Single family d | |||||
SCORE 96 Date: June 27, 2006 Contractor: Northern Colorado Air Inc Client: Christophe Phillips,Erin Phillips | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 13, 2006 Contractor: Northern Colorado Air Inc Client: Karl Pendergast,Lisa Pendergast | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 30, 2006 | Current use: Single family d | |||||
SCORE 96 Date: July 8, 2005 Contractor: Northern Colorado Air Inc Client: Eric Harker,Amy Harker | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 21, 2003 Contractor: Northern Colorado Air Inc Client: Robert Watson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2003 | Current use: Manufactured/mo | |||||
SCORE 96 Date: February 21, 2003 Contractor: Northern Colorado Air Inc Client: William Hough,Julie Hough | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 20, 2006 Contractor: Northern Colorado Air Inc Client: County Boulder | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 2, 2006 | Current use: Single family d | |||||
SCORE 96 5836 Orchard Creek Ln Boulder Co Install new air conditioner, with associated electrical work, for single-family residence. Date: April 21, 2003 Contractor: Northern Colorado Air Inc Client: Gerald Grammens,Mary Webber | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 2, 2003 | Current use: Single family d | |||||
SCORE 96 Date: May 16, 2005 Contractor: Northern Colorado Air Inc Client: Diane Hill | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 20, 2005 Contractor: Northern Colorado Air Inc Client: Elizabeth Noyes | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2008 | Current use: Townhomes, exis | |||||
SCORE 96 Date: November 29, 2005 Contractor: Northern Colorado Air Inc Client: Gazella Bensreiti | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 25, 2005 Contractor: Northern Colorado Air Inc Client: William Sweezy, Sweezy | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 9, 2006 | Current use: Single family d | |||||
SCORE 96 Date: December 1, 2005 Contractor: Northern Colorado Air Inc Client: Jane Houssiere,Ernest Houssiere | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 1, 2005 Contractor: Northern Colorado Air Inc Client: Sandra Smith | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 21, 2005 | Current use: Single family d | |||||
SCORE 96 22 Howard Pl Boulder Co Mechanical permit to replace a forced air furnace and install a comfort cooling system. Date: December 1, 2005 Contractor: Northern Colorado Air Inc Client: Danelle Disterhoft,Patrick Disterhoft | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 3255 15th St Boulder Co Mechanical permit to replace a forced air furnace and install a comfort cooling system Date: September 22, 2005 Contractor: Northern Colorado Air Inc Client: William Anderson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 10, 2005 | Current use: Single family d | |||||
SCORE 96 Date: June 6, 2005 Contractor: Northern Colorado Air Inc Client: Randy Hall,Lucinda Hall | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 6, 2005 Contractor: Northern Colorado Air Inc Client: Sonthara Heng, Heng | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 11, 2005 | Current use: Single family d | |||||
SCORE 96 3535 Martin Dr Boulder Co Replace forced air furnace and hot water heater, and install new air conditioner for single-family residence. Date: April 6, 2005 Contractor: Northern Colorado Air Inc Client: Carol Baker | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Single family d | |||||
SCORE 96 Date: April 1, 2005 Contractor: Northern Colorado Air Inc Client: George Lichter | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 11, 2001 Contractor: Northern Colorado Air Inc Client: Steven Wolhandler | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: July 20, 2001 | Current use: Single family d | |||||
SCORE 96 Date: July 11, 2001 Contractor: Northern Colorado Air Inc Client: Larry Ward | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 10, 2001 | Current use: Single family d | |||||
SCORE 96 Date: January 20, 2005 Contractor: Northern Colorado Air Inc Client: Steven Harrison,Jennifer Harrison | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: July 7, 2000 Contractor: Northern Colorado Air Inc Client: Claire Broline | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 28, 2004 Contractor: Northern Colorado Air Inc Client: Robert Bordasch | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 15, 2004 Contractor: Northern Colorado Air Inc Client: Garth Lucero,Nancy Lucero | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 30, 2004 Contractor: Northern Colorado Air Inc Client: Ronald Calvert,Nancy Calvert | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 20, 2004 | Current use: Single family d | |||||
SCORE 96 Date: April 28, 2004 Contractor: Northern Colorado Air Inc Client: Theodore Fahrenholtz,Joan Fahrenholtz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: April 12, 2004 Contractor: Northern Colorado Air Inc Client: Dan Arrowood | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family a | |||||
SCORE 96 Date: April 1, 2004 Contractor: Northern Colorado Air Inc Client: Geoffrey Barry,Carla Barry | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 2, 2004 Contractor: Northern Colorado Air Inc Client: Kenneth Hess | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 15, 2004 Contractor: Northern Colorado Air Inc Client: Jeffrey Wheeler,Signe Wheeler | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 2805 Broadway Boulder Co Replacing two forced air furnaces and adding ac to both. Installing new start from scratch. Ac system. This work is in the north end of building in the basement. Date: December 28, 2004 Contractor: Northern Colorado Air Inc Client: Genesis Co | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 4, 2005 | Current use: Office - profes | |||||
SCORE 96 Date: December 8, 2004 Contractor: Northern Colorado Air Inc Client: Randy Hall,Lucinda Hall | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 18, 2004 Contractor: Northern Colorado Air Inc Client: David Foley,Lynne Foley | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 13, 2004 | Current use: Single family d | |||||
SCORE 96 Date: November 16, 2004 Contractor: Northern Colorado Air Inc Client: Art Zirger,Mary Zirger | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 27, 2005 | Current use: Single family d | |||||
SCORE 96 Date: November 10, 2004 Contractor: Northern Colorado Air Inc Client: Louis Owen,Janice Owen | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: November 9, 2004 Contractor: Northern Colorado Air Inc Client: Patricia Doerfler | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: September 21, 2004 Contractor: Northern Colorado Air Inc Client: Sylvester Zeren | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 19, 2004 | Current use: Single family d | |||||
SCORE 96 Date: August 25, 2004 Contractor: Northern Colorado Air Inc Client: Berniece Granger | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: August 13, 2004 Contractor: Northern Colorado Air Inc Client: Scott Stoltz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: July 2, 2004 Contractor: Northern Colorado Air Inc Client: Vondell Martin | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 96 Date: June 14, 2004 Contractor: Northern Colorado Air Inc Client: Garth Lucero,Nancy Lucero | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 27, 2004 Contractor: Northern Colorado Air Inc Client: Peter Adler, Adler | Applicant: Northern Colorado Air Inc | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 25, 2004 Contractor: Northern Colorado Air Inc Client: Val Oday,Kathryn Oday | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Single family d | |||||
SCORE 96 Date: May 24, 2004 Contractor: Northern Colorado Air Inc Client: Stephen Mcintosh | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 14, 2004 Contractor: Northern Colorado Air Inc Client: Michael Gurrola,Andria Bronsten | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 23, 2004 | Current use: Single family d | |||||
SCORE 96 21 Hillsdale Cr Boulder Co Mechanical permit to replace a forced air furnace and comfort cooling system Date: May 14, 2004 Contractor: Northern Colorado Air Inc Client: Bonnie Spyers-Duran,Paul Spyers-Duran | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 9, 2004 | Current use: Single family d | |||||
SCORE 96 Date: October 7, 2004 Contractor: Northern Colorado Air Inc Client: Mary Dunn | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Single family d | |||||
SCORE 96 Date: March 4, 2004 Contractor: Northern Colorado Air Inc Client: Lynne Barnett,Steven Barnett | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 26, 2004 Contractor: Northern Colorado Air Inc Client: Julie Levine | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 24, 2004 Contractor: Northern Colorado Air Inc Client: Place Oakhill | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 8, 2004 | Current use: Single family d | |||||
SCORE 96 Date: February 18, 2004 Contractor: Northern Colorado Air Inc Client: Stephanie Trusz,Dismas Trusz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 26, 2004 | Current use: Single family d | |||||
SCORE 96 Date: February 11, 2004 Contractor: Northern Colorado Air Inc Client: Steven Barnett,Lynne Barnett | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 28, 2004 Contractor: Northern Colorado Air Inc Client: John Carlson,Sarah Krakoff | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 28, 2004 Contractor: Northern Colorado Air Inc Client: Charles Rastle,Jane Rastle | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 11, 2004 Contractor: Northern Colorado Air Inc Client: Kimberly Bickel,Michael Bickel | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 14, 2004 | Current use: Single family d | |||||
SCORE 96 Date: September 22, 2003 Contractor: Northern Colorado Air Inc Client: Richard Cantwell,Patricia Cantwell | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: September 15, 2003 Contractor: Northern Colorado Air Inc Client: Jeffrey Lee,Mary Lee | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 38 Barr Ct Boulder Co Replace forced air furnace with a 110,0 btu unit, water heater, and comfort cooling with a 2. 5 ton unit. Date: February 18, 2004 Contractor: Northern Colorado Air Inc Client: Allan Keesling,Donna Keesling | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 8, 2003 Contractor: Northern Colorado Air Inc Client: Clarence Meyer,Carole Meyer | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Single family d | |||||
SCORE 96 1765 Sunset Bl Boulder Co Replace forced air furnace with 90,0 btu unit, new 2. 5 ton comfort cooling unit. Date: December 5, 2003 Contractor: Northern Colorado Air Inc Client: J Rush | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 25, 2004 | Current use: Single family d | |||||
SCORE 96 Date: October 7, 2004 Contractor: Northern Colorado Air Inc Client: Theodore Fahrenholtz,Joan Fahrenholtz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 10, 2005 | Current use: Multifamily dwe | |||||
SCORE 96 9 10th St Boulder Co Replacer forced air furnace and water heater in basement. New water heater is gallons, new furnace is a 100,0 btu, 90% two stage unit. Date: October 24, 2003 Contractor: Northern Colorado Air Inc Client: Mark Kovach, Kovach | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 12, 2004 | Current use: Single family d | |||||
SCORE 96 Date: October 23, 2003 Contractor: Northern Colorado Air Inc Client: Stephen Mcintosh | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2003 | Current use: Single family d | |||||
SCORE 96 Date: October 21, 2003 Contractor: Northern Colorado Air Inc Client: Deborah Bell | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Multifamily dwe | |||||
SCORE 96 4965 Ricara Dr Boulder Co Installation of a forced air furnace (70k btu) and an a. C. Unit (2. 5 ton). Date: October 1, 2003 Contractor: Northern Colorado Air Inc Client: Karen Cheek, Delong | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 22, 2003 Contractor: Northern Colorado Air Inc Client: Paul Wallace | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 22, 2003 Contractor: Northern Colorado Air Inc Client: Woodrow Hipsher,Patricia Hipsher | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 16, 2003 Contractor: Northern Colorado Air Inc Client: Jan Sires, Sires | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 6, 2006 Contractor: Northern Colorado Air Inc Client: Lisa Bechard | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 26, 2006 | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2001 Contractor: Northern Colorado Air Inc Client: James Johnson,Jean Johnson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2001 | Current use: Single family d | |||||
SCORE 96 1487 Kennedy Ct Boulder Co Installation of a forced air furnace (110k btu) and a 3. 5 ton air conditioning unit. Date: July 30, 2003 Contractor: Northern Colorado Air Inc Client: Wen Lee,Hsiu Hsu Lee | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: January 7, 2004 | Current use: Single family d | |||||
SCORE 96 2099 Norwood Av Boulder Co Mechanical permit to install evaporative cooler. Electrical by separate permit. Date: July 15, 2003 Contractor: Northern Colorado Air Inc Client: Christophe Petersen,Jana Petersen | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 11, 2003 Contractor: Northern Colorado Air Inc Client: Timothy Mcosker | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 9, 2003 Contractor: Northern Colorado Air Inc Client: Family Saltsman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 28, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 Date: July 8, 2003 Contractor: Northern Colorado Air Inc Client: Warren Bocim,Susan Bocim | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 8, 2003 | Current use: Single family d | |||||
SCORE 96 Date: July 8, 2003 Contractor: Northern Colorado Air Inc Client: Val Oday,Kathryn Oday | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 21, 2003 | Current use: Single family d | |||||
SCORE 96 Date: June 26, 2003 Contractor: Northern Colorado Air Inc Client: Family Woodall | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 17, 2003 | Current use: Single family d | |||||
SCORE 96 Date: June 23, 2003 Contractor: Northern Colorado Air Inc Client: Service Mp | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 1, 2003 | Current use: Single family d | |||||
SCORE 96 31 Gatling Ln Boulder Co Replace forced air furnace with 70,0 btu unit. New 2. 5 ton comfort cooling unit using existing electrical. Date: June 23, 2003 Contractor: Northern Colorado Air Inc Client: Dawn King,Ian King | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 13, 2003 | Current use: Single family d | |||||
SCORE 96 Date: June 6, 2003 Contractor: Northern Colorado Air Inc Client: Debra Kuresman | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 30, 2003 | Current use: Single family d | |||||
SCORE 96 Date: May 14, 2003 Contractor: Northern Colorado Air Inc Client: Heidi Wagner | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 16, 2003 | Current use: Single family d | |||||
SCORE 96 Date: May 12, 2003 Contractor: Northern Colorado Air Inc Client: William Hughes | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 6, 2003 | Current use: Single family d | |||||
SCORE 96 Date: May 8, 2003 Contractor: Northern Colorado Air Inc Client: Williams Donaldson | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 709 Baseline Rd Boulder Co Install 2 new air conditioners 3 ton and a 1. 5 ton unit for single-family residence. Date: May 8, 2003 Contractor: Northern Colorado Air Inc Client: Michelle Theall,Amy Thompson | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 22, 2003 | Current use: Single family d | |||||
SCORE 96 Date: May 8, 2003 Contractor: Northern Colorado Air Inc Client: Mile Four | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 5, 2003 Contractor: Northern Colorado Air Inc Client: Kathleen Tierney,Peter Tierney | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Single family d | |||||
SCORE 96 Date: April 3, 2003 Contractor: Northern Colorado Air Inc Client: Michael Kearney, Kearney | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2004 | Current use: Single family d | |||||
SCORE 96 Date: March 27, 2003 Contractor: Northern Colorado Air Inc Client: Joseph Priestley,Sandra Priestley | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 2, 2003 | Current use: Single family d | |||||
SCORE 96 Date: March 27, 2003 Contractor: Northern Colorado Air Inc Client: Thomas St | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 1129 Monroe Dr A Boulder Co Mechanical permit to replace a water heater, forced air furnace and comfort cooling system Date: December 29, 2004 Contractor: Northern Colorado Air Inc Client: Pilmanis Squires | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 21, 2003 Contractor: Northern Colorado Air Inc Client: Storz,Johannes Storz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 9, 2003 Contractor: Northern Colorado Air Inc Client: Robert Amend,Carol Chazdon | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 6, 2003 | Current use: Single family d | |||||
SCORE 96 Date: January 30, 2003 Contractor: Northern Colorado Air Inc Client: Jeffrey Johnson,Adrienne Johnson | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: April 4, 2003 | Current use: Single family d | |||||
SCORE 96 Date: December 4, 2002 Contractor: Northern Colorado Air Inc Client: Myra Culver | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 4, 2002 Contractor: Northern Colorado Air Inc Client: Helen Relford | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 16, 2002 | Current use: Single family d | |||||
SCORE 96 Date: December 10, 2002 Contractor: Northern Colorado Air Inc Client: Karen Dirks | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 13, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 Date: November 5, 2002 Contractor: Northern Colorado Air Inc Client: Familly Riddle | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 19, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 25 Yarrow Ct Boulder Co Installation of a forced air furnace (90k btu) at an existing single-family residence. Date: November 5, 2002 Contractor: Northern Colorado Air Inc Client: Kent Hutchison,Angela Hutchison | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 19, 2002 | Current use: Single family d | |||||
SCORE 96 Date: October 31, 2002 Contractor: Northern Colorado Air Inc Client: Anthony Riddle,Dorothy Riddle | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 13, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 3535 Silver Plume Ct Boulder Co Installation of a forced air furnace (75k btu) and comfort cooling (2. 5 ton a. C.). New gas service line. Date: October 18, 2002 Contractor: Northern Colorado Air Inc Client: Jane Adams | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 4, 2002 Contractor: Northern Colorado Air Inc Client: Jill Berry | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 19, 2003 Contractor: Northern Colorado Air Inc Client: Harold Baynton, Baynton | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 26, 2003 | Current use: Single family d | |||||
SCORE 96 35 16th St Boulder Co Installation of a forced air furnace (90k btu) and comfort cooling (3 ton) at an existing single-family residence. Date: September 23, 2002 Contractor: Northern Colorado Air Inc Client: Cheryl Clement | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 8, 2002 | Current use: Single family d | |||||
SCORE 96 Date: June 23, 2003 Contractor: Northern Colorado Air Inc Client: Annette Kirkpatrick | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 23, 2004 | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 20, 2003 Contractor: Northern Colorado Air Inc Client: Wen Lee,Hsiu Hsu Lee | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 4, 2002 Contractor: Northern Colorado Air Inc Client: Dan Arrowood | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: March 22, 2001 Contractor: Northern Colorado Air Inc Client: Charles Mccoy,Mary Mccoy | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 3, 2008 | Current use: Single family d | |||||
SCORE 96 Date: March 22, 2001 Contractor: Northern Colorado Air Inc Client: Robert Whitley,Elizabeth Whitley | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 15, 2002 Contractor: Northern Colorado Air Inc Client: Howard Krasnoff | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 14, 2002 Contractor: Northern Colorado Air Inc Client: Dennis Gunderson,Lori Gunderson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 28 Duke Cr Boulder Co Installation of a 2. 5 ton comfort cooling system at an existing single-family residence. Date: August 6, 2002 Contractor: Northern Colorado Air Inc Client: Michael Lovick,Kathryn Lovick | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 3, 2002 | Current use: Single family d | |||||
SCORE 96 1605 Pine St Boulder Co Installation of a 3 ton comfort cooling system at an existing single-family residence. Date: July 24, 2002 Contractor: Northern Colorado Air Inc Client: Heather Ryan | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 2732 Winding Trail Pl Boulder Co Installation of comfort cooling (4 ton) at an existing single-family residence. Date: July 18, 2002 Contractor: Northern Colorado Air Inc Client: Karen Cobble,Dane Cobble | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Manhattan Dr Boulder Co Installation of comfort cooling (3 ton) at an existing single-family residence. Date: July 18, 2002 Contractor: Northern Colorado Air Inc Client: Richard Larson,Marilyn Larson | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: July 16, 2002 Contractor: Northern Colorado Air Inc Client: Rade Milijasevic,Elizabeth Milijasevic | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: July 10, 2002 Contractor: Northern Colorado Air Inc Client: Martha Manning | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 1005 Edinboro Dr Boulder Co Installation of residential comfort cooling (2. 5 ton) and a forced air furnace (70k btu) at an existing single-family residence. Date: July 2, 2002 Contractor: Northern Colorado Air Inc Client: Dallas Sieckmann | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: July 1, 2002 Contractor: Northern Colorado Air Inc Client: Roy Ostenson,Sondra Ostenson | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 30, 2008 | Current use: Single family d | |||||
SCORE 96 Date: November 26, 2001 Contractor: Northern Colorado Air Inc Client: Thomas St | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 26, 2001 Contractor: Northern Colorado Air Inc Client: Thomas St | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 20, 2002 Contractor: Northern Colorado Air Inc Client: Mike Demartino, Demartino | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 17, 2002 Contractor: Northern Colorado Air Inc Client: Congregati First | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 525 Manhattan Dr 203 Boulder Co Installation of a forced air furnace (70k btu) and comfort cooling at a multi-family residence. Date: June 7, 2002 Contractor: Northern Colorado Air Inc Client: Karen Kinnear,Carol Wernet | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: May 17, 2002 Contractor: Northern Colorado Air Inc Client: Adam Glazier | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 29, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: May 17, 2002 Contractor: Northern Colorado Air Inc Client: Hertha Kohler,John Kohler | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: January 2, 2001 Contractor: Northern Colorado Air Inc Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Townhomes, exis | |||||
SCORE 96 Date: May 2, 2002 Contractor: Northern Colorado Air Inc Client: Grace Nejman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: May 2, 2002 Contractor: Northern Colorado Air Inc Client: Llc Garbarino | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 96 Date: May 2, 2002 Contractor: Northern Colorado Air Inc Client: John Drexler,Elizabeth Drexler | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: November 26, 2002 | Current use: Single family d | |||||
SCORE 96 Date: May 2, 2002 Contractor: Northern Colorado Air Inc Client: Roger Kautz,Deverly Kautz | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 11, 2002 Contractor: Northern Colorado Air Inc Client: Charlotte Houston,Julie Houston | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 25, 2002 | Current use: Single family d | |||||
SCORE 96 Date: April 11, 2002 Contractor: Northern Colorado Air Inc Client: J Crary | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 1, 2002 Contractor: Northern Colorado Air Inc Client: Robert Radocy, H | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 2, 2008 | Current use: Single family d | |||||
SCORE 96 Date: March 22, 2002 Contractor: Northern Colorado Air Inc Client: Moeljanto Leksono,Lilis Leksono | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 25 N 47th St Boulder Co Replace forced air furnace in a retail space. Address on door may be 4734 pearl. Date: March 22, 2002 Contractor: Northern Colorado Air Inc Client: Cava Della,Louis Della Cava Jr | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 96 Date: February 19, 2002 Contractor: Northern Colorado Air Inc Client: Richard Barnes,Mary Barnes | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2002 | Current use: Single family d | |||||
SCORE 96 Date: February 19, 2002 Contractor: Northern Colorado Air Inc Client: Sandra Banks | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Townhomes, exis | |||||
SCORE 96 Date: April 1, 2002 Contractor: Northern Colorado Air Inc Client: Greg Sherwin,Christine Sherwin | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 11, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: April 1, 2002 Contractor: Northern Colorado Air Inc Client: Sean Sweet,Judith Sweet | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 14 Hawthorn Av Boulder Co Replace the forced air furnace and water heater in a single family detached dwelling. Date: January 14, 2002 Contractor: Northern Colorado Air Inc Client: Susan Morris | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 23, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 14, 2002 Contractor: Northern Colorado Air Inc Client: Santo Del,Susan Bauer | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2002 | Current use: Single family d | |||||
SCORE 96 Date: March 27, 2001 Contractor: Northern Colorado Air Inc Client: Diane Hearn | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Single family d | |||||
SCORE 96 Date: March 27, 2001 Contractor: Northern Colorado Air Inc Client: Clare Oroke,Jeffrey Oroke | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 9, 2001 Contractor: Northern Colorado Air Inc Client: Stuart Kuzminsky,Anna Jt | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 8, 2001 Contractor: Northern Colorado Air Inc Client: Thomas St | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 29, 2001 Contractor: Northern Colorado Air Inc Client: Richard Shannon,Maureen Shannon | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 4, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: October 29, 2001 Contractor: Northern Colorado Air Inc Client: Veterinary Boulder | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 96 Date: June 18, 2002 Contractor: Northern Colorado Air Inc Client: Michael Lapres,Sheri Lapres | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 4, 2002 Contractor: Northern Colorado Air Inc Client: Sandra Elias | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: March 4, 2002 Contractor: Northern Colorado Air Inc Client: Landis Parsons,Wilma Parsons | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2002 | Current use: Single family d | |||||
SCORE 96 Date: October 12, 2001 Contractor: Northern Colorado Air Inc Client: Keith Hanson,Elizabeth Hanson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 27, 2001 Contractor: Northern Colorado Air Inc Client: Kathleen Stebbins | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2002 | Current use: Single family d | |||||
SCORE 96 Date: September 27, 2001 Contractor: Northern Colorado Air Inc Client: Fred Murphy,Claudia Murphy | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 12, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 27, 2001 Contractor: Northern Colorado Air Inc Client: Margaret Johnson,Lawrence Johnson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 24, 2001 Contractor: Northern Colorado Air Inc Client: Elaine Mitchell | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: January 14, 2002 | Current use: Single family d | |||||
SCORE 96 Date: September 24, 2001 Contractor: Northern Colorado Air Inc Client: Harold Usrey,Mary Usrey | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 2, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 19, 2001 Contractor: Northern Colorado Air Inc Client: Euvaldo Valdez,Helen Valdez | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2001 | Current use: Single family a | |||||
SCORE 96 Date: September 17, 2001 Contractor: Northern Colorado Air Inc Client: Lonell Pilgrim | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 2, 2001 | Current use: Single family d | |||||
SCORE 96 Date: August 14, 2001 Contractor: Northern Colorado Air Inc Client: Hollys Arnold | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 14, 2001 Contractor: Northern Colorado Air Inc Client: Evangeline Skodje | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 8, 2001 Contractor: Northern Colorado Air Inc Client: Jack Wong | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 23, 2001 Contractor: Northern Colorado Air Inc Client: Leif Saul | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 13, 2001 Contractor: Northern Colorado Air Inc Client: Heidi Lane,Wesley Lane | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: June 20, 2001 Contractor: Northern Colorado Air Inc Client: David Yeager,Tina Yeager | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: June 20, 2001 Contractor: Northern Colorado Air Inc Client: Bruce Thompson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 16, 2001 | Current use: Multifamily dwe | |||||
SCORE 96 Date: June 13, 2000 Contractor: Northern Colorado Air Inc Client: Elroy Quenroe,Christine Quenroe | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 8, 2001 Contractor: Northern Colorado Air Inc Client: Sarah Bracksieck | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 31, 2001 Contractor: Northern Colorado Air Inc Client: Peter Michel, Michel | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 8, 2001 | Current use: Single family d | |||||
SCORE 96 Date: May 23, 2001 Contractor: Northern Colorado Air Inc Client: Spencer Keller,Barbara Keller | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 11, 2001 | Current use: Single family d | |||||
SCORE 96 Date: May 23, 2001 Contractor: Northern Colorado Air Inc Client: Peter Michel, Michel | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: August 8, 2001 | Current use: Single family d | |||||
SCORE 96 Date: May 18, 2001 Contractor: Northern Colorado Air Inc Client: Susan Green | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 105 Seminole Dr Boulder Co Add comfort cooling (ac), and rreplace forced air furnace in a single family detached residence. Date: May 18, 2001 Contractor: Northern Colorado Air Inc Client: Faith Burke | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 7, 2001 | Current use: Single family d | |||||
SCORE 96 Date: May 14, 2001 Contractor: Northern Colorado Air Inc Client: Wm Kucera,Myrna Kucera | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 8, 2001 | Current use: Single family d | |||||
SCORE 96 1035 5th St Boulder Co Installing a forced air furnace and comfort cooling system, and electric work. Date: May 1, 2001 Contractor: Northern Colorado Air Inc Client: Patricia Marin | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 1, 2001 Contractor: Northern Colorado Air Inc Client: Richard Summers | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 5, 2001 | Current use: Single family d | |||||
SCORE 96 Date: December 1, 2005 Contractor: Northern Colorado Air Inc Client: Jo Graybill | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Single family d | |||||
SCORE 96 Date: April 17, 2001 Contractor: Northern Colorado Air Inc Client: Philip Marilyn L Cohen | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: April 24, 2001 | Current use: Single family d | |||||
SCORE 96 Date: April 17, 2001 Contractor: Northern Colorado Air Inc Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 10, 2001 | Current use: Single family d | |||||
SCORE 96 Date: February 16, 2001 Contractor: Northern Colorado Air Inc Client: Kathy Carsey | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2001 | Current use: Single family a | |||||
SCORE 96 Date: January 18, 2001 Contractor: Northern Colorado Air Inc Client: Jonathan Eric | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2001 | Current use: Multifamily dwe | |||||
SCORE 96 Date: January 18, 2001 Contractor: Northern Colorado Air Inc Client: Mark Grylicki,Melissa Cohen Grylicki | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 9, 2001 Contractor: Northern Colorado Air Inc Client: Jeffrey Deshell,Elisabeth Deshell | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 9, 2001 Contractor: Northern Colorado Air Inc Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 22, 2001 | Current use: Single family d | |||||
SCORE 96 Date: December 28, 2001 Contractor: Northern Colorado Air Inc Client: Properties Jammas | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 16, 2000 Contractor: Northern Colorado Air Inc Client: Chia-Lun Hu,Hua-Ling Hu | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: November 16, 2000 Contractor: Northern Colorado Air Inc Client: Scott Dimetrosky,Karen Dimetrosky | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: October 24, 2000 Contractor: Northern Colorado Air Inc Client: Betty Hendricks | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 24, 2000 Contractor: Northern Colorado Air Inc Client: Beth Bopp,Jon Bopp | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 8, 2000 | Current use: Single family d | |||||
SCORE 96 Date: October 13, 2000 Contractor: Northern Colorado Air Inc Client: Peter Arvan,Betty Arvan | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 10, 2000 | Current use: Multifamily dwe | |||||
SCORE 96 Date: October 13, 2000 Contractor: Northern Colorado Air Inc Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 22, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 28, 2000 Contractor: Northern Colorado Air Inc Client: Beth Usrey | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 27, 2008 | Current use: Single family d | |||||
SCORE 96 Date: September 11, 2000 Contractor: Northern Colorado Air Inc Client: Elizabeth Lock | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: August 29, 2000 Contractor: Northern Colorado Air Inc Client: Xlvii Emersub | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 96 Date: August 29, 2000 Contractor: Northern Colorado Air Inc Client: Laura Vertrees | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 20, 2000 | Current use: Single family d | |||||
SCORE 96 3825 Lakebriar Dr Boulder Co Replace forced air furnace, install new comfort cooling system, gas fireplace with associated gas line piping, electrical for comfort cooling. Date: March 22, 2000 Contractor: Northern Colorado Air Inc Client: Philip Weber,Karen Weber | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 19, 2000 | Current use: Single family d | |||||
SCORE 96 Date: March 22, 2000 Contractor: Northern Colorado Air Inc Client: Robert Gordon,Ronald Gordon | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Townhomes, exis | |||||
SCORE 96 Date: July 19, 2000 Contractor: Northern Colorado Air Inc Client: Erin Seabury,Douglas Aig Seabury | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 19, 2000 Contractor: Northern Colorado Air Inc Client: Claire Broline | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 27, 2000 Contractor: Northern Colorado Air Inc Client: Pine Property Limited Pertnership | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Current use: Commercial/reta | |||||
SCORE 96 Date: June 27, 2000 Contractor: Northern Colorado Air Inc Client: Abdelhak Belkora,Janice Belkora | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: June 20, 2000 Contractor: Northern Colorado Air Inc Client: The Thistle Group Inc | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 7, 2000 | Current use: Single family d | |||||
SCORE 96 Date: June 13, 2000 Contractor: Northern Colorado Air Inc Client: William Kohler | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 8, 2000 Contractor: Northern Colorado Air Inc Client: Peter Satow,Jane Satow | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 23, 2000 Contractor: Northern Colorado Air Inc Client: Nicholas Balogh,Diana Balogh | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 3333 Oneal Py 3 Boulder Co Install comfort cooling system. Permit includes mechanical and electric work. Date: May 23, 2000 Contractor: Northern Colorado Air Inc Client: Mary Mooney | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: July 29, 2000 | Current use: Townhomes, exis | |||||
SCORE 96 Date: March 1, 2001 Contractor: Northern Colorado Air Inc Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: April 12, 2001 | Current use: Single family d | |||||
SCORE 96 Date: July 25, 2000 Contractor: Northern Colorado Air Inc Client: James Maynard,Kristan Maynard | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 8, 2002 Contractor: Northern Colorado Air Inc Client: Michael Broadfoot | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Client: Lisa Lawrence, Fahrenholtz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 30, 2000 | Current use: Single family d | |||||
SCORE 96 Client: Theodore Fahrenholtz,Joan Fahrenholtz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Single family d | |||||
SCORE 96 1315 Bear Mountain Dr D Boulder Co Mechanical permit for new comfort cooling and replacement forced-air furnace. Date: September 20, 2006 Contractor: Northern Colorado Air Inc Client: Sharon Kroner,Jeanne Kroner | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 11, 2006 Contractor: Northern Colorado Air Inc Client: Charles Rahe,Ruth Rahe | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 8, 2006 Contractor: Northern Colorado Air Inc Client: John Anderson,Gertrud Anderson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 3, 2007 | Current use: Single family d | |||||
SCORE 96 Date: June 18, 2007 Contractor: Northern Colorado Air Inc Client: Janet Watts | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 31, 2008 | Current use: Single family d | |||||
SCORE 96 Date: June 25, 2007 Contractor: Northern Colorado Air Inc Client: Karen Kozelko | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 13, 2007 Contractor: Northern Colorado Air Inc Client: Mesa Table | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 5, 2007 | Current use: Commercial/reta | |||||
SCORE 96 Date: February 8, 2007 Contractor: Northern Colorado Air Inc Client: Connie Gay | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: March 20, 2007 Contractor: Northern Colorado Air Inc Client: James Kilburn,Jacqueline Kilburn | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 14, 2010 | Current use: Single family d | |||||
SCORE 96 Date: April 19, 2007 Contractor: Northern Colorado Air Inc Client: Philip Distefano,Yvonne Distefano | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2007 | Current use: Single family a | |||||
SCORE 96 Date: June 5, 2007 Contractor: Northern Colorado Air Inc Client: Donald Fisk,Anna Fisk | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 6, 2007 | Current use: Single family a | |||||
SCORE 96 Date: June 5, 2007 Contractor: Northern Colorado Air Inc Client: Ridgley Young | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2011 | Current use: Multifamily dwe | |||||
SCORE 96 Date: June 6, 2007 Contractor: Northern Colorado Air Inc Client: John Pollak,Susan Pollak | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 16, 2007 | Current use: Single family a | |||||
SCORE 96 Date: July 20, 2007 Contractor: Northern Colorado Air Inc Client: John Chely | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: July 24, 2007 Contractor: Northern Colorado Air Inc Client: Barbara Kantor | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 24, 2007 Contractor: Northern Colorado Air Inc Client: Ann Mangold | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 7, 2008 | Current use: Single family d | |||||
SCORE 96 Date: August 7, 2007 Contractor: Northern Colorado Air Inc Client: Scott Dalgleish | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 27, 2007 | Current use: Single family d | |||||
SCORE 96 Date: August 15, 2007 Contractor: Northern Colorado Air Inc Client: Phillip Shively | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 16, 2008 | Current use: Single family d | |||||
SCORE 96 Date: August 24, 2007 Contractor: Northern Colorado Air Inc Client: Margaret Donharl,Glenn Donharl | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 26, 2007 | Current use: Single family a | |||||
SCORE 96 Date: August 29, 2007 Contractor: Northern Colorado Air Inc Client: Matthew Tomatz, Tomatz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 28, 2007 | Current use: Single family d | |||||
SCORE 96 Date: September 26, 2007 Contractor: Northern Colorado Air Inc Client: Margaret Donharl,Glenn Donharl | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 19, 2007 | Current use: Single family d | |||||
SCORE 96 Date: January 23, 2008 Contractor: Northern Colorado Air Inc Client: John Illson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2011 | Current use: Single family d | |||||
SCORE 96 Date: January 28, 2008 Contractor: Northern Colorado Air Inc Client: Edward Lau,Claudia Lau | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 25, 2008 Contractor: Northern Colorado Air Inc Client: Anne Lucke | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 25, 2008 | Current use: Single family a | |||||
SCORE 96 Date: March 26, 2008 Contractor: Northern Colorado Air Inc Client: Beth Skelley | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: April 1, 2008 Contractor: Northern Colorado Air Inc Client: Roy Ostenson,Sondra Ostenson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 21, 2008 | Current use: Single family d | |||||
SCORE 96 Date: April 18, 2008 Contractor: Northern Colorado Air Inc Client: Joan Fleming | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: April 24, 2008 Contractor: Northern Colorado Air Inc Client: Goes De,Sophia De Goes | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 19, 2008 | Current use: Single family d | |||||
SCORE 96 Date: June 24, 2008 Contractor: Northern Colorado Air Inc Client: Living Kuhner | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: July 2, 2008 Contractor: Northern Colorado Air Inc Client: Pat Mcminn | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 29, 2012 | Current use: Single family d | |||||
SCORE 96 Date: July 18, 2008 Contractor: Northern Colorado Air Inc Client: Howard Singer,B Peckler Sing | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 28, 2012 | Current use: Single family d | |||||
SCORE 96 Date: August 4, 2008 Contractor: Northern Colorado Air Inc Client: Mikhail Plam, Plam | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2008 Contractor: Northern Colorado Air Inc Client: Gerard Kelly | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: September 8, 2008 Contractor: Northern Colorado Air Inc Client: Wm Moser,Barbara Moser | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 17, 2008 | Current use: Single family d | |||||
SCORE 96 Date: September 19, 2008 Contractor: Northern Colorado Air Inc Client: Robert Miller,Rodney Pierce Jr | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Single family d | |||||
SCORE 96 Date: September 30, 2008 Contractor: Northern Colorado Air Inc Client: Holly Semanske,Jeffrey Mullikin | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 1, 2012 | Current use: Single family d | |||||
SCORE 96 Date: October 13, 2008 Contractor: Northern Colorado Air Inc Client: Diane Blum | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 14, 2009 | Current use: Single family d | |||||
SCORE 96 Date: October 23, 2008 Contractor: Northern Colorado Air Inc Client: Shelly Hartman,Jeffrey Hartman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 1, 2012 | Current use: Single family d | |||||
SCORE 96 Date: November 18, 2008 Contractor: Northern Colorado Air Inc Client: Michael Ohair | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 1, 2012 | Current use: Single family d | |||||
SCORE 96 Date: March 13, 2009 Contractor: Northern Colorado Air Inc Client: Warren Rothman, Rothman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 3531 22nd St Boulder Co Replacement water heater, replacement forced air furnace, new comfort cooling Date: June 5, 2009 Contractor: Northern Colorado Air Inc Client: David Maytubby,Rebecca Maytubby | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 19, 2009 | Current use: Single family d | |||||
SCORE 96 Date: June 12, 2009 Contractor: Northern Colorado Air Inc Client: Andrew Howard | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 25, 2009 Contractor: Northern Colorado Air Inc Client: George Laframboise | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 6, 2009 | Current use: Single family d | |||||
SCORE 96 Date: July 2, 2009 Contractor: Northern Colorado Air Inc Client: Scott Minkoff | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 22, 2009 | Current use: Single family d | |||||
SCORE 96 Date: July 31, 2009 Contractor: Northern Colorado Air Inc Client: Mildred Lasswell | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 1, 2010 | Current use: Single family d | |||||
SCORE 96 Date: September 22, 2009 Contractor: Northern Colorado Air Inc Client: Miles Brooks,Maureen Eldredge | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Single family d | |||||
SCORE 96 Date: September 30, 2009 Contractor: Northern Colorado Air Inc Client: George Garry,Mary Clifford | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 12, 2010 | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2009 Contractor: Northern Colorado Air Inc Client: David Chaknova | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 16, 2009 Contractor: Northern Colorado Air Inc Client: Sarah Harding | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 28, 2009 | Current use: Single family d | |||||
SCORE 96 Date: October 26, 2009 Contractor: Northern Colorado Air Inc Client: Laszlo Nemeth, Nemeth | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 9, 2009 Contractor: Northern Colorado Air Inc Client: Erich Bach,Margaret Bach | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2010 | Current use: Single family d | |||||
SCORE 96 Date: November 9, 2009 Contractor: Northern Colorado Air Inc Client: Daryl Carr | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2012 | Current use: Single family d | |||||
SCORE 96 Date: November 9, 2009 Contractor: Northern Colorado Air Inc Client: Thomas Gale,Kendra Gale | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 11, 2009 | Current use: Single family d | |||||
SCORE 96 Date: March 26, 2010 Contractor: Northern Colorado Air Inc Client: Dennis Zuiker,Elaine Zuiker | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 96 Date: March 26, 2010 Contractor: Northern Colorado Air Inc Client: Steve Kehoe,Paula Kehoe | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: June 1, 2010 Contractor: Northern Colorado Air Inc Client: Stephanie Swope,Matthew Swope | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: June 4, 2010 Contractor: Northern Colorado Air Inc Client: David Jones | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 16, 2010 | Current use: Single family d | |||||
SCORE 96 Date: June 28, 2010 Contractor: Northern Colorado Air Inc Client: Martha Manning | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family d | |||||
SCORE 96 Date: July 14, 2010 Contractor: Northern Colorado Air Inc Client: John Spitzer | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 96 Date: July 19, 2010 Contractor: Northern Colorado Air Inc Client: Yongmin Chen,Tianru Chen | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: August 17, 2010 Contractor: Northern Colorado Air Inc Client: Brian Jackson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 96 Date: August 30, 2010 Contractor: Northern Colorado Air Inc Client: Roy Pyle,Donna Pyle | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 30, 2010 | Current use: Single family d | |||||
SCORE 96 Date: August 30, 2010 Contractor: Northern Colorado Air Inc Client: Phillip Shively | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 96 Date: September 13, 2010 Contractor: Northern Colorado Air Inc Client: Ashley Crutchfield | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family d | |||||
SCORE 96 Date: November 1, 2010 Contractor: Northern Colorado Air Inc Client: Earl Henderson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: November 29, 2010 Contractor: Northern Colorado Air Inc Client: Bradley Queen | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Single family d | |||||
SCORE 96 Date: December 1, 2010 Contractor: Northern Colorado Air Inc Client: Matthew Seebaum | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Single family d | |||||
SCORE 96 Date: December 23, 2010 Contractor: Northern Colorado Air Inc Client: Janet Freeman,Gregory Freeman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 16, 2011 | Current use: Single family d | |||||
SCORE 96 2179 Kincaid Pl Boulder Co Electrical permit for wiring of new air conditioner installed through pmt2007-02019 Date: February 25, 2011 Contractor: Northern Colorado Air Inc Client: Barbara Kantor | Applicant: Northern Colorado Air Inc | Permit type: Electrical | Permit status: Cmp | Completion date: March 8, 2011 | Current use: Single family d | |||||
SCORE 96 Date: January 17, 2011 Contractor: Northern Colorado Air Inc Client: B Peckler Sing,Howard Singer | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 13, 2014 | Current use: Single family d | |||||
SCORE 96 Date: April 21, 2011 Contractor: Northern Colorado Air Inc Client: Dennis Hult,Marcia Hult | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: July 14, 2011 Contractor: Northern Colorado Air Inc Client: Martha Manning | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 5, 2011 | Current use: Single family d | |||||
SCORE 96 Date: September 16, 2011 Contractor: Northern Colorado Air Inc Client: Leppla,Jeffrey Leppla | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: September 27, 2011 Contractor: Northern Colorado Air Inc Client: Polly Simmons,Aaron Simmons | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: June 27, 2012 Contractor: Northern Colorado Air Inc Client: Katherine Holmes,Jeremy Yazinski | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 21, 2012 | Current use: Single family d | |||||
SCORE 96 Date: July 17, 2012 Contractor: Northern Colorado Air Inc Client: L Mcbride,Karen Mcbride | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family d | |||||
SCORE 96 2603 Juniper Av Boulder Co Replacement water heater, replacement forced air furnace, new comfort cooling Date: August 28, 2012 Contractor: Northern Colorado Air Inc Client: Daniel Abelson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 20, 2013 | Current use: Single family d | |||||
SCORE 96 Date: November 29, 2012 Contractor: Northern Colorado Air Inc Client: Christophe Yankee,Jann Yankee | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: November 29, 2012 Contractor: Northern Colorado Air Inc Client: Todd Roadman, Roadman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 8, 2014 | Current use: Single family d | |||||
SCORE 96 Date: December 28, 2012 Contractor: Northern Colorado Air Inc Client: Marie Mccreery | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 10, 2013 | Current use: Single family d | |||||
SCORE 96 4774 Franklin Dr Boulder Co Replace forced air furnace, hot water heater and air conditioner for residence. Date: January 17, 2013 Contractor: Northern Colorado Air Inc Client: Carla Abbott | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 15, 2014 | Current use: Single family d | |||||
SCORE 96 4879 Kings Ridge Bl Boulder Co Repair of 657 square foot basement. To include replacement of wall framing, mechanical systems, electrical outlets and switches and full bathroom plumbing. Client: Ann Macmurray,Shawn Ritter | Applicant: Northern Colorado Air Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 7, 2013 | Current use: Single family a | |||||
SCORE 96 4879 Kings Ridge Bl Boulder Co Replace water damaged forced air furnace with new unit. Final electrical inspection included. Date: September 24, 2013 Contractor: Northern Colorado Air Inc Client: Ann Macmurray,Shawn Ritter | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 19, 2014 | Current use: Single family d | |||||
SCORE 96 4873 Kings Ridge Bl Boulder Co Replace water damaged hot water heater and forced air furnace with new units. Final electrical inspection included. Date: September 24, 2013 Contractor: Northern Colorado Air Inc Client: Warren Rothman, Rothman | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 20, 2014 | Current use: Single family d | |||||
SCORE 96 31 25th St Boulder Co Electrical - hook up condenser, disconnect ; mechanical - replacement a c and forced-air furnace. Date: September 26, 2013 Contractor: Northern Colorado Air Inc Client: Wm Moser,Barbara Moser | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: September 26, 2013 Contractor: Northern Colorado Air Inc Client: Lisa Goodman | Applicant: Northern Colorado Air Inc | Permit type: Electrical, mechanic | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: September 27, 2013 Contractor: Northern Colorado Air Inc Client: Karen Cheek | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 1487 Kennedy Ct Boulder Co Repair of finished basement. To include replacement water heater, furnance and electrical work. Client: Wen Lee,Hsiu Hsu Lee | Applicant: Northern Colorado Air Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Single family d | |||||
SCORE 96 Date: October 2, 2013 Contractor: Northern Colorado Air Inc Client: Daniel Abelson,Deborah Abelson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 17, 2013 | Current use: Single family a | |||||
SCORE 96 Date: October 2, 2013 Contractor: Northern Colorado Air Inc Client: Jan Sires, Sires | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: October 4, 2013 Contractor: Northern Colorado Air Inc Client: Kathleen Tierney,Peter Tierney | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: October 4, 2013 Contractor: Northern Colorado Air Inc Client: Edwin Naimon,Kathleen Naimon | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2015 | Current use: Single family d | |||||
SCORE 96 Date: October 16, 2013 Contractor: Northern Colorado Air Inc Client: Polly Simmons,Aaron Simmons | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 3, 2013 | Current use: Single family d | |||||
SCORE 96 Date: October 28, 2013 Contractor: Northern Colorado Air Inc Client: Grenier Velasquez | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: December 10, 2013 Contractor: Northern Colorado Air Inc Client: Sona Dimidjian | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: August 14, 2013 Contractor: Northern Colorado Air Inc Client: Clarence Meyer,Carole Meyer | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: October 29, 2013 Contractor: Northern Colorado Air Inc Client: Sarah Harding | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: January 31, 2014 Contractor: Northern Colorado Air Inc Client: Sandra Goldstein,Jay Goldstein | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family d | |||||
SCORE 96 Date: May 9, 2014 Contractor: Northern Colorado Air Inc Client: Reuben Zylstra, Zylstra | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 13, 2014 | Current use: Single family d | |||||
SCORE 96 Date: May 20, 2014 Contractor: Northern Colorado Air Inc Client: Sona Dimidjian | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: June 10, 2014 Contractor: Northern Colorado Air Inc Client: Gregory Withers,Carol J | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 2, 2015 | Current use: Single family d | |||||
SCORE 96 Date: June 25, 2014 Contractor: Northern Colorado Air Inc Client: Nimal Gamage,Gayani Gamage | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: July 8, 2014 Contractor: Northern Colorado Air Inc Client: Laura Appleton,Victor Pizzo | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: October 14, 2014 Contractor: Northern Colorado Air Inc Client: Sharon Rouse | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: November 12, 2014 Contractor: Northern Colorado Air Inc Client: Andrew Canales,Darcie Canales | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: December 2, 2014 Contractor: Northern Colorado Air Inc Client: Thomas Jr,Elizabeth Willis | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 96 Date: January 19, 2015 Contractor: Northern Colorado Air Inc Client: George Garry | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 29, 2015 | Current use: Single family d | |||||
SCORE 96 Date: February 12, 2015 Contractor: Northern Colorado Air Inc Client: Paul Litwinetz,Susan Litwinetz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 9, 2015 | Current use: Single family d | |||||
SCORE 96 Date: February 23, 2015 Contractor: Northern Colorado Air Inc Client: Michelle Theall,Amy Thompson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 27, 2015 | Current use: Single family d | |||||
SCORE 96 Date: March 2, 2015 Contractor: Northern Colorado Air Inc Client: Ellen Headrick | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: March 5, 2015 Contractor: Northern Colorado Air Inc Client: Brent Heintz,Tiffany Heintz | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 16, 2015 | Current use: Single family d | |||||
SCORE 96 Date: May 26, 2015 Contractor: Northern Colorado Air Inc Client: John Waters,Mary Waters | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: June 3, 2015 Contractor: Northern Colorado Air Inc Client: Roger Smith,Robin Smith | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: June 23, 2015 Contractor: Northern Colorado Air Inc Client: John Spine | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family a | |||||
SCORE 96 Date: July 29, 2015 Contractor: Northern Colorado Air Inc Client: Bernard Morson,Kathleen Morson | Applicant: Northern Colorado Air Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Client: Properties Mesinger | Permit type: Mechanical | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2016-02726 | |||||
SCORE 96 3025 47th St Boulder Co Install a new comfort cooling system (mini-split) in an existing office building. Scope of work includes electrical. Client: Properties Mesinger | Permit type: Electrical, mechanical | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2016-02727 | |||||
SCORE 96 Client: Properties Mesinger | Permit type: Electrical, mechanical | Permit status: Iss | Current use: Existing | Permit id: Pmt2016-05721 | |||||
SCORE 96 Client: Carolyn Carlat | Permit type: Mechanical | Permit status: Cmp | Completion date: March 7, 2016 | Current use: Single family attached dwelling, existin | Permit id: Pmt2016-20068 | |||||
SCORE 96 Client: Julie Klingel | Permit type: Mechanical | Permit status: Cmp | Completion date: March 25, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20099 | |||||
SCORE 96 Client: Harold Pelle | Permit type: Mechanical | Permit status: Cmp | Completion date: July 11, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20190 | |||||
SCORE 96 Client: Theodore Barrett-Page | Permit type: Mechanical | Permit status: Cmp | Completion date: September 29, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20248 | |||||
SCORE 96 Client: Leann Richards | Permit type: Mechanical | Permit status: Cmp | Completion date: October 6, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20289 | |||||
SCORE 96 Client: David Corbus | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-20404 | |||||
SCORE 96 Client: Warren Rothman | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20042 | |||||
SCORE 96 3531 22nd St Boulder Co Replacement water heater, replacement forced air furnace, new comfort cooling Client: David Maytubby | Permit type: Mechanical | Permit status: Cmp | Completion date: June 19, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20095 | |||||
SCORE 96 Client: Andrew Howard | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20100 | |||||
SCORE 96 Client: George Laframboise | Permit type: Mechanical | Permit status: Cmp | Completion date: July 6, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20112 | |||||
SCORE 96 Client: Scott Minkoff | Permit type: Mechanical | Permit status: Cmp | Completion date: July 22, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20117 | |||||
SCORE 96 Client: Mildred Lasswell | Permit type: Mechanical | Permit status: Cmp | Completion date: November 1, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20141 | |||||
SCORE 96 Client: Miles Brooks | Permit type: Mechanical | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20177 | |||||
SCORE 96 Client: George Garry | Permit type: Mechanical | Permit status: Cmp | Completion date: January 12, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20185 | |||||
SCORE 96 Client: David Chaknova | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20189 | |||||
SCORE 96 Client: Sarah Harding | Permit type: Mechanical | Permit status: Cmp | Completion date: October 28, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20210 | |||||
SCORE 96 Client: Laszlo Nemeth | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20219 | |||||
SCORE 96 Client: Erich Bach | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20232 | |||||
SCORE 96 Client: Daryl Carr | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20233 | |||||
SCORE 96 Client: Thomas Gale | Permit type: Mechanical | Permit status: Cmp | Completion date: December 11, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20234 | |||||
SCORE 96 4774 Franklin Dr Boulder Co Replace forced air furnace, hot water heater and air conditioner for residence. Client: Carla Abbott | Permit type: Mechanical | Permit status: Cmp | Completion date: January 15, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-00216 | |||||
SCORE 96 4879 Kings Ridge Bl Boulder Co Replace water damaged forced air furnace with new unit. Final electrical inspection included. Client: Ann Macmurray | Permit type: Mechanical | Permit status: Cmp | Completion date: February 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04795 | |||||
SCORE 96 4873 Kings Ridge Bl Boulder Co Replace water damaged hot water heater and forced air furnace with new units. Final electrical inspection included. Client: Warren Rothman | Permit type: Mechanical | Permit status: Cmp | Completion date: February 20, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04799 | |||||
SCORE 96 31 25th St Boulder Co Electrical - hook up condenser, disconnect ; mechanical - replacement a c and forced-air furnace. Client: Wm Moser | Permit type: Electrical, mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04971 | |||||
SCORE 96 Client: Lisa Goodman | Permit type: Electrical, mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04974 | |||||
SCORE 96 Client: Karen Cheek | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05000 | |||||
SCORE 96 1487 Kennedy Ct Boulder Co Repair of finished basement. To include replacement water heater, furnance and electrical work. Client: Wen Lee | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Single family detached dwelling, repair | Permit id: Pmt2013-05012 | |||||
SCORE 96 Client: Daniel Abelson | Permit type: Mechanical | Permit status: Cmp | Completion date: December 17, 2013 | Current use: Single family attached dwelling, existin | Permit id: Pmt2013-05104 | |||||
SCORE 96 Client: Jan Sires | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05113 | |||||
SCORE 96 Client: Kathleen Tierney | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05247 | |||||
SCORE 96 Client: Edwin Naimon | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05248 | |||||
SCORE 96 Client: Polly Simmons | Permit type: Mechanical | Permit status: Cmp | Completion date: December 3, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05589 | |||||
SCORE 96 Client: Grenier Velasquez | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05957 | |||||
SCORE 96 Client: Sona Dimidjian | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-06926 | |||||
SCORE 96 Client: Clarence Meyer | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-20281 | |||||
SCORE 96 Client: Sarah Harding | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-20477 | |||||
SCORE 96 Client: Tamas & Nilza Kallos | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Townhomes, existing | Permit id: Pmt2001-00003 | |||||
SCORE 96 Client: Jeffrey Deshell | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-00103 | |||||
SCORE 96 Client: Dean & Evelyn H Dehart | Permit type: Mechanical | Permit status: Cmp | Completion date: January 22, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-00105 | |||||
SCORE 96 Client: Jonathan Eric | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-00199 | |||||
SCORE 96 Client: Mark Grylicki | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-00200 | |||||
SCORE 96 Client: Kathy Carsey | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2001 | Current use: Single family attached dwelling, existin | Permit id: Pmt2001-00542 | |||||
SCORE 96 Client: Heidi & Hugh Ohagan | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: April 12, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-00711 | |||||
SCORE 96 Client: Charles Mccoy | Permit type: Mechanical | Permit status: Cmp | Completion date: June 3, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01068 | |||||
SCORE 96 Client: Robert Whitley | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01069 | |||||
SCORE 96 Client: Diane Hearn | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01128 | |||||
SCORE 96 Client: Clare Oroke | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01129 | |||||
SCORE 96 Client: Philip Marilyn L Cohen | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: April 24, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01439 | |||||
SCORE 96 Client: Gwendolyn & Walter Harrop | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: May 10, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01441 | |||||
SCORE 96 Client: Richard Summers | Permit type: Mechanical | Permit status: Cmp | Completion date: June 5, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01675 | |||||
SCORE 96 1035 5th St Boulder Co Installing a forced air furnace and comfort cooling system, and electric work. Client: Patricia Marin | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01676 | |||||
SCORE 96 Client: Robert Hardesty | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01720 | |||||
SCORE 96 Client: Wm Kucera | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 8, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01915 | |||||
SCORE 96 105 Seminole Dr Boulder Co Add comfort cooling (ac), and rreplace forced air furnace in a single family detached residence. Client: Faith Burke | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 7, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02028 | |||||
SCORE 96 Client: Susan Green | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02029 | |||||
SCORE 96 Client: Spencer Keller | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 11, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02122 | |||||
SCORE 96 Client: Peter Michel | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: August 8, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02123 | |||||
SCORE 96 Client: Peter Michel | Permit type: Mechanical | Permit status: Cmp | Completion date: August 8, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02227 | |||||
SCORE 96 Client: Sarah Bracksieck | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02394 | |||||
SCORE 96 Client: David Yeager | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-02601 | |||||
SCORE 96 Client: Bruce Thompson | Permit type: Mechanical | Permit status: Cmp | Completion date: July 16, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-02602 | |||||
SCORE 96 Client: Steven Wolhandler | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: July 20, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02928 | |||||
SCORE 96 Client: Larry Ward | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: October 10, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02929 | |||||
SCORE 96 Client: Heidi Lane | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2001-02969 | |||||
SCORE 96 Client: Leif Saul | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-03165 | |||||
SCORE 96 Client: R Denton | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: August 17, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-03472 | |||||
SCORE 96 Client: Jack Wong | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-03473 | |||||
SCORE 96 Client: Hollys Arnold | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-03571 | |||||
SCORE 96 Client: Evangeline Skodje | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-03572 | |||||
SCORE 96 Client: Lonell Pilgrim | Permit type: Mechanical | Permit status: Cmp | Completion date: October 2, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04082 | |||||
SCORE 96 Client: Euvaldo Valdez | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2001 | Current use: Single family attached dwelling, existin | Permit id: Pmt2001-04138 | |||||
SCORE 96 Client: Harold Usrey | Permit type: Mechanical | Permit status: Cmp | Completion date: October 2, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04205 | |||||
SCORE 96 Client: Elaine Mitchell | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: January 14, 2002 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04211 | |||||
SCORE 96 Client: Fred Murphy | Permit type: Mechanical | Permit status: Cmp | Completion date: October 12, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04300 | |||||
SCORE 96 Client: Kathleen Stebbins | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2002 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04301 | |||||
SCORE 96 Client: Margaret Johnson | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04303 | |||||
SCORE 96 Client: James Johnson | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04423 | |||||
SCORE 96 Client: Keith Hanson | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04532 | |||||
SCORE 96 Client: Richard Shannon | Permit type: Mechanical | Permit status: Cmp | Completion date: March 4, 2002 | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-04775 | |||||
SCORE 96 Client: Veterinary Boulder | Permit type: Mechanical | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2001-04777 | |||||
SCORE 96 Client: Thomas St | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04932 | |||||
SCORE 96 Client: Stuart Kuzminsky | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-04957 | |||||
SCORE 96 Client: Thomas St | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-05192 | |||||
SCORE 96 Client: Thomas St | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-05193 | |||||
SCORE 96 Client: Properties Jammas | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-05593 | |||||
SCORE 96 Client: Sandra Goldstein | Permit type: Mechanical | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20053 | |||||
SCORE 96 Client: Reuben Zylstra | Permit type: Mechanical | Permit status: Cmp | Completion date: June 13, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20179 | |||||
SCORE 96 Client: Sona Dimidjian | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20193 | |||||
SCORE 96 Client: Gregory Withers | Permit type: Mechanical | Permit status: Cmp | Completion date: February 2, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20215 | |||||
SCORE 96 Client: Nimal Gamage | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20239 | |||||
SCORE 96 Client: Laura Appleton | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20251 | |||||
SCORE 96 Client: Sharon Rouse | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20373 | |||||
SCORE 96 Client: Andrew Canales | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20428 | |||||
SCORE 96 Client: Thomas Jr | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-20453 | |||||
SCORE 96 Client: Katherine Holmes | Permit type: Mechanical | Permit status: Cmp | Completion date: September 21, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-20157 | |||||
SCORE 96 Client: L Mcbride | Permit type: Mechanical | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-20191 | |||||
SCORE 96 2603 Juniper Av Boulder Co Replacement water heater, replacement forced air furnace, new comfort cooling Client: Daniel Abelson | Permit type: Mechanical | Permit status: Cmp | Completion date: February 20, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-20233 | |||||
SCORE 96 Client: Christophe Yankee | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-20356 | |||||
SCORE 96 Client: Todd Roadman | Permit type: Mechanical | Permit status: Cmp | Completion date: September 8, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-20357 | |||||
SCORE 96 Client: Marie Mccreery | Permit type: Mechanical | Permit status: Cmp | Completion date: January 10, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-20394 | |||||
SCORE 96 Client: George Lichter | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-01179 | |||||
SCORE 96 Client: Elizabeth Noyes | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2008 | Current use: Townhomes, existing | Permit id: Pmt2005-20080 | |||||
SCORE 96 Client: Diane Hill | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-20108 | |||||
SCORE 96 Client: Lynne Barnett | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-00750 | |||||
SCORE 96 Client: Peter Adler | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-02041 | |||||
SCORE 96 Client: Dennis Zuiker | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20082 | |||||
SCORE 96 Client: Steve Kehoe | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20083 | |||||
SCORE 96 Client: Stephanie Swope | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20149 | |||||
SCORE 96 Client: David Jones | Permit type: Mechanical | Permit status: Cmp | Completion date: September 16, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20152 | |||||
SCORE 96 Client: Martha Manning | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20183 | |||||
SCORE 96 Client: John Spitzer | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20196 | |||||
SCORE 96 Client: Yongmin Chen | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20202 | |||||
SCORE 96 Client: Brian Jackson | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20241 | |||||
SCORE 96 Client: Roy Pyle | Permit type: Mechanical | Permit status: Cmp | Completion date: September 30, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20254 | |||||
SCORE 96 Client: Phillip Shively | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20255 | |||||
SCORE 96 Client: Ashley Crutchfield | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20297 | |||||
SCORE 96 Client: Earl Henderson | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20384 | |||||
SCORE 96 Client: Bradley Queen | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20434 | |||||
SCORE 96 Client: Matthew Seebaum | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20440 | |||||
SCORE 96 Client: Janet Freeman | Permit type: Mechanical | Permit status: Cmp | Completion date: March 16, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20476 | |||||
SCORE 96 Client: Annette Kirkpatrick | Permit type: Mechanical | Permit status: Cmp | Completion date: June 23, 2004 | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-02458 | |||||
SCORE 96 3643 Larkwood Ct Boulder Co Convert portion of existing 3-car garage into mudroom, interior remodel of existing finished basement to install one bedroom and one 3 4 bath. Client: Terry Penttila | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 2, 2002 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2002-04843 | |||||
SCORE 96 Client: Helen Relford | Permit type: Mechanical | Permit status: Cmp | Completion date: December 16, 2002 | Current use: Single family detached dwelling, existin | Permit id: Pmt2002-05155 | |||||
SCORE 96 2179 Kincaid Pl Boulder Co Electrical permit for wiring of new air conditioner installed through pmt2007-02019 Client: Barbara Kantor | Permit type: Electrical | Permit status: Cmp | Completion date: March 8, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00782 | |||||
SCORE 96 Client: B Peckler Sing | Permit type: Mechanical | Permit status: Cmp | Completion date: March 13, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-20038 | |||||
SCORE 96 Client: Dennis Hult | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-20118 | |||||
SCORE 96 Client: Martha Manning | Permit type: Mechanical | Permit status: Cmp | Completion date: August 5, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-20201 | |||||
SCORE 96 Client: Leppla | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-20258 | |||||
SCORE 96 Client: Polly Simmons | Permit type: Mechanical | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-20267 | |||||
SCORE 96 Client: George Garry | Permit type: Mechanical | Permit status: Cmp | Completion date: April 29, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20020 | |||||
SCORE 96 Client: Paul Litwinetz | Permit type: Mechanical | Permit status: Cmp | Completion date: March 9, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20053 | |||||
SCORE 96 Client: Michelle Theall | Permit type: Mechanical | Permit status: Cmp | Completion date: February 27, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20058 | |||||
SCORE 96 Client: Ellen Headrick | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20070 | |||||
SCORE 96 Client: Brent Heintz | Permit type: Mechanical | Permit status: Cmp | Completion date: March 16, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20075 | |||||
SCORE 96 Client: John Waters | Permit type: Mechanical | Permit status: Cmp | Completion date: October 13, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20141 | |||||
SCORE 96 Client: Roger Smith | Permit type: Mechanical | Permit status: Cmp | Completion date: September 24, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20150 | |||||
SCORE 96 Client: John Spine | Permit type: Mechanical | Permit status: Iss | Current use: Single family attached dwelling, existin | Permit id: Pmt2015-20169 | |||||
SCORE 96 Client: Bernard Morson | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20208 | |||||
SCORE 96 Client: Properties Mesinger | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20369 | |||||
SCORE 96 3747 Mountain Laurel Pl Boulder Co Replacement forced air furnace. Air handler to remain. Water heating component to be replaced. Client: Mary Jordan | Permit type: Mechanical | Permit status: Cmp | Completion date: January 6, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20431 | |||||
SCORE 96 Client: Joel Eisenberg | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-03426 | |||||
SCORE 96 Client: Richard Hayward | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2017 | Current use: Single family attached dwelling, existin | Permit id: Pmt2017-20112 | |||||
SCORE 96 Client: Stephen Mcintosh | Permit type: Mechanical | Permit status: Cmp | Completion date: April 14, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-20080 | |||||
SCORE 96 Client: Theodore Fahrenholtz | Permit type: Mechanical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-00024 | |||||
SCORE 96 Client: Lisa Lawrence | Permit type: Mechanical | Permit status: Cmp | Completion date: May 30, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-00026 | |||||
SCORE 96 3825 Lakebriar Dr Boulder Co Replace forced air furnace, install new comfort cooling system, gas fireplace with associated gas line piping, electrical for comfort cooling. Client: Philip Weber | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: May 19, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-01123 | |||||
SCORE 96 Client: Robert Gordon | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Townhomes, existing | Permit id: Pmt2000-01124 | |||||
SCORE 96 3333 Oneal Py 3 Boulder Co Install comfort cooling system. Permit includes mechanical and electric work. Client: Mary Mooney | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: July 29, 2000 | Current use: Townhomes, existing | Permit id: Pmt2000-02074 | |||||
SCORE 96 Client: Nicholas Balogh | Permit type: Mechanical | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2000-02075 | |||||
SCORE 96 Client: Peter Satow | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-02336 | |||||
SCORE 96 Client: William Kohler | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-02391 | |||||
SCORE 96 Client: Elroy Quenroe | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-02392 | |||||
SCORE 96 Client: The Thistle Group Inc | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: September 7, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-02504 | |||||
SCORE 96 Client: Pine Property Limited Pertnership | Permit type: Mechanical | Permit status: Cmp | Current use: Commercial/retail, existing | Permit id: Pmt2000-02654 | |||||
SCORE 96 Client: Abdelhak Belkora | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-02655 | |||||
SCORE 96 Client: Claire Broline | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-02805 | |||||
SCORE 96 Client: Claire Broline | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03004 | |||||
SCORE 96 Client: Erin Seabury | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03013 | |||||
SCORE 96 Client: James Maynard | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03072 | |||||
SCORE 96 Client: Laura Vertrees | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: September 20, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03588 | |||||
SCORE 96 Client: Xlvii Emersub | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2000-03590 | |||||
SCORE 96 Client: Elizabeth Lock | Permit type: Mechanical | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2000-03727 | |||||
SCORE 96 Client: Beth Usrey | Permit type: Mechanical | Permit status: Cmp | Completion date: May 27, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04017 | |||||
SCORE 96 Client: Peter Arvan | Permit type: Mechanical | Permit status: Cmp | Completion date: November 10, 2000 | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-04232 | |||||
SCORE 96 Client: Amanda Wember & Devon Chapin Brown | Permit type: Mechanical | Permit status: Cmp | Completion date: March 22, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04233 | |||||
SCORE 96 Client: Beth Bopp | Permit type: Mechanical | Permit status: Cmp | Completion date: November 8, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04378 | |||||
SCORE 96 Client: Betty Hendricks | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04379 | |||||
SCORE 96 Client: Ina Nenninger | Permit type: Mechanical | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2000-04687 |