Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 6 Acker Pl Ne, Washington, Dc 20002 Interior renovation of all levels. Refinish all hardwood floors, new ceramic tile, paint and new fixtures on all bathrooms. Demo exiting closet on first level. Replace all kitchen cabinets. Add new closet space on second level bedroom. Finish existing basement and enclose laundry mechanical room. Add new bedroom in basement with new code compliant egress window. Date: June 7, 2017 Contractor: Nelson Isaac Aguilar Client: Robin Dempsey Stone | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1708663 | |||||
SCORE 59 4415 39th St Nw, Washington, Dc 20016 Remodel existing bathroom on second level and remove non-load bearing wall in existing finished basement. All work performed involves finish material. No demolition on load bearings walls or major structural changes. All work will be performed on the interior of the property. New radiant heat floor on the 2nd floor. Date: June 20, 2017 Contractor: Nelson Isaac Aguilar Client: Benjamin A Nussdorf | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1709777 |