Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Date: October 17, 2014 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: December 15, 2014 | Permit id: Pa100733 | |||||
SCORE 82 728 Park Road Nw Washington Dc Excavation to install lateral water and sewer service from public main Contractor: Nefta Vasqez Permit status: Cancel/withdrawn | Expiration date: January 13, 2015 | Permit id: 0 | |||||
SCORE 82 1855 Lamont Street Nw Washington Dc Excavation to install lateral sewer and water from public main to property line Date: February 3, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: April 9, 2015 | Permit id: Pa105309 | |||||
SCORE 82 Date: April 13, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: June 12, 2015 | Permit id: Pa107823 | |||||
SCORE 82 Date: April 15, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: June 14, 2015 | Permit id: Pa107810 | |||||
SCORE 82 Date: June 12, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: August 13, 2015 | Permit id: Pa110191 | |||||
SCORE 82 Date: June 26, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: August 27, 2015 | Permit id: Pa111108 | |||||
SCORE 82 Date: June 4, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: August 6, 2015 | Permit id: Pa110536 | |||||
SCORE 82 1838 11th Street Nw Washington Dc Excavation to install lateral sewer and water service from public main Contractor: Nefta Vasqez Permit status: Cancel/withdrawn | Expiration date: July 7, 2015 | Permit id: 0 | |||||
SCORE 82 1837 Wyoming Avenue Nw Washington Dc Excavation to install lateral water service front yard to property line Date: June 26, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: August 27, 2015 | Permit id: Pa111605 | |||||
SCORE 82 4511 Iowa Avenue Nw Washington Dc Excavation to install lateral water service from public main. Abandon 1" existing line using the same trench Date: July 30, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: October 1, 2015 | Permit id: Pa113064 | |||||
SCORE 82 Date: July 10, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: September 10, 2015 | Permit id: Pa112281 | |||||
SCORE 82 Date: July 16, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: September 17, 2015 | Permit id: Pa111109 | |||||
SCORE 82 3218 8th Street Se Washington Dc Excavation to install lateral water service from public main (1) abandonment of 2 small water tap from 8" watermain in in 8th street s. E. For 3218 and 3222 8th street s. E. (2) inspect installation of two 3" fire water connection with a two 8 x8x6" tees into 8" watermain in of 3218 and 3222 8th street s. E. Date: September 2, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: November 6, 2015 | Permit id: Pa113799 | |||||
SCORE 82 1619 Constitution Avenue Ne Washington Dc Excavation to install lateral water service from public main in roadway and sidewalk of constitution avenue n. E. Removal of a small water service for 1619 constitution avenue n. E. Installation of new 1-1 2 " combined tap connecting to existing 8" cip water main in constitution avenue n. E. Installation of new 1-1 2 " domestic water meter pit for 1619 constitution avenue n. E. Date: September 15, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: November 19, 2015 | Permit id: Pa114487 | |||||
SCORE 82 1501 4th Street Nw Washington Dc Installation of 2 new 1 1 2" domestic tap to 12" water main in 4th street n. W. Inspection of 6"x12" wye branch to combined sewer main in 4th street n. W. Inspect point up sewer tap to manhole on 12" combined sewer main in 4th street n. W at two locations 1501 and 1503 4th street n. W. Date: September 22, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: November 26, 2015 | Permit id: Pa114954 | |||||
SCORE 82 1817 Vernon Street Nw Washington Dc Excavate through the roadway and sidewalk to abandon the water and sewer services and install one (1) 1-1 2" combine water service and one (1) 4" pvc sewer lateral at 1817 vernon street nw. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Work hours are between 9: am to 3: pm monday through saturday. Date: October 27, 2015 Contractor: Nefta Vasqez Permit status: Permit expired | Expiration date: January 1, 2016 | Permit id: Pa116169 | |||||
SCORE 82 728 Park Road Nw Washington Dc Excavation to install lateral water and sewer service from public main Contractor: Nefta Vasqez Permit status: Cancel/withdrawn | Expiration date: January 13, 2015 | Permit id: 0 | |||||
SCORE 82 1838 11th Street Nw Washington Dc Excavation to install lateral sewer and water service from public main Contractor: Nefta Vasqez Permit status: Cancel/withdrawn | Expiration date: July 7, 2015 | Permit id: 0 |