Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3101 Wisconsin Ave Nw, Washington, Dc 20016 The track installer building the new track at the st. Albans school would like to continue laying the surface of the track. This activity may require the use of a large diesel generator which does not generate loud noise, but creates a low hum. Hand drills and a fork lift may also be used. An extra watch person will be used so that the back up alarm on the forklift can be disabled. The tennis court installers may also be adhering the carpet for the new tennis court surface or applying the clay in-fill. Neither activity produces excessive noise. Date: September 9, 2015 Contractor: Na Protestant Episcopal Cathedral Fdn Client: Na Protestant Episcopal Cathedral Fdn Dc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500726 |